A submittal is the package a buyer, builder or designer reviews before laundry joinery is released for manufacture. For Stacked Laundry Units, the submittal does two jobs at once: it proves the unit fits the room and the appliances, and it fixes in writing which finish, layout and dimensions are being produced. A thin submittal causes rework on site. A complete one lets everyone sign off on the same drawing before production starts. Below is the checklist we work to when a stacked laundry unit goes through approval.
1. Dimensioned drawings, not just a product photo
Stacked Laundry Units are made to measure, so the first page of the submittal should be a dimensioned elevation and plan drawn to the site opening, not a catalogue image scaled by eye. Ask for overall height, width and depth; the clear internal envelope that receives the stacked washer and dryer; the position of any services you intend to keep behind the cabinetry; and the floor finish level, because a tiled floor added after the drawing is signed will change what the unit can be.
Include the appliance footprint you are designing around. Machines from different suppliers differ in depth and in how far the door, hoses and controls project, so state the model or the clear width, height and depth you need, then show the clearance left around it. If the unit sits in a bathroom, also mark door swing, towel rail and any adjacent vanity so the drawer run is not blocked.
2. Layout and storage configuration
The submittal should show how the vertical stack is organised, because that is where projects differ most. Confirm which sections carry the appliances, where hanging or folding space sits, whether a Pull Out Laundry Hampers section is included, and what sits above the machine stack. If your scheme uses more than one laundry zone in the dwelling, note how this unit relates to the Laundry & Storage Combo or the Multi Function Tall Cabinets so heights and panel lines match across rooms.
Mark opening direction for every door and drawer, plus the hardware type. A submittal that only shows a front elevation hides the fact that a drawer cannot clear a wall return or a tapware spout.
3. Materials, finishes and moisture exposure
State the board, panel and surface finish by name for each visible face, plus edge treatment on shelves and returns. Material and finish options are specified per project, so a submittal that says "as shown" gives the factory nothing to hold to. Where the unit shares a wet bathroom with showers and baths, say so in the submittal and ask which board and finish selection is being applied for that exposure, along with how the plinth and floor line are detailed against the tiled surface.
If the same finish appears elsewhere in the project, attach the reference used for that other joinery so colour and grain are matched at approval stage rather than argued about after delivery.
4. Interface conditions with services and structure
Laundry failures on site are usually interface problems, so the submittal should record them explicitly: water inlet and outlet locations and heights; power point position relative to the machine recess; whether ventilation is ducted and where it runs; wall build-up and whether the wall can take any wall-hung component; and the ceiling or bulkhead line if the unit runs full height. A short interface schedule next to the drawing, listing each service with its set-out dimension, is worth more than a paragraph of notes.
5. Documentation and approvals to attach
- Marked-up shop drawing with revision number, date and the project name on every sheet.
- Appliance clearance diagram and the appliance data sheet you designed around.
- Finish schedule with sample reference codes, and a physical sample where colour matching matters.
- Hardware specification: hinges, runners, handles and load rating for pull-out sections.
- Packing and delivery plan, including how the unit is delivered — assembled or flat-packed — and access constraints at the site.
- Installation sequence and who carries out each step, coordinated with the trades that finish the floor, wall and services.
Before you approve: three checks that catch most problems
- Does the drawing dimension match the finished floor and wall build-up, not the bare shell?
- Is every door and drawer shown clear of an obstruction when open?
- Are board and finish named for each face, including edges and the plinth?
6. What the supplier returns for approval
Laundry joinery is part of a wider fit-out scope, so the same drawing discipline applies to adjacent items such as WasherDryer Cabinets, Compact Laundry Solutions and the surrounding Bathroom Sanitary Fixtures. Send the room drawing, the appliance choice and the finish direction for the rest of the project, and the supplier comes back with dimensioned elevations, a layout proposal and a finish schedule you can circulate for approval. Because these units are made to measure, dimensions and selected specifications are confirmed per project at that stage rather than assumed from a catalogue size.