A corner wardrobe with hinged doors is one of the most useful ways to use an awkward angle in a bedroom, dressing room or villa suite — and one of the easiest to get wrong. The unit sits across two walls, so every dimension interacts with another: door swing against the adjacent run, carcass depth against skirting and architraves, hanging heights against ceiling level. Before a hinged door corner wardrobe goes into production, the drawing package needs a defined set of measurements and project inputs. This guide lists what to record on site and what to decide in the design brief, so the quotation you receive matches what fits on the day of installation.
Why corner units need a different measurement routine
A straight wardrobe run can be checked with one overall width and two height readings. A corner unit has an internal angle that is rarely exactly square, plus returns on both sides that may be interrupted by doors, radiators, windows or out-of-plumb walls. Two practical consequences follow. First, the carcass is designed from a verified set of points rather than a nominal room size, because a deviation in one return changes which door layout can open freely. Second, hinged doors add a swing arc that sliding doors do not: the space in front of each door must be free of beds, vanity units, other doors and the traffic line through the room.
Our Interior Design Services cover space layout planning and furniture layouts precisely because these clearances are decided at the layout stage, not after production. If your drawings already show the room furniture, send them; if they do not, that gap is itself a project input worth resolving before you request a price.
Site measurements to record
Take each measurement at three points along the same line — low, mid and high — and note the smallest value. Walls in older villas and renovated apartments are seldom parallel.
| Measurement | What to record |
|---|---|
| Return lengths (left and right) | Finished-wall length available for the wardrobe on each side, measured from the corner apex to the end of the run, at three heights. |
| Internal angle at the corner | Whether the corner is square or out of angle, and by roughly how much. Note any pilaster, column or boxed service run sitting in the corner. |
| Carcass depth required | Clear depth from finished wall face to the front of the carcass, including skirting, architrave, and any insulation or cladding build-up on the wall. |
| Height profile | Floor to ceiling at several points, plus the position of cornices, ceiling recesses, downlights and air-conditioning grilles that limit a top panel. |
| Obstructions on both walls | Switches, sockets, thermostats, radiator tails, window reveals and door openings with their swing direction — each with a distance from the corner. |
| Floor condition | Finished floor level, thresholds, underfloor heating zones, and whether the floor is level across the whole footprint of the unit. |
| Front clearance for door swing | Distance from the planned wardrobe face to the nearest fixed item in front of it, measured at each door position. |
Inputs that come from the brief, not the tape measure
Dimensions tell the factory what to build around. The following decisions tell it what to build.
- Layout shape. Corner units are usually planned as an L run across both walls, or as a U configuration when a third side is available. Our L Shaped Corner Wardrobes and U Shaped Corner Wardrobes pages cover the two shapes we quote most often; both are made to measure.
- Door type and door count. Hinged doors give full access to the interior and can carry a mirror or a panel profile, but they need front clearance. Where the room is tight, compare against Sliding Door Corner Wardrobes before you commit.
- Hinge side and opening sequence. Which door hangs left or right, and whether doors meet on a shared post or one butts into the return carcass. This determines handle position and whether drawers can open in front of an adjacent door.
- Interior zoning. Long hanging for coats and dresses, double hanging rails, shelf stacks, drawer banks, trouser slides, shoe shelving, a safe or an ironing station. List what actually hangs in the household or guest room, and give approximate counts so rail lengths and shelf spacing are set correctly.
- Material and finish. Carcass board, door substrate, front finish — veneer, lacquer, melamine, acrylic, glass — plus edge treatment and hardware. Our Custom & OEM Service covers bespoke finishes, textures and hardware selection.
- Fixing conditions. What the wall will accept, whether the unit is scribed to an uneven wall with a filler panel, and whether it must stop short of a cornice.
How these inputs move the quotation
Two rooms with identical return lengths can produce very different prices. A square corner with parallel walls allows standard carcass modules and a simple scribe. An out-of-angle corner needs cut carcasses, angled filler panels and a door plan that avoids binding. Deep units need stronger shelf spans and rail support; shallow units lose hanging depth and may require a different hardware set. Every one of these is visible in the drawing package, which is why we ask for the measurements above together rather than an approximate room size.
For projects that combine joinery with other fit-out items — kitchen cabinets, bathroom fixtures, flooring, lighting and wall finishes — put the wardrobe drawings into the same coordination round as the rest of the package. Door openings, skirting lines and floor levels are decisions other trades also depend on.
A practical sequence for procurement
- Send the room drawings or photographs plus the measurement sheet above. Mark obstructions with distances from the corner apex.
- Confirm layout shape, door type and interior zoning against the household or guest-room inventory.
- select carcass board, door substrate and finish; review samples before the drawing is signed off.
- Check the production drawing: overall widths on both returns, depth at each end, door swing arcs, drawer positions relative to doors, and top-panel treatment at the ceiling.
- Agree delivery and site readiness — finished floor levels complete, decoration finished, and clear access for the panels on installation day. As a one-stop furniture and building materials supplier we handle door-to-door delivery, and our installation and after-sales support covers on-site fitting and snag inspection.
Before you enquire: have the two return lengths, the depth you can offer, the ceiling height at three points, a photograph of the corner itself, and a list of what needs to hang inside. With those five items, a first layout proposal and an indicative price are usually possible without a second round of correspondence.
Corner angles go unused in most bedrooms only because nobody measured them properly. Send us your room dimensions and the brief behind them, and we will specify a hinged door corner wardrobe that opens fully, hangs properly and finishes flush to the walls around it.