Pocket doors disappear into the wall, so the differences between two suppliers are easy to miss on a quotation. Frame thickness, glass make-up, track quality and what sits inside the wall cavity all sit behind a finished face. Comparing Santerson Glass Pocket Doors against another proposal works best when you compare physical samples first and read the paperwork second. The same method applies to the Santerson Wood Veneer Pocket Doors range, because both are made to measure for residential projects rather than supplied in fixed sizes.
Start with what you can hold in your hands
Ask each supplier for a sample of the door leaf edge, the frame section and a piece of the glass or finish you are specifying. On a made-to-measure product this is the fastest way to see what is actually being quoted. In the Santerson configuration notes, sizing is made to measure and material and finish options are selected per project, so the sample tells you more than a line on a spreadsheet.
When the samples arrive, put them side by side on a bench rather than judging each one alone. Four checks are worth making:
- Leaf edge and core. Look at how the face material wraps the edge, whether the joint is visible, and whether the edge banding sits flush. A poorly finished edge is the first thing to chip on a door that slides into a pocket every day.
- Frame section. Compare the width and wall thickness of the frame that carries the glass or panel, and check how the glazing bead or panel rebate is fixed.
- Glass and finish. For a glass pocket door, note the tint, the reflectivity and how the surface behaves under raking light. For a veneer leaf, look at grain matching between samples from different batches.
- Hardware you can see. Track profile, hanger bracket material and the floor guide are all visible on a sample or drawing. Ask what brand or specification is quoted, not just "sliding gear included".
Read the proposal for the details that change the price later
Two quotations for "glass pocket door, bedroom" can differ by a wide margin and still both be honest. The gap usually sits in scope rather than profit. Before you compare totals, put each proposal into the same columns:
| Item to confirm | Why it matters for a pocket door |
|---|---|
| Opening size, finished height and leaf thickness | Made-to-measure products are priced on the dimensions you issue. If one supplier quotes structural opening and another quotes finished opening, the numbers are not comparable. |
| Glass specification | Toughened glass, laminated glass, tinted or frosted interlayers and any decorative treatment each change cost and safety classification. State what is required for the location. |
| Pocket cavity and wall build-up | The pocket must be framed to receive the cassette, track and stops. Confirm who supplies the cavity frame, who builds the wall, and whether the quotation includes it. |
| Track, hangers and floor guide | Ask for the specification or model. A soft-close gear and a basic runner are not the same product at the same price. |
| Finish scope | Check whether architraves, jambs, touch-up kit and any wall matching are included or listed as extras. |
| Packaging and delivery terms | Glass doors travel badly in loose packing. Ask how leaves are crated, and confirm the delivery term and who handles import clearance at destination. |
| Installation and snagging | Sliding doors need adjustment after the wall is finished. Establish whether setting, alignment and snags sit with the supplier or the local contractor. |
Santerson describes its project work as running through design consultation and space planning, material selection and product specification, manufacturing and quality control, project management and site coordination, then installation and handover. That structure is useful when reading a proposal: ask which stages are priced in the door quotation and which sit under turnkey furniture and building materials supply for the wider project. A pocket door quoted as part of a whole fit-out is coordinated with cabinetry, wall panelling and flooring; the same door bought as an isolated line item usually arrives without that coordination.
Check the drawings before you sign off
A made-to-measure order should come back with shop drawings showing dimensions, leaf thickness, glass make-up, handle and lock position, track location and the pocket detail. Read those drawings against the room, not against the quotation.
- Confirm clear opening width with both leaves fully open, and confirm which side the pocket falls on relative to furniture and switches.
- Check the finished floor level on the drawing. A sliding door needs a floor guide, and a change in floor build-up after the order is confirmed is an expensive correction.
- Verify handle and lock prep against the hardware you intend to use, including any through-bolt for a pull handle on a frameless glass leaf.
- Check the drawing against adjoining finishes. Where the door meets wall panelling, the reveal and architrave detail need to be agreed with both suppliers.
Compare on coordination, not just unit rate
For a villa or apartment package, doors rarely stand alone. Santerson supplies interior doors, sliding doors and pocket doors alongside built-in cabinetry, wardrobes, wall panels and flooring, which means one specification passes through one production and packing process. That reduces the number of trades reconciling dimensions on site. It also means you should ask for a door schedule covering every opening, so each leaf, frame and pocket is listed once with its size and finish.
Custom and OEM work is available where finishes need to match existing joinery or a design intent drawing. If your comparison involves matching a veneer to a specified cabinet run, ask for a sample of the actual batch rather than a catalogue photograph, and confirm in writing which reference the production order follows.
A short scoring sheet
Score each proposal from one to five on the items below. The lowest price that scores poorly on scope usually costs more than a mid-range quotation that includes the cavity frame, hardware specification and installation adjustments.
- Sample quality: leaf edge, frame section, glass or veneer finish
- Completeness of dimensions on the shop drawing
- Hardware named by specification rather than described generically
- Pocket cavity and wall interface clearly assigned to one party
- Delivery terms, packing method and import responsibility stated
- Installation, adjustment and snag list included or priced separately
- Responsiveness of the supplier's technical answers during sampling
Working through samples, drawings and scope in that order takes a few days and removes most of the guesswork from comparing pocket door quotations. Send your opening sizes and finish references to the Santerson project team, and request a made-to-measure proposal with shop drawings so you can compare it against your other bids line by line.