A flush wall aligned door is one of the smallest details in a joinery package and one of the easiest to get wrong. The leaf is meant to sit level with the finished wall face, with a consistent shadow gap on all four sides and no visible frame. Once the wall is closed up, mistakes are expensive to fix. That is why buyers who order these doors from an overseas factory need a specification process that starts before the first drawing is issued.
What "Flush Wall Aligned" Actually Means on a Drawing
In our Flush / Concealed Doors range, including our Flush Wall Aligned Doors, the product is made to measure for each opening rather than supplied in fixed sizes. The same collection also covers concealed and handleless variants, so the terminology matters when you are comparing quotations from different factories.
Before you send an enquiry, be clear about three things:
- Which wall finish the door must sit proud of or recessed behind. Plasterboard with a skim coat, stone cladding, timber panelling and tile all build up to different finished faces. The factory needs the final floor-to-ceiling build-up, not the structural dimension.
- Whether the leaf swings, slides or folds. A concealed hinged leaf and a pocket or sliding leaf need completely different wall cavities and hardware pockets.
- How the door is to be operated. Handleless designs rely on a routed edge, push mechanism or finger pull; a visible handle changes both the leaf edge detail and the clearance to adjacent surfaces.
A supplier working from an incomplete dimension will quote something that fits the opening but not the finished wall. Confirm the opening size, wall build-up, swing direction and hardware selection in writing before production starts.
Why Buyers Order These Doors Overseas
Concealed and flush doors are joinery, not commodity hardware. They are cut to the project, finished to a selected surface, and usually repeated across many identical openings. That combination suits factory production, which is why many architects and builders place the whole door package with one manufacturer instead of buying doors from several local distributors.
Ordering direct also lets you match the doors to other timber work in the same building. When the door leaves, wall panelling and cabinetry come from one factory, the veneer, lacquer and grain direction can be matched across the package. Buying those items separately is where colour and texture mismatches usually appear.
Our Custom & OEM service covers bespoke finishes and textures, prototyping, and flexible order quantities, so a project can specify one surface across doors, panelling and built-in units rather than accepting what a catalogue offers.
The Specification Checklist Before You Request a Quotation
The following information is what a factory needs to price the job properly. Send it in one enquiry and you will get comparable numbers; send it piecemeal and you will get three different answers.
| Item | What to provide |
|---|---|
| Opening schedule | Width, height and thickness for every opening, with the finished wall face noted for each location. |
| Leaf construction | Core type and any acoustic, fire-rated or moisture requirement. State the standard you are designing to; do not assume the factory will volunteer it. |
| Surface finish | Veneer species and cut, paint colour with a reference system, lacquer sheen, or laminate code. Attach a physical sample if you have one. |
| Hardware | Hinges, pivot, concealed closer, handleless detail or finger pull, plus the load class for the leaf size. |
| Frame and architrave | Whether a concealed frame is included, and how the door meets adjacent panelling or skirting. |
| Quantities by type | How many of each design, so repeat units are batched in one production run. |
| Delivery terms | Destination port or site, packaging standard, and whether the doors arrive with hardware pre-fitted. |
Ask for a single sample leaf before committing to the full package. It is the fastest way to check finish, weight, edge detail and how the shadow gap reads against your actual wall surface.
Coordinating Doors with Wall Panelling
The best result comes when the door and the surrounding wall are designed together. Our Integrated Door & Paneling work is specified this way: the leaf carries the same panel layout, reveal and finish as the panelling beside it, so the opening disappears into the wall. Where a decorative pattern continues across the door, the factory needs the pattern repeat and the exact cut line, otherwise the design breaks at the opening.
If your scheme calls for a door that reads as part of the wall surface rather than as a separate element, our Decorative Concealed Doors and Handleless Concealed Doors are the two variants most often specified together with panelled walls.
What to Verify Before the Doors Ship
- Dimension sign-off. Ask for a production drawing per door type, checked against your opening schedule by your own site team, not only by the factory.
- Finish approval. Photograph the finished leaves under neutral light before packing and compare with your approved sample.
- Hardware pre-fitting. Confirm whether hinge pockets and closer housings are cut at the factory or left for site. Factory-cut is more accurate but raises the risk of transit damage.
- Packaging. Flush leaves with a finished face on both sides need edge protection and flat packing, not upright racking. State this in the purchase order.
- Labelling by room. Every leaf should carry its schedule number and location so the installer is not matching sizes on site.
- Spare allowance. Order a small over-run of the most-used type. Replacement lead times from an overseas factory are longer than a trip to a local yard.
Our logistics service covers freight forwarding by sea, air and rail, export paperwork, container loading plans and door-to-door delivery, which keeps the doors moving on the same schedule as the rest of the fit-out package rather than arriving as an isolated, urgent shipment.
Working with a Supplier Who Handles the Whole Fit-Out
Doors are rarely the only timber item on a villa or hospitality project. Kitchen cabinetry, wardrobes, vanities, media walls and panelling all draw from the same finishes schedule. When one factory handles them together, you reconcile one set of drawings and one delivery programme instead of chasing several vendors whose colour samples were made to different batches.
We work as a furniture and building materials supplier covering design coordination, manufacturing, quality control, logistics and site support under one contract. Our turnkey workflow runs through consultation, design and planning, production, logistics, installation and after-sales, so the door package is scheduled against the joinery it has to match rather than ordered separately and late.
SANTERSON has manufactured furniture and building materials since 2008, supplying villa, hotel and office projects worldwide with custom production and door-to-door delivery.