A smoked glass wardrobe front reads as a design decision, but the specification behind it is a procurement decision. Two quotations can carry the same words — smoked glass wardrobes — and still describe different doors, different carcass boards, different internal layouts and different freight terms. Before you sign a purchase order, compare the items below line by line.
1. What the glass itself is specified as
"Smoked" describes a tint, not a build. Ask each supplier to state the glass type, its thickness and how that tint is produced — a body-tinted sheet or a surface coating on clear glass. Coated sheets can react differently to cleaning agents and to repeated contact at the door edge, so confirm which construction you are being quoted and how the panel should be cleaned once it is installed.
Also fix the transparency question early. Smoked glass is a semi-transparent front: it softens what sits behind it rather than hiding it. If the design intent is a fully concealed storage wall, an opaque door in a matching finish does that job better. If the intent is a lit display with a muted background, tinted glass is the right call — and you should then specify the lighting at the same time.
2. Framed or frameless
The same tint sits in two different door constructions on our catalogue. Smoked glass aluminium frame wardrobes put the panel inside an aluminium surround, which gives a defined edge line and protects the glass perimeter along the travel of the door. Frameless glass doors maximise the glazed area and read lighter in a narrow bedroom, but they place more responsibility on the hinge or sliding hardware and on edge finishing.
When you compare quotes, ask for a section detail of the door: frame profile depth, where the glass sits, and what the visible edge looks like from the room side. That single drawing settles most arguments about price differences.
3. Door operation against the real floor plan
Hinged, sliding and walk-in configurations each need different clearances. A hinged glass door needs swing room in front of it, which competes with the bed and the ensuite entry. A sliding glass sliding door wardrobe keeps that circulation clear but only ever opens half the aperture at once. Walk-in layouts change the question entirely, because storage access is planned around a person entering the space rather than around a door.
Send your supplier the actual room dimensions and furniture layout, not just a nominal wardrobe width. In our own production the sizing is made to measure, so the width that differs from room to room is corrected in the workshop instead of on site with a scribe strip.
4. Internal layout, planned around what the client will store
The front panel is what an architect sees; the internal plan is what the end user complains about later. Specify hanging zones by garment length — short hung clothes above deep hung coats wastes height — and separate drawer zones from shelf storage rather than mixing them in one column. For apartment and hotel bedroom work we build these layouts around each project's storage habits, and doors, sizes, internal layout and surface finish are all quoted as part of the same made-to-measure package.
Ask for an internal elevation drawing with the drawer heights and shelf spans marked. If a supplier cannot produce one, they are quoting a box, not a wardrobe.
5. Carcass board, edge and finish range
Glass doors sit on a cabinet body, and that body is where cost is quietly removed. Confirm the board material, the thickness of the visible panels, how edges are finished, and which surface finishes are available so the carcass can be matched to other joinery in the same building — vanities, tall cabinets, media walls. Where a project needs a softer or fully opaque companion piece, custom minimalist bedroom wardrobes in flat panel finishes are usually specified alongside glass doors in the same bedroom scheme.
6. Hardware and the cycle it will actually get
Glass doors are heavier than panel doors of the same area, so hinges, slides, handles and soft-close components carry the difference. Ask which hardware brand and series are quoted, whether soft close is included or an option, and what load rating the sliding system carries per door. Then ask how many bedrooms in the project will open those doors daily — a private villa and a rented apartment block wear hardware at different rates, and the specification should follow that.
7. Packaging, freight and site sequence
Glazed panels travel differently from flat packs. Confirm the packing method for glass, how panels are protected in the container, and who carries cargo insurance. Our logistics service covers sea, air and rail forwarding with customs paperwork and door-to-door delivery, but import terms, duties and transit time should be agreed per shipment rather than assumed from a brochure.
Sequence matters as much as freight. Glass doors should arrive after the room's wet trades and floor finishes are complete, so confirm lead times against your site programme and keep the glass off the critical path of the handover date.
8. Installation and what happens afterwards
Ask who aligns the doors on site — your local contractor or a team guided by the supplier. We provide installation support, snag inspection and after-sales service including spare parts, so the person who set the hinges is reachable if a sliding door drops after a year of use. Get that scope in writing before order, because a glass panel replaced at a project's eleventh hour costs far more than the panel itself.
9. A specification checklist for your next enquiry
- Glass: type, thickness, tint method, cleaning instruction, and whether lit display shelving sits behind it.
- Door construction: framed or frameless, with a section detail showing the visible edge.
- Operation: hinged, sliding or walk-in, checked against clearances on the furniture layout.
- Internal plan: hanging heights, drawer zones, shelf spans, and an internal elevation drawing.
- Carcass: board material, panel thickness, edge treatment, finish range matched to other joinery.
- Hardware: brand and series, load rating, soft close included or optional.
- Commercial terms: Incoterms, packing method for glass, insurance, lead time against the site programme.
- After order: who installs, who inspects snags, and how spare parts are supplied.
Ordering from a made-to-measure supplier
SANTERSON has manufactured furniture and building materials since 2008 and supplies wardrobe projects as part of a wider fit-out, so bedroom joinery can be coordinated with cabinetry, vanities, lighting and flooring under one production and delivery plan. Every smoked glass wardrobe is made to the dimensions, layout and finish selected for that project, and we support custom and OEM work where a development needs its own material palette or branding.
Send us the room dimensions, the furniture layout and the finish schedule you are working to, and we will return an itemised quotation covering glass, doors, carcass, internal layout and hardware — so that when your three quotes arrive, they can actually be compared.