A framed glass wardrobe reads as a simple item on a bill of quantities: a set of doors, an aluminium surround and some internal fit-out. In practice it is one of the more coordination-sensitive items in a bedroom package, because the frame profile, the glazing and the internal layout all have to agree with dimensions taken on site months before anything is manufactured. If you are specifying these wardrobes for apartments, villas or hotel rooms, the questions below are the ones worth settling with your supplier before an order is placed. The product itself is made to measure, so most of what follows turns on documentation rather than on the material choice alone.
Start with how the wardrobe sits in the room
Framed glass doors only look right when the frame relates properly to the surrounding wall, ceiling and floor finishes. Ask your supplier how the unit is intended to meet those surfaces: whether scribing or filler panels are included where walls are out of plumb, whether the carcass is designed to be flush with the finished wall line, and how skirting, architraves and any cornice are handled. A quotation that prices only the wardrobe body, without the interface details, tends to produce extras later.
It is also worth confirming who supplies the site dimensions and who verifies them. On multi-unit projects, floor-to-ceiling heights can vary between rooms on the same level, and a made-to-measure item ordered off a drawing rather than a verified site survey is where problems usually begin.
Ask what the frame and glazing actually consist of
The visible character of this product comes from the frame profile and the glass, so both need to be specified in writing rather than described by a photograph. Our Aluminum Frame Glass Wardrobes sit within the glass door wardrobe range and are made to measure, with material, finish and layout specified per project. Useful questions to put to any supplier include:
- Which frame finish is being quoted, and can you send a physical sample of that finish rather than a screen image? Our range includes Clear Glass Aluminum Frame Wardrobes, Frosted Glass Aluminum Frame Wardrobes, Smoked Glass Aluminum Frame Wardrobes and Bronze Glass Aluminum Frame Wardrobes, each reading differently under bedroom lighting.
- How wide is the visible face of the profile, and does the frame sit proud of or flush with the carcass?
- Is the glazing fixed or hinged, and how are handles, pulls or integrated openings detailed on a framed door?
- If full transparency is not wanted in a bedroom, what alternative does the same supplier offer, for example a Glass Sliding Door Wardrobe that avoids the swing clearance a hinged door needs?
Specify the interior, not just the front
The internal layout determines whether the wardrobe works for the people using it. Confirm hanging zones, drawer blocks, shelf depths and any lighting before production, since these are cheap to change on a drawing and expensive to change afterwards. If part of the same project needs a closed, handleless look instead of glass, that can be specified separately. See our Custom Minimalist Bedroom Wardrobe for sizes, internal layouts, door styles and surface finishes chosen per project.
Ask the supplier to show a dimensioned elevation of each unit with the internal arrangement marked, and to state which items are included in the price and which are options.
Settle the commercial and delivery questions early
For an order crossing international borders, the following should be settled before you commit:
| Question to ask | Why it matters |
|---|---|
| What exactly is included in the quoted price: hardware, glazing, scribing panels, spare parts? | Prevents add-ons after production has started. |
| How are approved drawings and finish samples recorded before manufacture? | Gives you a written reference if the delivered item differs from expectation. |
| Who prepares shipping documents, and what incoterm applies to your site? | Determines who carries freight, customs clearance and inland delivery. We handle freight forwarding by sea, air and rail with the associated paperwork and door-to-door delivery; terms should be confirmed for each project. |
| How are glazed doors packed and protected for transport? | Glass and framed panels are the items most often damaged in transit. |
| What happens if a unit arrives damaged or a dimension is wrong? | Replacement of a made-to-measure item takes time, so agree the process in writing rather than relying on an assurance. Our installation and after-sales support covers on-site installation, inspection and snags, spare parts and ongoing maintenance. |
A short pre-order checklist
A supplier who can answer these questions with documents rather than assurances is usually a supplier whose wardrobes arrive as intended. If you are putting together a bedroom package that combines framed glass wardrobes with cabinetry, doors and other built-in joinery, coordinating those items through one custom and OEM service reduces the number of interfaces you have to manage yourself. Send us your drawings and target rooms, and we will quote the wardrobe specification against them.
SANTERSON has manufactured furniture and building materials for villa, hospitality and office projects since 2008, with production, custom/OEM work and door-to-door delivery managed as one package. Contact PHILLIP on +86-13928214007 or through our contact page to discuss a wardrobe enquiry.