A wall-mounted sideboard looks simple on a drawing. It is a cabinet, fixed to a wall, and it holds glassware, linen and serving pieces. The reason these units fail in the field is rarely the cabinet itself — it is the absence of a plan that covers the wall behind it, the services inside it, and the sequence that gets a made-to-measure unit from a factory floor to your site.
This article sets out what a complete installation plan for Santerson Wall Mounted Sideboards should contain, written for the project teams who order these units: interior designers, main contractors, developers and villa owners' representatives.
Start With the Room, Not the Cabinet
Our wall mounted sideboards are made to measure for residential living projects. Finish, layout and dimensions are specified per project rather than chosen from a fixed size grid, which means the plan has to arrive at the factory with real information in it. Before any dimension is confirmed, record four things about the space:
- The run. Where does the sideboard begin and end in relation to doors, corners, radiators and window reveals? A unit that clashes with a door swing becomes a site modification, and site modifications on a finished panel are visible.
- The floor line and ceiling line. Take levels at both ends of the run, not just one. On older villas and renovated apartments the floor is rarely level across three metres, and a wall-hung unit is set out from a datum line, not from the floor.
- The finished wall build-up. The total thickness of plasterboard, battening, tile or stone cladding decides how far the fixing fasteners must reach and whether the bracket geometry needs an extension. State the build-up in the plan as a measured figure.
- The neighbouring finishes. Note the material on either side of the unit so the shadow gap, return or trim detail is drawn rather than improvised with sealant on site.
The Wall Structure Section: What Actually Carries the Load
A loaded sideboard is heavy — carcass, doors, glass shelves and their contents combined. The plan must state what the cabinet is fixed to, in writing, for each fixing position. This is the single most common omission.
| Wall type | What the plan must record |
|---|---|
| Timber or steel stud framing | Stud positions and centres marked on the setting-out drawing; timber nogging or a continuous batten at the fixing line, sized for the load and fixed to the studs, not to the board. |
| Solid masonry or concrete | Substrate confirmation, fastener type and embedment depth, and whether the wall is rendered or clad over — cladding alone cannot carry the unit. |
| Plasterboard only | Treat as unsuitable without structural backing. The plan should show the reinforcement that will be installed before the cabinet arrives. |
| Stone, tile or decorative panel cladding | Where fixings penetrate the finish, whether a cut-out or through-fix is acceptable, and who repairs or trims the surround. |
| Glass partition or lightweight screen | Do not hang on it. Re-siting the unit or introducing a dedicated support wall is a design decision to make early. |
Services, Lighting and Ventilation
Wall-hung units frequently sit over or beside services. Put them on the drawing before the carcass is cut:
- Electrical. Socket positions behind or beside the unit, the switch location, and the cable route for any internal lighting. Decide now whether the driver sits inside the cabinet or in an accessible external location.
- Plumbing. Where the sideboard shares a wall with a wet area, confirm pipe positions so fixing holes can be avoided or the fixing line moved.
- Air and heating. Grilles, diffusers and radiators in the run affect both the setting-out and whether the back panel needs an allowance.
Where integrated lighting is part of the design, our wall mounted display cabinets page follows the same made-to-measure approach, and the two are often specified together in one dining or living wall. Keep the electrical specification with the joinery drawing so the two trades see one coordinated set.
Configuration Details to Lock Before Production
Because these units are configurable, every variable you leave open is a decision someone will make for you later. Confirm in the plan:
- Overall height, width and depth, plus the mounting height — the distance from finished floor to the underside of the unit. This governs clearance for chairs, tables and the worksurface above.
- Internal layout: shelf positions, drawer banks, cutlery trays, provision for glassware, and any aperture for built-in appliances or a wine cooler if one is planned.
- Door type and opening direction, and the clearance each door needs when open — especially at a corner or beside a tall unit such as our tall dining cabinet.
- Finish and material selection, with the reference recorded rather than described in words. Colour names vary between suppliers; a sample or reference code does not.
- Edge and return details at exposed ends, and how the unit meets the ceiling or an overhead cabinet.
Where the dining wall extends beyond storage into display, our decorative dining cabinets are specified on the same made-to-measure basis, so a single setting-out drawing can carry both and keep the reveals consistent.
Access, Handling and Delivery
A made-to-measure carcass is built as one piece unless the plan says otherwise. Before production, check that it can physically reach the room: stair widths and turns, lift dimensions and lift car height, door widths on the route, corridor corners, and whether a crane or hoist is realistic on an upper floor. Record the answer in the plan.
If the route does not accommodate a full-size unit, tell us at the design stage — a carcass can be split into sections with a concealed joint when that is decided in advance. We handle freight and door-to-door delivery, including packaging and container loading planning, so the access constraint needs to be in the file before packing is specified rather than after the crate lands.
Sequencing: Who Does What, and When
The plan should name responsibilities and dates. A typical sequence for a wall-hung unit:
| Stage | Owner | Completion condition |
|---|---|---|
| Setting-out and levels confirmed on site | Main contractor / site supervisor | Datum line marked; wall build-up and reinforcement signed off |
| Services first fix complete and tested | Electrical and plumbing trades | Positions match the joinery drawing, not a separate schematic |
| Reinforcement and blocking installed and verified | Main contractor | Verified before wall closure, with photographs kept |
| Wet trades and finishes complete | Main contractor | Wall dry; paint or cladding at final level |
| Delivery to site, inspected for transit damage | Supplier and site receiver | Damage noted on the delivery paperwork the same day |
| Hanging, levelling and door adjustment | Installer | Unit level, doors aligned, fixings torqued to specification |
| Snag list, sign-off and handover record | All parties | Signed snag sheet; spares and adjustment instructions handed over |
The most expensive failure in this sequence is installing reinforcement, closing the wall, and then discovering the joinery drawing assumed a different fixing line. Photograph blocking and services before the wall is closed and circulate those photographs with the setting-out drawing.
Site Conditions That Affect a Finished Panel
Timber-based panels, lacquered and laminated finishes and edge banding respond to moisture and temperature. The plan should state where the units are stored between delivery and installation — dry, covered, off the floor, and not in a room where wet trades are still running. A unit delivered on time and ruined by storage is still a lost unit.
Where the sideboard sits near a kitchen, a wet area or a façade that receives direct sun, note it in the plan so the finish selection accounts for heat and light exposure rather than discovering it after handover. Our glass front dining cabinets involve the same considerations, with the added question of glass handling and protection on site.
Documentation to Attach to the Plan
- Setting-out drawing with dimensions, datum line, mounting height and fixing positions.
- Wall build-up detail and reinforcement specification for each fixing line.
- Coordinated services drawing showing sockets, switches, lighting circuits and cable routes.
- Signed configuration sheet: sizes, internal layout, door schedule, finish references.
- Access and handling route assessment, with any split-carcass decision recorded.
- Delivery note, inspection record and snag sheet template agreed before the goods arrive.
How Our Team Supports the Installation Plan
We work as a manufacturer of furniture and building materials for residential, villa and hospitality projects, so the installation plan is part of the order rather than an afterthought. Send us the setting-out drawing and the wall build-up with your enquiry, and we will confirm the fixing approach, flag any dimension that cannot be produced or delivered as drawn, and coordinate the configuration sheet before production starts. Installation and after-sales support — on-site fitting, inspection and snagging, spare parts and maintenance — sit within the same scope, so one party remains accountable from drawing to handover.
If you are specifying a dining or living wall for a project, start with the Santerson Wall Mounted Sideboards product page and send us your drawings. We will return a configuration that fits the wall you actually have, at the height you actually need, with the fixing detail settled before a single panel is cut.