Partition sliding systems look simple on a drawing and are anything but simple once they reach site. Panel widths, track layout, opening direction, finish and hardware all have to agree before the first panel is cut. If your brief only says “sliding partition, as per elevation”, you will get a quotation that cannot be compared with anyone else's. This guide sets out what to put in a procurement brief for Santerson Partition Sliding Systems so the quotation, the drawings and the installation all describe the same product.

What the product actually is

Partition sliding systems sit in the Sliding Panel Systems range. They are made-to-measure wall systems for residential projects, where finish, layout and dimensions are specified per space rather than chosen from a fixed catalogue size. That single point drives everything below: there is no standard width to fall back on, so the brief has to carry the measurements, and there is no standard finish, so the brief has to name the surface.

The same configurable logic applies across the wider range — Santerson Acoustic Sliding Panels where separation and sound behaviour matter, and Santerson Glass Sliding Panels where light and sightlines are the priority. Naming the right family in your brief is the first decision; specifying it properly is the second.

The six items a complete brief must carry

1. Opening dimensions, not room dimensions. Give clear opening width and height at finished floor and finished wall level, and state which finishes are already fixed. Made-to-measure sizing is calculated from the opening, so an approximate number here becomes a site problem later.

2. Panel count, layout and stacking. Say how many panels you expect, which direction they stack, and where they park when open. If you have no preference, ask for two layout options and compare them on usable wall space rather than on price alone.

3. Track, hardware and operating detail. Confirm the track type, the hardware set and the opening dimensions with the manufacturer for each project. Hardware is what determines how a system feels after year three, and it is the item most often left out of early enquiries.

4. Material and finish. Name the substrate and the surface — matte, gloss, veneer, lacquer, textured — and give a reference or sample number where you have one. Where a project already uses other joinery, send the finish reference so panels can be matched to what is being installed elsewhere on the job.

5. Performance requirements. If separation, acoustic behaviour or fire performance matters for a space, state it as a requirement in the brief and ask what the selected configuration delivers. Performance depends on the build-up specified, so get that answer in writing for the exact configuration you are buying instead of relying on a generic figure.

6. Scope of supply and delivery. State whether you need supply only, or supply with site coordination and installation support, and give the delivery location and access conditions. For projects outside China, door-to-door logistics is part of the service scope, but import terms, duties and transit arrangements should be agreed per project rather than assumed.

How to structure the request for quotation

Send one package containing a dimensioned plan and elevation for each opening, the panel layout you want quoted, the finish reference, and the performance requirements for that space. Ask for the quotation to be broken out by opening rather than as one lump sum. That single change makes alternatives comparable and lets you phase an order if the programme moves.

Ask for a confirmed drawing back before production is released. A made-to-measure system should come with shop drawings showing panel widths, track position and clear openings; check those against your own elevations and sign them off in writing. Every day spent on that drawing saves a week of rework once the panels arrive.

Where the supplier's wider capability helps

Sliding partitions rarely stand alone. In villa and hospitality projects they usually sit alongside cabinetry, wall panelling, doors and media walls that have to match in finish and reveal. Specifying them together with Wall Panel Systems and the rest of the built-in joinery avoids the situation where three different factories each interpret the same timber tone slightly differently.

SANTERSON has operated as a China-based furniture and building materials manufacturer since 2008, with custom and OEM service covering bespoke finishes and made-to-measure production. For projects that need partitions to match existing joinery, that combination of manufacturing and turnkey project delivery — design coordination, production, logistics and installation support under one scope — is where the practical saving usually appears.

Common specification mistakes to avoid

  • Quoting from a rendering. Visuals establish intent; they do not establish panel widths or hardware.
  • Leaving acoustic requirements vague, then finding after installation that the wrong build-up was ordered.
  • Ordering tracks and panels from separate sources to save money, then discovering the clear opening heights do not agree.
  • Signing off shop drawings late, after the site openings have already been set out on the assumption of different dimensions.

A short pre-order checklist

  • Finished opening width and height for every location
  • Panel count, stacking direction and parking position
  • Track type and hardware set confirmed for the project
  • Material and finish reference, matched to adjacent joinery
  • Performance requirements stated and answered in writing
  • Delivery location, access conditions and installation scope agreed
  • Shop drawings approved before production release

A brief that answers these seven points turns a configurable product into a quotable one. Send your dimensions and finish references with the enquiry, and ask for shop drawings before production — that is the shortest route to a partition system that fits on the first visit.