Flush interior doors look simple on a drawing. The leaf sits level with the wall, the architrave disappears, and the opening reads as part of the surface rather than an object inserted into it. That clean result is exactly why they go wrong so easily: the detailing that carries the look has to be decided before manufacture, not adjusted on site. If you are specifying Santerson Flush Interior Doors for an Australian villa, apartment or hospitality fit-out, the following checks are worth settling in writing before a purchase order is raised.

Start with the opening, not the door

Flush and concealed doors depend on wall build-up as much as on the leaf itself. The finished floor level, the thickness of the plasterboard or lining, the framing depth and the position of services all change what the frame needs to be. So before you ask for a door schedule, confirm the wall construction you are actually building to — not the one drawn at concept stage.

Santerson's interior door pages describe made-to-measure sizing, material and finish options, with layout tailored to each project. That flexibility is useful, but it also means the responsibility for accurate dimensions sits with the buyer. Take sizes from site or from coordinated finished drawings, and state clearly which they are.

Confirm what "flush" means in your specification

The word covers several different details, and they are not interchangeable on site:

  • A leaf aligned with one face of the wall, with a concealed frame and no visible architrave on that side.
  • A leaf aligned with both faces, requiring a double-sided concealed frame.
  • A door finished to match adjacent panelling so it reads as a continuation of the wall surface.

Related options in the same family include Santerson Flush Hinged Doors, Santerson Flush Sliding Doors and Flush Wall Aligned Doors. Each needs different frame, track and clearance provisions. Decide the operating type first, because it affects framing, skirting returns and where furniture can sit.

Match the door to the surrounding surface

A flush door only works if the finish continues across it without a visible break. Where the wall is panelled, veneered or lacquered, ask whether the leaf can be supplied in the same material and colour as the adjoining wood veneer panels or matte lacquer panels, and request a physical finish sample rather than relying on a rendered image. Grain direction, sheen level and undertone are the usual sources of mismatch once the job is lit.

Where the intent is a hidden storage or plant door rather than a person door, that is a different product family — decorative concealed doors and handleless concealed doors. Confirm which one your drawings are calling for.

Get the hardware and clearances in writing

The visible part of a flush door is only the leaf. The parts that decide whether it works are usually listed separately, so ask for them explicitly:

  • Concealed hinge type and quantity, with the load rating for the leaf size you have specified.
  • Whether an overhead closer or floor spring is included, and how it will be accessed for maintenance.
  • Handle, pull plate or recessed latch details — including whether the opening is to remain handle-free.
  • Seals, acoustic or smoke requirements if the door is part of a compartment line.
  • Threshold and floor covering build-up, so the undercut matches the finished floor rather than the slab.

Product pages for these doors give a configurable overview rather than a fixed technical sheet. Treat that as a prompt: request the specification for your exact opening and have it countersigned before production starts.

Order the whole wall package from one supplier where you can

Splitting doors, panelling, joinery and finishes across several suppliers is where alignment tolerances get argued about later. Santerson covers furniture and building materials together — cabinetry, wall panel systems, flooring, lighting and sanitaryware alongside the door range — which makes it practical to have one party accountable for the interfaces. Their service pages describe design coordination, custom and OEM work, production, logistics and site support as a single scope.

Ask how drawings are coordinated, who signs off the final dimensional set, and what happens if a wall build-up changes after the doors have entered production. Those answers matter more than a marginally better unit rate.

Set out delivery, storage and installation before shipping

Flush leaves are large, flat and easily damaged in transit and on site. Before the order ships, confirm the packaging method, container loading sequence and which trade receives and stores the doors. Timber and board products need to stay acclimatised and flat in the conditions of the actual building, not stacked against a wet wall.

Australian import terms, duties, Incoterms, insurance and transit time should be agreed for the specific project rather than assumed from marketing material. Likewise, confirm who installs: supplier-supplied installers, your own joiner, or a shared arrangement with a written snag list at handover.

Check the commercial terms you will actually be held to

  • Whether the quoted price includes frame, ironmongery, finishes and delivery, or whether these are extras.
  • Minimum order quantity for a mixed door schedule, since custom sizes are priced individually.
  • What happens to a door that no longer fits a revised opening, and the cut-off date for dimensional changes.
  • Warranty scope and what voids it — particularly on-site trimming of a concealed frame.
  • Spare parts availability for hinges and closers of the same model, for future maintenance.

Company figures quoted on supplier websites can differ between pages. If factory capacity, staff numbers or export percentages matter to your procurement process, ask for current written confirmation instead of relying on a homepage figure.

Run one door through the process first

The lowest-risk way to buy flush interior doors from overseas is to place one representative opening as a test: full wall build-up, frame, leaf, finish sample and ironmongery, installed by the trade who will do the rest. That single mock-up exposes the architrave detail, the paint or veneer break line, the hinge mortise depth and the door undercut long before forty identical openings are in production.

If you want a comparison point, standard interior hinged doors from the same range can be quoted for the openings where a fully flush detail adds cost without adding value. Most Australian projects end up with a mix, and deciding that split early keeps the door schedule honest.

Before you raise the purchase order: finished wall build-up confirmed; opening sizes taken from coordinated drawings or site; operating type fixed; finish matched to a physical sample; ironmongery listed and rated for the leaf; packaging, delivery and installer named; and change deadlines written into the order. Those seven items settle almost every dispute that arises later on a flush door package.