A full height media wall looks simple on a drawing: a panel from floor to ceiling, a screen in the middle, some shelving around it. It is only after installation that people discover the awkward parts — a television fixed too high for the sofa, cables trapped behind a closed panel, doors that will not open because the handle clearance was never discussed. Before you place an order for Santerson Full Height Media Walls, the questions below are the ones worth asking, and they apply to any made-to-measure wall system you buy.
1. What is the exact opening, and who measures it?
Full height systems are built to project-specific dimensions, so the numbers have to come from site, not from a plan drawing that was never checked on location. Ask for the finished floor level, the ceiling level at several points across the wall, and the position of every socket, switch, downlight and air grille that falls inside the elevation. Wall lengths and heights vary along a single run in most buildings, and a system designed to a nominal dimension will arrive with a gap you then have to scribe on site.
Send the supplier an annotated elevation rather than a single overall measurement: where the wall starts and ends, what is above it, whether skirting or architrave stays in place, and whether the floor covering is already laid or still to come.
2. Which screen size, and at what height?
Tell the manufacturer the exact television model or the screen diagonal you intend to buy, not an approximate size. The panel opening is cut around that set, and once it is made, a larger screen will not fit behind the reveal. Then agree the mounting height together with your seating layout: eye level for someone seated on the sofa, not the centre of the wall. If the screen must be hidden when not in use, say so at this stage, because Santerson Sliding Panel TV Systems and integrated panel arrangements need the track, clearance and swing allowance designed into the carcass from the beginning.
3. Where does every cable go, and how is it reached later?
List what has to be connected: the television, a soundbar or speakers, a console, a set-top box, Ethernet, and any lighting transformer. Ask for a ducted route behind the panel, with an access point that can be opened again after handover. A wall that seals every service behind a fixed finish is difficult to revisit when equipment changes, which it always does within a few years. Confirm who supplies and installs the electrical work, and confirm that sockets sit inside the zone where equipment will actually be placed.
4. How much of the wall is open display and how much is closed?
Open shelves show dust and clutter; closed cabinets hide them but cost more in hardware. Decide room by room, and decide honestly about what you will keep on show. A workable split is a few open bays for the items you actually display, with the rest behind doors. If you want both, ask for a Santerson Storage & Display Combo layout so the open and closed proportions are resolved in one drawing instead of being patched together later.
5. What is inside the cabinets?
Ask for the internal layout drawing, not just the exterior elevation: shelf spans and their load rating, adjustable versus fixed shelves, drawer units, and provisions for equipment that needs ventilation. Confirm hardware brands and soft-close fittings in writing, and confirm panel thickness for long open shelves, since a thin wide shelf will sag under books.
6. Which finish, and how is it matched to the rest of the room?
These systems are specified with project-specific finishes, so request physical samples rather than judging from a screen: veneer, lacquer, matte or high-gloss surfaces read very differently under site lighting. If the media wall continues into wardrobes, sideboards or doors, ask for one finish schedule covering all of them, so the same wood tone and sheen appear across the joinery package. For a feature wall with lighting, Santerson Backlit Feature Walls should be specified together with the light source type, its colour temperature and how it is serviced.
7. Who coordinates the wall with the other joinery in the project?
A media wall rarely stands alone. It meets flooring, ceiling, doors, lighting and sometimes a fireplace or a window reveal. If you are also ordering kitchen cabinets, wardrobes and Santerson Integrated TV Panels from the same maker, ask for one coordinated set of elevations across the package, with matching reveals, skirting returns and shadow gaps. This is where a single supplier for furniture and interior fixtures saves rework: one drawing set, one finish schedule, one production run.
8. How does it travel, and who installs it?
For an overseas order, ask how the units are packed and panelled for flat-pack shipping, what is included in the delivery quote, and where responsibility transfers to you. Then confirm who assembles and fixes the wall on site: your own trades, or the supplier's installation service. Ask what site conditions must be ready before the units arrive — paint completed, flooring laid, first-fix electrics tested — because a wall system delivered into an unfinished room sits in storage and gets damaged.
9. What happens if something is wrong or missing?
Ask before ordering how shortages, transit damage and replacement panels are handled, who pays for the replacement and the freight, and how long a response takes. Get it in writing on the order confirmation. Also ask what you should do at handover: an inspection list signed off on the day avoids disputes weeks later.
10. What does the quotation actually include?
Compare quotations line by line. A complete one names the dimensions, materials, finishes, hardware, integrated lighting, the television mounting provision, packing, freight terms and installation scope. Where a price looks low, something has been left out — usually hardware, lighting, or delivery beyond the port. Ask for the same level of detail from every supplier so you are comparing like with like.
A short checklist before you sign
- Site-verified dimensions, including floor and ceiling levels and all services on the wall.
- Confirmed screen model, mounting height and whether the screen is hidden or exposed.
- Cable routes with accessible service points; electrical scope assigned to a named party.
- Open-to-closed ratio agreed, plus internal shelf and drawer layout drawings.
- Physical finish samples approved, with one finish schedule across the joinery package.
- Packing, freight terms, installation responsibility and after-sales terms in writing.
SANTERSON is a China-based furniture and building materials manufacturer working on villa, hospitality and office projects, with custom and OEM production, door-to-door logistics and installation support. If you are specifying a media wall as part of a wider fit-out, send the room drawings and your equipment list to our team and we will return elevations and a specification you can check against the questions above.