An arched French door is one of the few openings in a villa or hotel suite that carries the whole character of the room. Because it is made to your opening rather than picked off a shelf, the quality of the quotation you receive depends almost entirely on how much usable information you hand over at the first enquiry. The list below is what our project team actually needs to move from "please quote" to a confirmed specification.
1. The measured opening, not the design drawing dimension
Send structural dimensions for every opening: width and height at the sill or threshold, wall thickness, and the head condition above the arch. Where an arch is involved, note whether the curve is a segmental arc or a full semicircle, and give the radius and the height from the springing line to the crown. If the opening is still framed in the rough, tell us which floor finish level the threshold will sit at once the screed and flooring are down — this single detail changes the leaf height on every door in the set.
Photographs of the wall in its current state help more than a render. A photo shows the plaster line, the reveal depth and any services running through the wall that a drawing tends to leave out.
2. Which door in the collection you are asking about
Our Santerson Arched French Doors sit within a wider French doors collection, so it is worth naming the model or attaching the product page when you write to us. If you are still deciding between profiles, Classic French Double Doors and Santerson Modern Slim Frame French Doors are the two directions projects most often compare — a traditional paneled elevation against a narrow sightline. Telling us which one you are working from stops the first quotation coming back with the wrong mullion detail.
3. How the doors will actually be used
Before we specify anything, we need to know the daily behaviour of the opening:
- Which leaf is the active one, and whether both leaves open or one stays fixed.
- Swing direction — into the room or out to the terrace — and any furniture or curtain track that limits the arc.
- Hardware preference: handle style, lock arrangement, hinges visible or concealed, and whether restrictors or a flush floor threshold are required.
- Glazing intent: clear, low-iron, patterned or laminated, and whether the arch light is a single shaped pane or divided by glazing bars.
4. Finish and how it has to match what is already on site
Arched doors rarely stand alone; they have to read as one family with the skirting, architraves, wardrobes and cabinetry in the same build. Send the finish reference you are working to — a paint code, a veneer species, or a sample of what has already been installed. Where a project mixes suppliers, say so plainly: we will match the stain and sheen to your existing joinery rather than assume the door can set its own tone.
5. Quantities, phasing and the site you are delivering to
Give a door schedule even if it is provisional: opening reference, size, quantity, and which floor or villa each belongs to. Say which items are needed first. Villa work and multi-unit residential fit-outs rarely want the same delivery sequence, so stating the sequence early keeps a shipment from landing before the openings on site are ready to receive it.
Because these doors are made to measure, we confirm dimensions and the selected specification for each project before production starts. That confirmation step is also why an accurate first enquiry pays off: a revised opening after sign-off means re-cutting frames, not swapping a part.
A quick pre-enquiry checklist
- Measured widths, heights, wall thicknesses, arch radius and springing height for each opening.
- Floor finish levels and threshold detail.
- Model or product page reference, plus the swing and active-leaf decision.
- Hardware and glazing preferences.
- Finish reference or sample to match existing joinery.
- Door schedule with quantities, delivery address and required phasing.
Note: specifications, materials and finish options are confirmed with our project team for each order; the details above describe what to prepare, not fixed product parameters.