A stacked laundry unit looks simple on a drawing: two appliances, one column of cabinetry, a door that closes the whole thing away. On site it is a different story. Services have to meet in the right place, the stack has to be reachable, and the enclosure has to survive a damp room. Before you compare quotations, here is what project buyers and contractors should actually put side by side.

1. Footprint first, then the elevation

Start with the plan area and the finished height of the niche, not with the appliance brochure. A stack only works if the vertical line of the two machines clears the ceiling finish, the skirting, and any door swing in front of it. Then check access: what width does the unit need to be carried through, and can it be assembled in place if a corridor is narrower than the panel?

Our Stacked Laundry Units are made to measure, so the enclosure is drawn around the room and the appliances rather than the other way round. That matters most in apartments and villas where the laundry shares a wall with a bathroom or kitchen and nothing can be moved.

2. How ventilation and access are solved

Enclosed stacks trap heat from the dryer and make servicing awkward if the cabinet is fixed shut. Compare how each supplier handles airflow to the machine rear, whether panels are removable for hose and belt work, and whether controls stay readable with the doors open at a normal angle. Ask for the access arrangement in writing; it is usually the difference between a tidy installation and a call-back.

3. Materials that hold up in a wet room

  • Board and panel choice for the lower cabinet, where mopping and spills reach the plinth.
  • Edge sealing on all four sides of panels used near the shower or basin zone.
  • Hardware finish rated for humid rooms, including hinges, runners and handles.
  • Worktop or folding lid material if the unit doubles as a folding and sorting surface.

Finish and material are specified per project on our side. If you are matching an existing fit-out, send the door profile, colour reference and hardware schedule with your enquiry so the laundry column reads as part of the same joinery package instead of a purchased add-on.

4. Storage around the stack, not just under it

Two machines use up the floor area; the rest of the household workload has to live above or beside them. Compare what each quotation includes for detergents, linen, ironing and the items nobody wants visible in a hallway.

Element What to specify on the drawing Common gap at handover
Tall cabinet beside the stack Shelf heights for bulk stock, plus a clear zone for hanging items Adjustable shelving omitted, so tall bottles waste half the height
Pull-out hamper bay Basket count, load rating and full-extension runners Fixed baskets that cannot be carried to the machine
Folding surface Depth, load and whether it folds or slides away No clear work surface, so folding happens on the bed
Service access Detachable panels and marked service clearance Sealed enclosure, requiring panel removal for a hose change

Where the room is too tight for a full column of storage, our Multi Function Tall Cabinets carry the household store in the same depth as the stack. For bathroom-side arrangements, the Laundry & Storage Combo and Compact Laundry Solutions in the same Laundry Integration collection let you trade cabinet width against circulation space without changing the joinery language.

5. What a comparable quotation should state

Suppliers often quote at very different levels of completeness, which makes price comparison misleading. Before you compare numbers, confirm that each offer states finished external dimensions and tolerances; the material and edge treatment for every panel; hardware brand and finish; what is excluded (appliances, plumbing, electrical, tiling); packing method and crate size per unit; and who signs off the setting-out drawing before production starts.

Order of operations that saves rework: confirm appliance model and service clearances, then issue the setting-out for water, waste and power, then release the cabinet order. Reversing those steps is what forces on-site trimming.

6. Consistency across the whole project

For a villa or apartment package, the laundry column is one item in a larger joinery order that also covers wardrobes, kitchen cabinetry and bathroom storage. Buying these from one manufacturer keeps door profiles, colours and hardware consistent, and puts a single party responsible for the measurement schedule and the delivery sequence.

As a one-stop furniture and building materials supplier, we handle that coordination: production of the cabinetry alongside other fixtures, packing and container loading for mixed shipments, and site guidance at installation. Where a developer has its own appliance supply, we build to the models you nominate; where a design practice wants bespoke proportions or finishes, our Custom Furniture Design and Prototyping service covers prototyping, material and finish selection, and branding for repeat types.

Before you place the order

  • Send the room elevation with finished floor and ceiling levels, not just a plan.
  • Nominate the appliance models and their service clearances in writing.
  • Agree which trade supplies water, waste, power and ventilation.
  • Request one sign-off drawing per unit type before production is released.

If you are pricing stacked laundry units for an apartment, villa or bathroom fit-out, send us the room elevation and appliance choice and we will return made-to-measure layouts, finish options and a quotation scoped to your package.