A request for quote for Outdoor Swim Spa WS-125AⅢ is only as useful as the information behind it. Two buyers can ask for the same model and receive prices that differ by a wide margin, because this unit sits in a configurable swim and hydrotherapy range: shell size, jet package, filtration route, heating source and electrical supply all change what has to be manufactured, packed and shipped. The checklist below sets out what to put in your RFQ so the quotation you receive can be compared line by line with competing offers.
Start from the reference dimensions, not the model code alone
The catalogue entry for WS-125AⅢ lists 5500 × 2300 × 1350 mm, which is the footprint you should hand to your architect, landscaper or pool contractor before anything else. Those figures decide whether the unit clears your deck opening, how much structural support the slab or platform needs, and whether a crane or just a forklift is required on site. Ask the supplier to confirm the dimensions in writing against the exact configuration you are buying, since options such as steps and insulation change the outer envelope and the access space around it.
Send a simple site plan with your enquiry: overall deck or patio size, the finished water level you want, distance from the nearest power supply and drainage point, and photographs of the intended location. A manufacturer specifying this unit needs that context to advise on steps, insulation and access panels rather than quoting a bare shell.
List the equipment package you actually want
The specification shown on the product page for this model includes one control system, one swim training system, one water pump, one filter pump, twenty jets and three LED lights, with a total power figure of 8.05 kW. Treat that as the reference build and state clearly in your RFQ which items you want kept, upgraded or removed. A quotation that simply says "WS-125AⅢ" tells you nothing about whether the swim training nozzle, the ozone system or the lighting count matches what you pictured.
- Control system: quantity, brand preference and whether you want the control panel inside or outside the plant compartment.
- Swim training system: confirm it is included if you intend to swim against a current, and ask for the nozzle arrangement for the chosen shell length.
- Water pump and filter pump: sizes, flow direction and how they are accessed for servicing.
- Jet count and layout: state which seating or lying positions the jets should serve.
- Water treatment: ozone is shown as standard on this configuration; ask separately whether UV sterilisation is offered and how it is priced.
- Filtration: cartridge or sand filtration, and what spare media is included in the crate.
Make the electrical and heating assumptions explicit
Total power is where quotations most often diverge, because a figure such as 8.05 kW describes one particular equipment combination and one supply assumption. In your RFQ, state the supply available at your site — phase, voltage, frequency and the breaker or isolator rating your electrician can install — and ask the supplier to confirm the connected load and recommended circuit protection for the configuration they are quoting. If you also want a heat pump for year-round water temperature, request it as a priced line item with its own power draw, so you can see how the running load changes rather than discovering it after order confirmation.
Insulation deserves its own line too. The catalogue lists insulation among the options for this range, and it matters most in cooler or windy climates where an uninsulated shell runs up heating costs. Ask what is insulated (shell, base, plant compartment), what material is used, and how the insulation affects overall dimensions.
Ask for the quotation in a form you can compare
Request an itemised breakdown rather than a single lump sum: shell and cabinet, equipment package, options, packaging, freight and any site-support service, each priced separately. Then fix the commercial terms in the enquiry itself — the Incoterm and destination, whether cargo insurance is included, the production window you are working to, and how the order is split between deposit and balance. Buyers sourcing through a one-stop furniture and building materials supplier often bundle the swim spa with nearby outdoor furniture, paving or pergola work, so ask whether combined container loading is available and how it affects freight cost.
For the delivery side, confirm packaging method and crate dimensions, the documents supplied for import clearance, and who handles customs paperwork. If the same supplier also arranges logistics and door-to-door delivery, ask them to quote both port-to-port and door-to-door so you can compare against your own freight forwarder instead of guessing.
Cover installation, warranty and spares before you sign
Ask what happens after the crate arrives: whether commissioning support or on-site guidance is offered, what the warranty covers for the shell, cabinet and each electrical component, and which wear parts you should hold locally. A written spares list with part numbers lets you price future maintenance now rather than hunting for a replacement pump controller two years later. Suppliers that provide installation and after-sales support should state the scope plainly, including what is excluded.
Finally, ask for the reference specification sheet for the exact configuration you are quoting and check it against your RFQ line by line. If a number in the quotation — dimensions, jet count, connected load — differs from the catalogue page, get the difference explained in writing before you place the order.
The shortlist to paste into your next enquiry
- Confirmed shell dimensions for the chosen configuration, plus access and clearance space.
- Equipment list with quantities: control system, swim training system, pumps, jets, lights, ozone or UV.
- Site supply details: phase, voltage, frequency, breaker rating, earthing arrangement.
- Heating and insulation choices with their power draw stated separately.
- Filtration route, spare media and recommended service access.
- Packaging, crate dimensions, shipping terms, insurance and clearance documents.
- Warranty scope by component, spares list with part numbers, commissioning support.
Send that package to two or three suppliers and the quotations will line up against each other instead of against your assumptions. If you are specifying a swim spa as part of a wider outdoor or villa fit-out, review the full swimming pool and swim spa range first, then send the enquiry with your site drawings attached — that is usually where a configurable model such as WS-125AⅢ starts to make sense on both performance and budget.