A pocket door saves the swing radius a hinged door takes for granted, and a glass pocket door adds another set of decisions on top of that: what the frame is made of, how transparent the leaf should be, and how the wall cavity will carry the leaf once it disappears. Because our glass pocket doors are made to measure for each opening rather than picked from a stock size list, the quality of your first enquiry decides how quickly an accurate quotation comes back. The checklist below is the information our project team works through on a villa or apartment package, and it applies whether you are specifying one opening or a door schedule across several units.
1. The opening, not just the door size
Send the structural opening first: width and height of the rough opening, plus the finished floor level and the wall build-up you plan to construct around it. A pocket door needs a cavity to receive the leaf, so wall thickness and stud layout matter as much as the opening itself. Note any constraint that cuts into that cavity — a structural beam, a services run, a switch or socket back box, or an adjacent window reveal.
Two details are commonly missing from early enquiries and both change the answer: the clear opening width you actually need to pass furniture or a wheelchair through, and whether two leaves meet in the middle for a wider aperture. Tell us which one you are optimising for — visual proportion or usable clear width — and we will work back from it.
2. Glass type, transparency and safety expectations
Glass is the specification that most affects both appearance and price, so be specific about how much privacy the room needs. Clear glass keeps a corridor or study connected to the space behind it; frosted and ribbed glass diffuse light while screening the view; smoked glass reads darker and reduces glare. If you have a preferred look from our interior ranges, name it — frosted glass and smoked glass finishes are specified across our wardrobe and interior product lines, so matching a finish between a pocket door and the joinery beside it is a normal request rather than a special one.
Also state where the door is going. A leaf next to a bathroom, a poolside terrace access, or a children's room raises different expectations for glass make-up and edge detailing than a study door does. We do not guess these; we ask, and then confirm the selected make-up on the drawing before production.
3. Frame material and finish
Frame colour and texture should be decided against the surrounding surfaces, not in isolation. Send the finish you are working to — aluminium frame, wood veneer, lacquer or laminate — along with the sample reference or a photograph of the adjacent cabinetry, skirting and flooring. Where a pocket door sits in a wall lined with wood veneer panels, we usually align frame species and grain direction with that lining so the closed door reads as part of the wall.
Handle and hardware preference belongs here too: integrated handle, recessed pull, or a handleless detail. If you have already specified sliding doors elsewhere in the project — for example flush sliding doors — send that reference so the ironmongery and reveal detail stay consistent across openings.
4. Hardware duty, frequency of use and access
A door used twice a day in a guest suite and a door used constantly by staff or guests in a hotel room are not the same specification. Tell us the traffic level and who operates the door, since that drives the running gear specified for the opening. Also flag how the pocket will be serviced later: whether an access panel is acceptable in the wall above the opening, and who will be responsible for the wall closure after the frame is set.
For hospitality work, mention any requirement to match an existing door schedule or room-type standard. Where a project repeats one detail across many rooms, we quote against the room type rather than individual openings, which keeps both the price and the specification consistent.
5. Drawings, schedules and quantities
A door schedule or a marked-up plan is the fastest route to a firm number. If you have one, send it as-is — even a sketch with dimensions written on it works. For multi-unit work, give us the quantity per room type and where those units fall, so we can price the repetition properly instead of quoting every opening separately.
If there is no drawing yet, say so. Our interior design services cover space planning and product specification, and we can work from photographs and site measurements while the documentation catches up.
6. Programme, delivery address and installation responsibility
Give the date doors must be on site and, just as usefully, when the wall openings will actually be ready to receive them. Sliding and pocket doors are fitted into a wall build-up, so they sit at a different point in the programme than joinery or loose furniture. Our scope runs from manufacturing through logistics and door-to-door delivery, with installation and after-sales support arranged separately for each project.
Confirm the delivery address, whether the site accepts container or palletised deliveries, and who is fixing the frame and closing the wall. If your own trades are installing, tell us so we include the fitting detail with the shipment rather than leaving it to be requested later.
7. Budget range and what you want optimised
An indicative budget lets us propose a specification that lands inside it instead of quoting one option and hoping. More useful still, say what you are willing to trade: if the glass is the feature worth paying for, we can simplify the frame detail; if the priority is consistency across many openings, we will standardise the leaf size and hardware and concentrate the spend on finish.
A short version of the enquiry
If you send six things — structural opening dimensions with wall build-up, glass type and privacy requirement, frame material and finish reference, traffic level and access expectations, drawings or quantities, and programme plus delivery address — we can usually come back with a specification and price that stands up. Anything missing is not a problem, it just becomes a question in the first reply rather than a number.
SANTERSON has manufactured furniture and building materials for residential, villa and hospitality projects since 2008, supplying doors, joinery, cabinetry and finishes as part of one package. Send your opening details to our project team and we will confirm the specification before production begins.