A set of wood grain melamine cabinets rarely travels alone. Panels, carcasses, doors, hardware, worktops and sometimes lighting all move together, and any one of them arriving late or damaged can hold up the whole kitchen handover. The good news is that cabinetry is one of the most predictable categories to ship internationally — if you plan the order around how it will be measured, packed, cleared and installed from day one.
The checklist below follows the order from the factory floor to site acceptance, using the workflow SANTERSON runs as a furniture and building materials manufacturer: design confirmation, production, packing, freight and customs, delivery, then installation support.
1. Lock the specification before you lock the container
Melamine cabinetry is made to measure, so the shipping plan starts with drawings rather than with a forwarder. For each kitchen in the project, confirm:
- Final room dimensions and floor levels, including any tolerance on walls that are not yet plastered or tiled.
- Door style, grain direction and edge treatment, since wood grain melamine panels have a fixed grain orientation and mismatched directions show up immediately once doors are hung.
- Appliance schedule — oven, hob, dishwasher, fridge — with model dimensions, because cut-outs cannot be corrected on site.
- Worktop material and thickness, sink type and tap hole positions.
- The finish family you are standardising across the project. Related options such as textured melamine cabinets and matte melamine cabinets are often mixed with wood grain fronts on the same job, and each combination needs its own approval sample.
Buyers who order several villas or apartment units at once should keep one specification sheet per unit type. Repeating an approved specification is what makes multi-unit production and consolidated shipping workable; changing it mid-production creates the delays that then get blamed on freight.
2. Decide the Incoterms and who owns each step
Before you compare freight quotes, decide where your responsibility ends. The practical difference between options is who books the vessel, who pays duties, and who answers questions at the port.
| Arrangement | Who arranges main carriage | Who handles import clearance | Best fit |
|---|---|---|---|
| EXW / FOB | You, through your own forwarder | You | Buyers with an experienced local customs broker who already handles joinery imports |
| CIF / CFR | Supplier, to the destination port | You | Buyers comfortable clearing cargo but wanting the supplier to handle export leg |
| Door-to-door | Supplier, all the way to site | Supplier's agent | Contractors and developers without in-house logistics staff |
SANTERSON arranges freight forwarding by sea, air and rail, together with the customs paperwork, container loading and tracking that go with it, right through to furniture logistics and door-to-door delivery. Whichever option you choose, get the terms in writing on the proforma invoice, including the currency, the named destination, and who pays for cargo insurance. Transit times vary by route and season, so treat any schedule as an estimate and build float into your site programme rather than presenting it to your client as a guarantee.
3. Plan packing around installation sequence
Cabinetry arrives flat packed or as assembled carcasses, and how it is packed determines how fast the install crew can work. Ask the factory to pack by room and by unit type, with every carton labelled against the drawing number it belongs to — not simply by production batch.
- Ask for a packing list that matches the drawings one-to-one, so an installer can find "Unit 3 tall cabinet" without opening cartons.
- Have doors, panels and worktops protected on the edges, since chipped corners on melamine board are the most common transit damage and cannot be patched invisibly.
- Confirm how hardware is separated — hinges, runners and handles in labelled sub-boxes rather than loose in the largest carton.
- For multi-unit projects, request that each unit's components are packed as a complete set, so one apartment can be finished even if another set is still on the pallet.
- Agree what happens to spare panels. Ordering a small percentage of replacement doors and side panels in the original production run costs far less than reordering them later, when grain and batch matching are no longer possible.
Container loading matters as much as packing. Heavier carcass cartons go on the floor, tall panels stand where they will not be crushed, and the last units needed on site should ideally be loaded last so they come off first. If your site has a narrow delivery window, say so before loading.
4. Prepare customs documents early
Documentation causes more delay than cargo does. For a cabinetry shipment you will normally need a commercial invoice, packing list and bill of lading or air waybill; a certificate of origin is common where a preferential rate applies, and some destinations ask for import permits or timber-related declarations on board-material products. Your broker in the destination country has the final say on what they require — send them the draft documents before the cargo sails, not after it lands.
Two details are worth checking line by line: the declared description and HS classification for cabinets and panels, and the total weight and volume figures. A packing list that disagrees with the actual weights on the bill of lading is a reliable way to trigger an inspection. If duties or taxes are your responsibility, budget them as part of the landed cost from the start rather than discovering them when the container is already at the port.
5. Book the receiving side before the vessel arrives
A container of cabinets is only useful if a truck, a dock and a crew can take it. Confirm these in advance:
- Delivery access at site — vehicle size limits, booking slots for lifts, and whether the cabinetry can go straight to the floors where it will be installed.
- Storage. Melamine panels should stay in their cartons, off the ground and in a dry, covered space until installation; on a wet building site that means an indoor holding area, not a marquee.
- Inspection routine. Open the packing list, count against it, photograph any damaged cartons before signing the delivery note, and report damage the same day with photos and carton numbers so insurance and replacements can start immediately.
6. Close the loop with installation and after-sales
The last step of the delivery plan is the one most buyers forget: who hangs the doors, adjusts the runners and signs off the snags. On-site installation, snag inspection, warranty cover and spare parts are part of furniture installation and after-sales support, and coordinating that stage with the factory while the cargo is still at sea means corrections can be made before the programme slips.
If your project needs more than cabinetry — wardrobes, doors, wall panelling, flooring or bathroom fixtures from the same supplier — consolidating them on one shipment and under one project coordinator removes a whole category of coordination risk. That is the practical reason buyers work with a one-stop furniture and building materials supplier instead of running five separate consignments.
A quick pre-shipment checklist
- Drawings, grain direction and appliance schedule signed off by the client.
- Incoterms, insurance and named destination confirmed on the proforma invoice.
- Packing list matched to drawing numbers, per room and per unit.
- Draft customs documents reviewed by the destination broker before sailing.
- Site access, storage and inspection routine booked in advance.
- Installation sequence and snag process agreed with the factory while cargo is in transit.
Send us your drawings, unit counts and destination, and we will quote the cabinetry together with a packing plan and delivery option that fits your site programme — including wood grain melamine cabinets specified to your dimensions and finish.