A swim spa shell arrives on site looking finished, but the details that decide how it performs for the next ten years are usually decided in writing, before production starts. If you are specifying the Outdoor Swim Spa WS-S06CT for a villa terrace, a resort pool deck or an apartment amenity level, the following is the list of finish details we ask buyers to confirm with us — and the reason each one matters at handover.

Start from the shell: acrylic surface and cabinet exterior

The interior shell is the surface every user touches, so confirm the shell material and colour against your own finish schedule rather than against a catalogue thumbnail. On this range the shell is an acrylic interior over a reinforced structure; ask us for the actual colour sample or a photograph of the batch if a designer has specified a particular white tone, because bright whites vary between batches more than buyers expect.

The cabinet exterior is the part that reads as "joinery" from the deck. Confirm whether the outer cladding should match a nearby timber deck, aluminium screen or stone wall, and confirm which side of the unit is exposed. A spa recessed into a platform needs finished panels only where it is visible; a free-standing unit on an exposed terrace needs all four faces clad, and that changes both the price line and the delivery lead time.

Water features: jet layout, not just jet count

The specification recorded for this model lists 31 jets in total, plus a swim training system, water pump and filter pump. Two buyers reading the same number can end up with very different experiences, so confirm the jet positions on the drawing: where they sit relative to shoulder height when seated, whether any are aimed at the shallow bench, and whether the swim current lands where the swimmer actually is in a 5880 × 2380 × 1400 mm shell. Ask us to mark jet locations, the return inlet and the skimmer on the same plan your builder is working from.

Also confirm what "included" covers. Options listed for this range include control systems, UV sterilisation, water pumps, heat pumps, sand filtration, insulation and steps. A heat pump and a sand filter are not cosmetic additions — they change plant-room space, drainage and power routing — so decide them at the quotation stage instead of as site variations.

Lighting: fitting count, colour mode and control

Four LED lights are listed for this configuration. Confirm where they are recessed, whether they are single-colour or colour-changing, and whether they sit on the same control as the pumps. Recessed fittings set into a shell that will later be tiled or clad around need their position fixed early; a fitting moved after installation means draining, cutting and resealing.

Controls and the electrical boundary

One control system is listed. Confirm which functions it operates — jets, pumps, lighting, ozone — and whether your project wants a wall panel, a keypad at the deck edge or an additional control point. The catalogued total power for this model is 8.35 kW; that figure covers the spa as configured in the catalogue, so hand your electrical engineer the confirmed configuration sheet, not the brochure, and let them size the circuit, protection device and isolator locally.

Electrical work, earthing and any local wiring or building requirements are handled by your local contractor to their own code. We supply the equipment data you need for that design; we do not certify the installation on your site.

Insulation, steps and access details

Insulation is a catalogued option on this range, and it is worth specifying deliberately for villas in cooler highland areas or for any spa used outside the warm months. Confirm whether insulation wraps the base as well as the sides, since a base-only specification shows up later as running cost. Steps are also an option: confirm the step height against your finished deck level after tiling, not the slab level, and confirm which end the steps sit at so they do not block the filter or control access panel.

What to have in writing before production

  • Confirmed model and configuration sheet, including options such as heat pump, UV sterilisation, sand filtration, insulation and steps.
  • A dimensioned plan showing shell size 5880 × 2380 × 1400 mm, finished deck levels, jet positions, return inlets and the access side for service.
  • Cabinet cladding type and colour, with the exposed faces identified.
  • Control layout and which equipment each control operates.
  • The power figure your engineer is designing from — 8.35 kW as catalogued for this configuration — signed off by them.
  • Delivery terms to site and who provides crane or rigging if the unit must clear a wall or balcony.

How our process handles these confirmations

As a one-stop furniture and building materials supplier, SANTERSON works swim spas as part of a wider project package rather than as an isolated purchase. Our Custom & OEM Service covers bespoke material finishes and textures, so cabinet cladding can be matched to the joinery, screens and outdoor furniture already on your schedule. The Logistics & Door-to-Door Delivery service covers freight forwarding, packaging and container loading, with shipment tracking through to site.

If the spa sits inside a villa or hospitality fit-out, it is normally cheaper in coordination cost to buy it alongside the outdoor furniture and the poolside loungers, screens and paving finishes from the same supplier, so one drawing set governs all of it. Our Installation & After-sales Support covers on-site installation support, inspection and snag lists with your team.

Compare before you commit

If the 5880 mm shell is tight against your terrace, the longer Outdoor Swim Spa WS-S06CT-L at 6670 × 2380 × 1400 mm is the same family with temperature setting listed among its features. If you want more length for lap work, Outdoor Swim Spa WS-S08CT is catalogued at 8000 × 2400 × 1420 mm with 35 jets and six LED lights. If water features matter more than swim training, Outdoor Swim Spa WS-S06 lists a waterfall and four water columns instead. And where the space is irregular, our Customizable Shape Outdoor Spa can be built in square, round, oval or curved layouts.

Send us your plan and the finish schedule you are working to. We will return a configuration sheet with the equipment list, dimensions and power figure for that exact build, so every item above is confirmed before production starts rather than discovered at handover.