A wardrobe order does not end when the factory releases it. For a villa or apartment project overseas, the difference between a smooth handover and a stalled site often comes down to how the shipping, packaging and unpacking sequence was planned while the hanging modular wardrobes were still on the drawing board. This guide walks through the stages we work through with overseas buyers, from the first measurement sheet to the last door adjustment.
Why hanging modular wardrobes need more logistics thought than a loose wardrobe
Hanging modular wardrobes are built as made-to-measure components: carcasses, back panels, doors, rails, drawers and hardware that are assembled on site against the wall. Each hanging modular wardrobe set in our Modular Wardrobes collection is specified to project dimensions, with layout, material and finish chosen room by room.
That built-in, made-to-measure nature creates three practical logistics consequences:
- Panels are large and awkward. A full-height side panel will not fit in a standard parcel, so it travels as crate or flat-pack cargo and must be handled with the right equipment at both ends.
- Everything is project-specific. Panels for Bedroom 3 cannot substitute for panels in Bedroom 4. If one crate is opened at random on site, installers lose time finding the right parts.
- The wall is part of the product. A hanging system fixes into the structure, so the delivery date has to line up with when those walls are finished, flat and ready to accept fixings.
Planning around these three facts is what makes international delivery manageable rather than lucky.
Stage 1 — Confirm the site survey and get a shop drawing signed off
Made-to-measure joinery only travels well once the numbers behind it are fixed. For each wardrobe position, we ask the project side to supply a site survey covering finished floor levels, wall construction behind the hanging zone, and the exact height available under ceilings, cornices and any bulkheads. From that survey we produce shop drawings showing every panel, rail line, drawer stack and door opening.
Those drawings are the document worth spending time on. They carry the room number, the drawing number that will later appear on each crate, and the finish reference for that room. Before production starts, we ask project buyers to confirm:
- Final room-by-room dimensions, including floor level differences, skirting, cornices, and the position of switches, power points and downlights that affect door swing.
- Wall construction behind the hanging zone, so the correct fixings are supplied for stud, brick or concrete.
- Ceiling and cornice lines, including whether the unit runs to the ceiling or stops below a bulkhead.
- Finish and material selection, with a signed sample reference for veneer, lacquer, melamine or glass fronts where colour match matters across rooms.
- Internal layout per wardrobe: hanging rails, shelf-focused sections, drawers, or a mix.
For projects that also order other built-in joinery, it is worth placing the custom built-in kitchen cabinets and wardrobes on one production schedule. Same-room finishes then come off the same batch, and the two trades arrive on site in a sensible order instead of competing for space.
Stage 2 — Choose the shipping mode around the project programme, not just cost
Our furniture logistics and door-to-door delivery service arranges freight by sea, air and rail, together with the commercial paperwork that goes with it. For a full villa or apartment floor of wardrobes, the practical choice usually comes down to sea freight in a shared or dedicated container.
| Situation | Usual approach | What to watch |
|---|---|---|
| Whole-project order: wardrobes plus kitchen, doors and other fit-out items | One consolidated container booked after the last trade item is ready | A single container moves once; mixed partial shipments multiply customs entries and site confusion |
| Wardrobes only, one or two units, tight deadline | Air freight for hardware and small components, sea freight for panels | Splitting a set across two modes means installers cannot start until both arrive |
| Phased project, several buildings or towers | Container per phase, timed to the construction programme | Storage at destination port is costly; each phase needs its own delivery window agreed with the site |
Whichever mode you choose, agree the Incoterms and who is responsible for import clearance before production begins. We prepare commercial invoices, packing lists and certificates of origin as part of the shipment; the importer of record normally handles destination customs entry, duties and any permits. Confirm those local requirements with your own broker for the specific destination — they vary by country and change over time.
Stage 3 — Pack and label for the installer, not the warehouse
A well-packed wardrobe shipment is one where an installer on site can identify every crate without opening it. For hanging modular wardrobes we organise packing around the room schedule:
- Group by room, not by part type. All panels for one wardrobe set travel together, so a missing door is noticed in one place rather than searched across the container.
- Label to the drawing number. Crate labels match the shop drawings and room numbers the site team already uses, including the hanging rail and fixing kits for that set.
- Protect edges and faces separately. Finished faces and door edges take the damage in transit; corner protectors and face protection are what keep a snag list short.
- Ship hardware in numbered kits. Hinges, runners, handles and fixings travel in labelled sets tied to each unit, so nothing needs to be sorted on site.
- Photograph the loading. A loading record supports any insurance claim and helps confirm what left the factory.
Ask for a crate-by-crate packing list before the container is dispatched, and pass it to your site foreman with the drawings. That single step saves more time on arrival than almost anything else in the process.
Stage 4 — Sequence the delivery window with the site programme
Built-in wardrobes are an early-finishing trade. Work backwards from your installation date and check these gates:
- Wet trades, screed and plaster have dried; floor levels are final.
- Electrical first-fix is complete and positions confirmed against the wardrobe drawing.
- A clean, lockable storage area exists at the destination — wardrobes should not be the last thing unloaded onto an open site.
- The receiving dock, lift or stairwell can physically accept full-height panels; measure the access, not just the room.
- The installation crew is booked for the week the container clears, so panels are not left sitting on site.
Stage 5 — Receive, inspect and install in one controlled pass
On arrival, we recommend the site team follow a short, fixed routine:
- Check crates against the packing list before signing. Count crates, note any damaged packaging on the delivery paperwork, and photograph it.
- Open one room's set at a time. Inspect faces and edges, confirm hardware kit contents, then re-cover the panels until installation.
- Test-fit one unit first. Assembling a single wardrobe confirms wall conditions, levels and door alignment before the whole floor is opened.
- Record snags with crate numbers. If a panel needs replacement, an exact reference lets us produce and ship the part rather than guessing from a photo.
Our installation and after-sales support covers on-site guidance, inspection and snag resolution, plus spare parts for later replacement. For larger projects we coordinate with the local crew so alignment, door gaps and soft-close hardware are set correctly at handover.
A six-point checklist before you place the order
- Has a site survey been completed, and are the shop drawings signed off?
- Are final dimensions confirmed, including wall construction and electrical positions?
- Is one party clearly named for import clearance, duties and last-mile delivery?
- Will the wardrobes ship in one consolidated movement, or does a phased plan exist?
- Does the destination site have storage and access that suits full-height panels?
- Is the installation crew booked against the expected arrival week?
If any answer is "no", fix it at quotation stage. Changes are cheap there and expensive after production.
Planning a wardrobe order for an overseas project?
SANTERSON manufactures hanging modular wardrobes alongside the wider modular wardrobe range, and supports the same order through custom furniture manufacturing, production coordination and door-to-door logistics under one turnkey project solution. Send us your room schedule, drawings and destination port, and we will quote the wardrobes together with a realistic delivery sequence for your site.