A set of arched French doors looks simple on a drawing. Two leaves, an arch overhead, glazing bars across the glass. What arrives on site is a different matter: frame profile, leaf thickness, glazing build, ironmongery, finish, and the opening they have to fit into. When those items are written down as assumptions rather than decisions, the variations surface after production has started.
This guide sets out the fields we need for Santerson Arched French Doors, in the order they get settled, and shows how a written specification keeps the doors aligned with the joinery, wall finishes and flooring around them.
Why arched doors need a more precise brief than rectangular ones
A rectangular door can fall back on standard sizes. An arched opening cannot. The curve sets the geometry of the head, and every downstream decision follows from it: how the arch springing relates to the jamb line, where the glazing bars stop, whether the two leaves meet symmetrically under the crown, and how the arch reads against the ceiling or the reveal above.
Because these doors are made to measure, with material and finish options selected per project, there is no default configuration to fall back on. The specification you send is the specification that gets manufactured. Two projects using the same product name can end up with quite different doors, and that is by design.
The five blocks of a complete door specification
1. Opening geometry, taken from site, not from drawings alone
Send the structural opening width and height, plus the springing height — where the arch begins to curve from the vertical jamb. Note which face the reveal sits on and how much of the finished floor build-up is still to come, because a door set before the screed or flooring goes down will sit at the wrong level. Where the opening is out of square, say so; an arched head amplifies small deviations.
2. Leaf arrangement and how the doors are used
State whether both leaves work or one is fixed, which direction they swing, and what passes through the opening day to day. A pair that divides a living room from a terrace is opened constantly and needs hardware chosen for that traffic; a pair that closes off a study may spend most of its life shut, which changes what worth spending on the moving parts.
3. Glazing bars, glazing build and sightlines
Decide whether the bars are true divided lights or a decorative grid applied to a single glazed unit, then set the bar spacing and the number of courses across the arch. Where the doors face strong sun or a busy street, the glazing build follows from that rather than from aesthetics alone. Confirm glass type, thickness and any safety requirement with us at specification stage, since the leaf construction depends on it.
4. Frame, finish and how the door meets the wall
Name the frame material and the finish — painted, stained, veneered or lacquered — and give the reference you are working to. Then decide the architrave or casing detail, and whether the frame is flush with the plasterboard line or set into a reveal. This is where doors usually disappoint: the door itself is fine, but it meets the wall in a way nobody drew.
5. Ironmongery, thresholds and clearances
Handle type, lockcase or latch, hinges, keeps, and the threshold detail at the external opening all need to be on the same drawing as the frame. A slim-frame detail cannot carry just any hinge; a specified handle can require a leaf thickness that has to be decided before the frame is machined.
Specification sheet: what we need in writing
| Field | What to record | Why it matters at production |
|---|---|---|
| Opening width / height | Structural opening, measured on site, plus finished floor level | Sets frame size and the sill level; a drawing-only dimension risks a door that will not seat |
| Arch springing height and radius | Height from finished floor to where the curve starts, plus the curve form | Determines head geometry, bar layout and whether the leaves meet symmetrically |
| Leaf arrangement | Working / fixed leaf, swing direction, active leaf | Determines hardware positions and meeting-stile detail |
| Bar pattern | Courses across the arch, spacing, true divided or applied grid | Fixes glazing manufacture and the visual proportion of the head |
| Glazing | Type, thickness, safety requirement, solar or acoustic need | Drives leaf thickness and weight, which drives hinge selection |
| Frame material and finish | Material, finish reference, sheen level | Coating is applied late; changing it after that stage means rework |
| Wall interface | Flush or reveal, architrave profile, lining detail | Coordinates the door with integrated door and paneling work on the same wall |
| Ironmongery schedule | Handles, lock body, hinges, keeps, closers if any | Machining is cut to the specific items named |
| Quantity and set-out | Number of sets, room-by-room schedule, opening numbers | Keeps site delivery and installation sequence legible to the trades on the job |
| Site constraints | Access route, lift size, storage, installation window | Affects packaging, container loading and delivery method |
Specifying the doors as part of the joinery package
On most villa projects the arch is not a single element. It repeats in wardrobes, niches and wall panelling, and the whole point of repeating it is that the curves read as one language across the rooms. Specifying the doors separately from the joinery is how that gets lost: slightly different radii, slightly different paint references, slightly different reveal depths.
