A mirror sliding door wardrobe looks simple on a rendering: two or three mirrored panels gliding across a bedroom wall. In procurement it is one of the easier built-in items to get wrong, because glass, moving hardware and made-to-measure joinery all meet in the same elevation. A product submittal is where those risks are settled before an order is placed. Below is the package we ask project teams, contractors and interior consultants to review with us for every Mirror Sliding Door Wardrobes order.

1. Confirmed dimensions and the opening itself

Our mirror sliding door wardrobes are made to measure, so the submittal starts with the finished opening rather than a nominal module size. The drawing should record width, height and depth as they will be at handover, plus which finishes the wardrobe will meet on each side: floor covering, skirting, ceiling, wall board or tiled surface. Where a room is out of square or the ceiling is not level, that needs to be stated in the submittal instead of discovered on site.

  • Floor-to-ceiling height measured at several points, not one
  • Whether the unit sits on the finished floor or a recessed/boxed base
  • Obstructions: light switches, air grilles, door swings, skirting depths
  • Clearance needed for the door panels to overlap and travel

2. Door layout and how the panels actually travel

Sliding wardrobe doors are specified by panel count, stacking side and track arrangement. Two panels on a single line behave differently from three or four panels on a bypass or bi-parting track, and the number of panels changes what access you get to each bay. The submittal drawing should show every elevation with the doors in both the open and closed position, so the buyer can see which compartment is reachable at any time.

  • Panel count and stacking direction relative to the bed and windows
  • Track type: top-hung, bottom-rolling or bypass, and where the rails sit
  • Panel overlap and the resulting gap at the centre stile
  • Whether any bay becomes inaccessible when doors are parked

3. Mirror glass: type, backing and edge treatment

Glass is the part of this product that most often gets specified too loosely. The submittal should name what the mirror panel is made of, how it is backed and framed, and how the edges are finished, because those details decide both appearance and safe behaviour in daily use. Framed mirror panels with an aluminium or board border behave differently from a full-height glass surface, and they also read differently next to the wall finishes.

  • Mirror type and thickness, plus backing and safety film where specified
  • Frame material and colour: aluminium profile, board panel or mixed insert
  • Edge finish: polished, bevelled or framed rebate
  • How the mirror meets handles, keyholes or integrated lighting

Related options in the same sliding-door family are worth comparing at submittal stage if the design intent is a softer surface than glass. Matte Sliding Door Wardrobes and High Gloss Sliding Door Wardrobes share the same made-to-measure approach, which makes it easy to mix a mirrored main bedroom with matte or gloss doors in smaller guest rooms.

4. Hardware and moving components

A sliding wardrobe is judged on how it feels after a year of use, and that comes down to hardware. The submittal should list the track, rollers, buffers, handles and any soft-close or damping components as named items with make and finish, not as "hardware as per standard". Where a project repeats the same wardrobe across many rooms, this is also the document that keeps the roller specification identical from the first room to the last.

  • Track profile and roller set, including load rating for glass panels
  • Buffers or dampers at each end of travel
  • Handle style, finish and whether handles are recessed into the stile
  • Spare-parts items to ship with the order for future maintenance

5. Carcase, interior layout and finishes

Behind the doors, the wardrobe is a piece of built-in joinery, and the submittal should describe it as such. Board material, edge treatment, colour or veneer reference, and the internal zoning all belong on the drawing. We tailor internal layouts to how the space will be used, so hanging heights, drawer banks, shelf runs and shoe or accessory zones are agreed in the submittal rather than assumed from a catalogue image.

  • Board specification and edge banding for visible surfaces
  • Colour, laminate, lacquer or veneer reference for interior and exterior faces
  • Hanging areas: single, double, pull-down rail or long-hang bay
  • Drawers, shelves, and any lighting inside the carcase

For bedrooms where storage capacity matters more than a reflective front, our Custom Minimalist Bedroom Wardrobe shows how the same custom sizing and internal zoning logic is applied to flat panel and handleless doors.

6. Corner rooms, walk-in runs and alternatives

Mirror doors are not always the right answer where a run turns a corner. In an L-shaped or U-shaped room, sliding panels can bind at the return or block the corner bay entirely. If the bedroom layout includes a turn, the submittal should say which solution is being carried forward, and it is better to test that decision on paper than during installation.

7. Samples, drawings and sign-off records

The paperwork half of a submittal is what protects the programme later. Before production we work from approved shop drawings and physical references, so the buyer can check the mirror tone against the room's lighting rather than against a photo. A complete package normally includes dimensioned elevations and sections, an internal layout drawing, finish and hardware schedules, sample references for board colour and frame profile, and a signature or written approval from the party responsible for design intent.

  • Shop drawings: elevations, sections, plan, door travel positions
  • Finish schedule with named references, not descriptive adjectives
  • Hardware schedule with quantities per unit and spares
  • Written approval, dated, with the revision number of the drawing signed off

8. Packing, delivery sequence and installation interface

Glass-fronted sliding wardrobes arrive as panels, carcase components and hardware, and they are fragile in exactly the way a site schedule dislikes. The submittal should state how units are packed and labelled, which room each crate belongs to, and where the goods are staged on site. It should also record the interface with other trades: who supplies the level floor and finished wall faces, whether power is required for interior lighting, and what must be complete before the wardrobe is installed.

  • Panel protection method and crate labelling by room or unit number
  • Delivery sequence matched to room completion order
  • Site conditions required before installation begins
  • Inspection and snag items agreed in advance for handover
A practical test for any submittal: if a fitter could install the wardrobe from these documents alone, without a phone call to the designer, the package is complete. If they would have to guess at a track type, a mirror edge or a hanging height, send it back for revision.

As a one-stop furniture and building materials supplier, we prepare these submittal packages with the project team and build to the approved drawings under our custom and OEM service. Send us the room dimensions and the design intent, and we will return dimensioned elevations, a finish and hardware schedule, and sample references for review before anything goes into production.