A swim spa sits between two very different procurement conversations. It is not a moulded product you order from a brochure, and it is not a bespoke concrete pool that needs months of structural design. It arrives as a delivered shell with pumps, jets, lighting and controls already inside a cabinet, and it still has to be lifted into place, connected to power and water, and finished off on site. That middle position is exactly where projects lose time when the enquiry is thin.

The short version: send the footprint, the access route, the electrical supply, the water and drainage arrangement, and the intended use. For Outdoor Swim Spa WS-115EⅣ-U, that means the 5280 × 2200 × 1250 mm catalogue envelope, a clear path from the truck to the pad, and confirmation of what is included in the selected configuration.

Why a swim spa enquiry needs more than a model number

WS-115EⅣ-U belongs to our configurable outdoor swim and hydrotherapy range. The catalogue entry gives you the shell size and the equipment shown on the page, but the equipment list is configuration-dependent: pumps, sterilisation, heating, filtration, insulation and steps are options that get confirmed with the quotation. A buyer who sends only "we want the 5280 model" gets a specification back; a buyer who sends site conditions and use case gets a specification plus an installation plan.

The difference matters most on villa, resort and hospitality jobs, where the spa shares its budget line with decking, landscaping, paving and the electrical contractor. As one of our swimming pool products it travels internationally, so the coordination window closes quickly once the shell is packed.

The measurements that decide whether the unit fits

Start with three numbers from the catalogue and then add four you have to measure yourself.

InputCatalogue figure for WS-115EⅣ-UWhat you confirm on site
Overall envelope5280 × 2200 × 1250 mmClear pad size with service access at the cabinet side, not just the shell outline
Total power shown9.65 kWAvailable supply, circuit protection and cable route from the switchboard
Jet total24 pcsSeating and hydrotherapy layout you actually want for the space
Pumps3 water pumps, 1 filter pumpFiltration location, noise position relative to bedrooms and neighbours
Lighting2 LED lightsAny additional lighting or water features in the design intent

The 1250 mm height is a shell height, not a finished level. If the design calls for the spa to sit flush with decking, the surrounding structure has to be set out around that number, and the access panel side must stay reachable for servicing. If the spa sits above finished level on a plinth, steps become part of the layout rather than an afterthought.

Access and lifting are measurements too

The most common avoidable problem is a unit that fits the plan but not the property. Before production starts, send us: gate width and height, side-alley clearance, overhead obstruction such as wires or pergola beams, turning space at corners, and whether a crane or a hiab lift is realistic on the day. A 5.28 m shell that has to be manhandled through a 900 mm side gate changes the design conversation completely, and it is far cheaper to discuss that during specification than after packing.

Power, water and drainage

The catalogue lists total power of 9.65 kW for this configuration, which your electrician uses to size the circuit, protection and run. Ask us to confirm voltage phase, dedicated circuit requirements and the connection point before wiring is pulled. On the wet side: where the fill supply comes from, whether a drain or pump-out route exists for drainage and backwash, and how the unit will be isolated for maintenance. Ozone is shown as a feature on this model; if you want UV sterilisation instead of or alongside it, that decision belongs in the quotation stage, not on site.

The project inputs that shape the specification

Once fit is settled, use-case drives configuration. Tell us:

  • Primary use. Daily lap swimming, hydrotherapy and massage, guest leisure at a boutique hotel, or a spa for a private villa. Jet layout, seating depth and the balance between swim space and lounge space follow from this.
  • Climate and season of use. Whether the spa runs year-round determines insulation, heat pump selection and cover requirements.
  • Occupancy pattern. A resort unit sees continuous turnover, which changes filtration duty and access design compared with a family villa.
  • Surrounding finish. Decking, tiles, stone cladding or a timber surround. Send the finish drawings so the cabinet interface is designed rather than patched.
  • Who installs. Your contractor, ours, or a joint arrangement. This decides what documentation and support you need from us.

If your project needs something other than the standard rectangular footprint, our Customizable Shape Outdoor Spa covers square, round, oval and curved layouts for gardens, terraces and leisure areas. For a larger specification with additional water features, see the Luxury Outdoor Swim Spa with Massage Jets, LED & Water Features. To compare shell sizes within the same family, the shorter WS-115AⅣ-U is catalogued at 3880 × 2200 × 1250 mm, which is useful when width is fine but length is tight.

How this fits a wider furnishing package

Swim spas rarely sit alone. Poolside loungers, shade structures, outdoor dining and the changing or bathroom fit-out usually arrive on the same programme, and coordinating them with one supplier removes a layer of interface management. Our outdoor furniture range covers aluminium frames, rope weave, wicker and teak-accented sets that sit around the spa deck, while our services cover design coordination, custom and OEM work, freight, installation support and after-sales. As a China-based furniture and building materials manufacturer, we ship the spa alongside the rest of the package rather than as an isolated consignment.

A practical enquiry checklist

  • Site plan or sketch with the proposed spa position, pad level and finish levels
  • Access route photos: gates, alleys, overhead clearances, turning points
  • Electrical board details and distance from board to spa
  • Water supply point and drainage or pump-out arrangement
  • Local authority or body corporate requirements you have already identified
  • Preferred equipment options: heating, sterilisation, filtration, insulation, steps, cover
  • Target delivery window and destination port or site address

Figures quoted above are the catalogue values for this model. Included equipment, electrical requirements and options are confirmed in writing for the selected configuration before production.

Send your measurements and we will return a specification

Share the site plan, access photos and intended use, and our project team will confirm dimensions, equipment list and installation interface for WS-115EⅣ-U or an alternative model in the range.

Contact: PHILLIP  |  Phone / WhatsApp: +86-13928214007  |  Email: santerson@qq.com

Contact us to start the specification.