A hanging modular wardrobe looks simple on a drawing: carcasses fixed to the wall, rails at the right heights, drawers where you need them. In practice it is one of the easiest built-in items to get wrong, because nearly every dimension depends on the wall behind it and on how the modules will be supported. If your enquiry says only "hanging wardrobe, 3 metres wide", the factory can only guess. This guide sets out what a usable specification actually contains, so the quotation you receive matches what arrives on site.

What "hanging" changes in a modular wardrobe

Our Hanging Modular Wardrobes are wall-supported modules rather than cases standing on a floor-mounted frame or plinth. That single decision affects almost everything downstream:

  • Load path. Clothes, rails and drawers hang on the wall fixing, not on the carcass base. The substrate and the fixing method have to be stated in the enquiry, because they determine what the module frame can carry.
  • Floor clearance. With no plinth taking the load, the gap between the finished floor and the lowest module is a design choice you specify, not something the factory assumes.
  • Setting-out sequence. Wall finishes, skirting removal, electrical outlets and door openings need to be resolved before the modules are made. A specification that ignores these produces a wardrobe that fits on paper and clashes on site.

If the wall construction is not suitable for direct fixing, say so in the enquiry. We will tell you whether the layout should change or whether supporting carcasses are the better route, rather than quoting something that cannot be installed as drawn.

The six items every hanging wardrobe specification needs

ItemWhat to stateWhy it matters
Wall and substrateWall type, whether finishes are complete, position of outlets, switches and skirtingDetermines fixing method, allowable module depth and whether the layout must be adjusted
Overall envelopeWidth, height and depth measured at finished surface level, plus ceiling and cornice conditionsMade-to-measure sizing only works with dimensions taken from the actual room
Internal zoningLong-hanging, short-hanging double rail, drawer bank, shelf stack, open display sectionRail heights and shelf spacing follow what you store, not a generic template
Door and front styleHinged, sliding, open, glass, mirror or handleless panel — and the clearance each needsBed movement, adjacent doors and bedside furniture decide which fronts can actually open
Material and finishBoard type, surface finish, colour reference, hardware brand or grade where requiredFinish names vary between suppliers; a written reference removes the guesswork
Scope of supplySupply only, or supply with installation, and which trades prepare the wallPrevents an installed wardrobe being quoted as a flat-pack delivery

Zoning: describe the storage, not just the furniture

The fastest way to a specification that works is to list what goes into the wardrobe before you describe how it looks. For a bedroom serving two people, a typical brief splits into four zones:

  • Full-length hanging for coats, dresses and tailoring — rail height set by the longest garment, with clearance above for the shelf stack.
  • Double short rails for shirts and folded jackets, one above the other, which usually carries more clothing in a given width than a single long rail.
  • Drawer banks for underwear, knitwear and small items. Drawer count and depth are worth specifying item by item; if drawers dominate the layout, our Drawer Focused Modular Wardrobes show how that configuration is arranged.
  • Open and display sections for bags, accessories or frequently used pieces. If you want these visible rather than behind doors, the Open Modular Wardrobes range is the reference point.

Where a project mixes zones across several rooms or unit types, Combination Modular Wardrobes let you specify one consistent carcass system with different internal layouts per room — useful for apartment blocks and villa portfolios where finishes repeat but storage needs differ.

Materials, finishes and hardware: how to write them down

Write finishes as a reference your supplier can match, not as a mood. A usable line reads "matte light-toned panel front, handleless, matching sample reference", followed by the board type for carcass interiors. Then record:

  • Carcass and shelf material, with edge treatment on visible edges.
  • Front material and finish, including grain direction where a wood-look surface is used.
  • Hinges, slides and rail hardware — brand or grade if the project has a maintenance standard to meet.
  • Integrated lighting, if required, with the driver location stated so it stays accessible after installation.

Our modular wardrobe collection is offered with made-to-measure sizing, material and finish options, and a layout tailored to each project. That flexibility only pays off when the specification is explicit: an undefined finish becomes an assumption, and assumptions become variations.

How our custom process turns a specification into production

For wardrobe work we follow the same sequence as our wider Custom & OEM Service:

  • Brief and drawings. Room dimensions at finished level, wall construction, and the zoning list above.
  • Layout confirmation. Module widths, rail heights, drawer positions and front style are fixed before pricing is finalised.
  • Material sign-off. Board, finish and hardware references confirmed in writing, so production has one source of truth.
  • Packing and delivery. Modules packed for the site sequence they will be installed in; our Logistics & Door-to-Door Delivery service covers freight and paperwork to the project address, with delivery terms confirmed per order.
  • Installation and inspection. Where installation is in scope, wall preparation and setting-out are agreed before the modules arrive, and snags are recorded at handover under our Installation & After-sales Support arrangements.

Common specification mistakes and how to avoid them

  • Measuring before the finishes are done. Take dimensions at finished floor and wall level, otherwise depth and clearance figures are wrong by the thickness of plasterboard or tiling.
  • Ignoring the wall. A hanging system specified without substrate information cannot be quoted safely. State wall type and any reinforcement you plan to add.
  • Specifying fronts before checking door swings. Sliding fronts need overlap clearance; hinged fronts need swing room against the bed and the opposite wall.
  • Leaving rail heights to the factory. Generic heights waste vertical space. Give the longest garment length you store.
  • One enquiry, many rooms. For multi-unit work, list each room as its own line with its own internal layout, keeping carcass and finish references common.
A practical test: if a quotation can be produced from your enquiry without the supplier asking a single follow-up question about walls, dimensions or zoning, the specification is complete. If it cannot, find out which of the six items above is missing before you compare prices.

SANTERSON is a China-based furniture and building materials manufacturer supplying built-in furniture, interior fixtures and finishes for villa, apartment and hospitality projects. Send us your room dimensions, wall construction and storage list, and we will return a hanging modular wardrobe layout with confirmed dimensions, finish references and a project quotation.