A wardrobe that mixes glass fronts with acrylic panels looks sharp in a rendered bedroom, but it is also one of the trickier items to buy as an original equipment manufacture (OEM) order. Two materials, two suppliers' habits, and a set of tolerances that have to meet on site. If you are a developer, joiner, interior practice or furniture retailer specifying these doors for villas, serviced apartments or hotel rooms, the following walk-through covers how the process actually runs, stage by stage, and what to lock down before production starts.
What OEM Means For This Product
OEM manufacturing means the factory builds to your drawings and your brand, rather than selling you a catalogue item. With Glass & Acrylic Combination Wardrobes, that starts from a made-to-measure opening: the carcass is sized to the room, the layout follows how the resident actually uses the space, and the front is a combination of glazing and acrylic panel. Our Custom & OEM Service covers custom furniture design and prototyping, bespoke finishes and textures, OEM production, flexible minimum order quantities, and brand customisation such as engraving, embossing, logos and packaging.
Because the wardrobe sits in our Acrylic Wardrobes collection, finish choice is a specification decision rather than a fixed option. Matte acrylic reads soft and hides fingerprints; high gloss acrylic throws light back into a narrow bedroom; glass — clear, bronze, smoked or ribbed — turns the interior of the wardrobe into part of the room's decoration. The same body can carry different fronts across a project, which is exactly why OEM sourcing suits multi-unit work.
Stage 1: Brief, Drawings And 3D Modelling
Send the opening dimensions, elevation drawings if you have them, and a note on the door type — hinged, sliding or walk-in. From there we produce 3D modelling so you can see the glass-to-acrylic ratio before any board is cut. This is where most problems get solved cheaply: hanging heights, drawer stacks, shelf spacing, and whether the glass front needs an aluminium frame to stay flat over a wide span.
Stage 2: Material And Finish Confirmation
Confirm the substrate, the acrylic surface, the glazing type and the hardware at the same time. Mixed materials mean mixed lead times, so a single confirmation sheet avoids a half-finished order. If your project already specifies joinery elsewhere — kitchen cabinetry, media walls or custom minimalist bedroom wardrobes — send those details too, so the same laminate, veneer or lacquer decision carries through every built-in element.
Stage 3: Prototyping Before Volume Run
For a first OEM order we make a prototype of the door front and one carcass bay. Check it in the light conditions of the actual room, open and close the doors, look at the edge banding and the glass rebate. Approving a physical sample costs far less than correcting a full container.
Stage 4: Production And Quality Control
Once the prototype is signed off, we schedule the production run under the agreed quantity. Panels are machined to the confirmed sizes, glass is cut and edged, acrylic fronts are applied, and each unit is dry-assembled in the factory before packing. For multi-unit projects we keep one reference sample on file so later batches can be compared against it.
Stage 5: Packing, Freight And Handover
Glass and acrylic travel badly when they are packed the way flat-pack furniture is. Panels go out protected individually, framed where spans require it, with hardware bagged, labelled and matched to the crate markings. Our Logistics & Door-to-Door Delivery service handles freight forwarding by sea, air and rail, along with commercial invoices, packing lists and certificates of origin. On arrival, our team supports on-site installation, inspection and snags through Installation & After-sales Support, with spare parts and replacement handled afterwards.
Questions To Put To Any OEM Supplier
- Which dimension governs — the finished opening or the carcass size, and who re-measures on site?
- Is the glass framed, and what is the maximum unsupported width for the acrylic front you have chosen?
- What is the minimum order quantity for a mixed finish run across several unit types?
- Which drawings must be countersigned before production, and what changes after that trigger a cost?
- How are replacement doors ordered later, when one panel is damaged on site?
Getting A Quote
Send us the floor plan, the number of rooms, and a photograph of a similar detail you like. We will come back with a specification sheet showing the glass type, acrylic finish, layout and packing method for your review — no obligation to place volume production until the prototype is approved. Send your drawings to the SANTERSON team via the details on our contact page, and we will review them with you before any commitment to volume production.
Dimensions, finishes and configurations are confirmed per project; specifications shown on product pages are indicative and should be verified against your approved drawings before production.