Where an arched head sits next to full-height storage or a paneled wall, send us both together and we set out the interfaces — where the door lining stops, where the panel starts, which trades are responsible for each edge. The same applies if you want the arch repeated in arched paneled wardrobes or a lit niche: one drawing set, one finish schedule, one point of coordination.
Related door types in the same collection
Not every opening wants an arch. Where the language of French doors is wanted without the curve, Santerson Modern Slim Frame French Doors carries a narrow sightline with made-to-measure sizing. For openings that need to disappear when shut, concealed and flush door details can be specified to sit level with the surrounding paneling.
Each of these is configured the same way: dimensions taken from site, material and finish selected per project, layout tailored to the space. The specification blocks above apply across all of them, which makes it straightforward to schedule several door types in one package without producing three separate conversations.
How the specification moves into production
Once the fields are complete, the sequence follows the workflow we run on every project: a brief and design proposal, then quotation and detail confirmation, then production, shipment and follow-up. Drawings come back to you for approval before anything is cut, which is the point at which outstanding questions should be answered.
Because these doors are usually part of a wider fit-out — turnkey project furnishing covering joinery, wall finishes, flooring and lighting as well as the openings — the door drawings are checked against the rest of the package rather than in isolation. Freight, packaging and delivery to site are arranged after the approval stage, with the set-out schedule driving which sets go in which container.
Common specification gaps we see
- A single overall dimension with no springing height. The arch form cannot be established from width and height alone.
- Finish named by description rather than reference. "Matt white" means different things to a paint supplier, a joiner and a coating line.
- Ironmongery left for later. Handle bore and hinge machining are cut once; late changes mean a new leaf.
- Finished floor level not stated. The door is built to the wrong height and trimmed on site, which compromises the meeting stile.
- No wall interface detail. The door arrives correct and still does not look right, because nobody decided how it meets the plasterboard or panel line.
Pre-issue checklist
- Opening dimensions measured on site, with finished floor level noted
- Arch springing height and curve form recorded for each set
- Working and fixed leaves marked, swing directions agreed
- Glazing bar layout drawn on the elevation, not described in text
- Glass type and any safety requirement confirmed
- Frame material and finish reference stated for every set
- Architrave or reveal detail drawn where the door meets the wall
- Ironmongery schedule attached with named items
- Opening numbers on drawings match the site schedule
- Access route and installation window noted for delivery planning
Questions we answer at specification stage
Can the arch radius be matched to an existing opening on a renovation?
Yes, where the opening can be measured. Survey the springing height and curve, send us a template or a set of points along the arc, and the head is built to that form rather than to a standard radius.
Can one drawing set cover both the doors and the wardrobes?
It should, wherever they share a wall or a design language. Send the joinery intent with the door schedule and we coordinate the interfaces on one approval drawing.
When does glazing need to be decided?
Before the leaf construction is fixed, because glass thickness and weight determine leaf build and hinge loading. Deciding it after approval usually means re-cutting the stiles.
What if the arch appears in several rooms at different sizes?
Specify one proportion rule — springing height as a fraction of opening width, for example — and we scale each set to it. That keeps the language consistent without forcing every opening to the same size.
Send us the schedule, and we will return drawings showing what each field produces: the head geometry, the bar layout, the frame detail against your wall build-up. Confirm those, and production starts from a specification rather than an interpretation. For doors specified alongside the wider interior package, contact our team with your opening schedule and drawings.