Why tall cabinetry is harder to ship than loose furniture
A multi function tall cabinet in the Laundry Integration collection is specified per project: dimensions, material and finish are chosen to suit the room, and the layout is drawn around the appliances, pipework and door swings. That made-to-measure character creates three shipping consequences.
- No substitution on arrival. If a carcass is damaged in transit there is no shelf replacement to buy locally; a new panel has to be manufactured and shipped, or the opening is filled on site by a joiner who never saw the drawing.
- Tight tolerances are fixed at the factory. A tall unit that is out of square by a few millimetres will not sit flush against a tiled wall, and no amount of packing shims fixes a twisted carcass.
- It travels with everything else. Tall cabinets usually share the container with vanities, shower sets, flooring and lighting for the same floors, so one badly planned load delays the whole fit-out sequence.
Step 1: lock the measured drawings before production starts
The single most expensive mistake in international joinery orders is producing against a drawing that nobody checked on site. For each unit confirm the finished floor level, the depth of wall finishes (tile, plasterboard, waterproofing), the position of waste and water points, and whether the door swing clears the room when open. Where a laundry shares a wall with a bathroom, note that services may sit inside the partition you are fixing into.
Send the shop drawings back to the site team for sign-off in writing, with the same revision number used on the packing list. When the shipment arrives and something does not fit, a matching revision number is what tells you whether the fault is in manufacture or in measurement.
Step 2: decide how much joinery goes in one container
Tall cabinets are bulky relative to their value, so consolidation matters. Group them with other built-in items from the same project — stacked laundry units, linen cabinets, vanities and mirror cabinets — rather than shipping joinery separately from bathroom ceramics. Mixing flat-packed carcasses with heavier fixtures also improves how the container stacks, which reduces movement damage.
Two practical rules we apply on project orders:
- Ship joinery in the first consignment, not the last. Cabinets define the room; get them into the building while wet trades and flooring are still on site so any correction is a local one.
- Split large apartment orders into floor-based lots. One container per floor or per unit type keeps each lot installable on its own instead of storing 40 identical carcasses in a warehouse.
Step 3: specify the packing, do not accept whatever is standard
Ask for the packing method in writing before production. For made-to-measure tall units we normally use knock-down construction where the design allows, with panels protected edge to edge, corner guards on every vertical arris, and a separate carton for hardware, hinges and drawer slides so nothing is taped inside a carcass that has to be opened on site.
- Mark every panel with the room code and drawing reference, not just "Kitchen 1". On a multi-unit job identical panels appear in several dwellings.
- List the container contents per room on the packing list. The installer should be able to pull one bundle and finish one laundry without opening the whole load.
- Photograph the loaded container before the doors close. That record is what supports an insurance claim if a panel arrives crushed.
Step 4: agree the delivery terms and the paperwork early
SANTERSON arranges freight forwarding by sea, air and rail along with customs documentation such as commercial invoices, packing lists and certificates of origin. For joinery orders the terms you choose decide who carries the risk on the last leg.
- Door-to-door keeps one supplier accountable from factory floor to site entrance, which suits contractors who do not have an import desk.
- Port-to-port is cheaper on freight but puts clearance, local transport and delivery scheduling on the buyer — including booking a tail-lift for oversized panels.
- Confirm cargo insurance separately. Freight cover and goods cover are not the same thing, and damaged joinery is a goods claim.
Import rules, duties and permitted materials differ by country and change over time. Ask your own customs broker to confirm what applies to timber-based cabinetry in the destination market before you commit to a delivery term; we supply the documents, but the clearance requirements are something each buyer should verify locally.
Step 5: plan receiving and installation as a separate activity
Tall cabinets should be checked before the crates leave the delivery vehicle. Inspect panel edges and corners, open every hardware carton against the packing list, and record any damage with photographs on the day of delivery — claims closed after the packaging has been cleared away are difficult to pursue.
Then keep the sequence right: flooring finished, wall finishes complete, appliances on site, and only then the carcasses. Store the panels flat and dry inside the building, off the slab, until the room is clean enough to work in. Where a project needs it, we provide on-site installation guidance and after-sales support including spare parts, so the last millimetres of the job are not left to guesswork.
A short pre-shipment checklist
- Site-verified dimensions signed off against a numbered drawing revision
- Finish and material samples approved before production, with the approval reference on the order
- Packing method agreed in writing, panels marked per room
- Joinery scheduled into the first consignment, grouped with related fixtures
- Delivery term, insurance and clearance responsibilities assigned to named parties
- Receiving inspection and installation date booked before the vessel sails
If you are sourcing built-in joinery together with other fit-out items, logistics and door-to-door delivery is handled as part of the same project scope rather than bolted on afterwards. Send us your drawings and the destination site, and we will quote the cabinets and their delivery as one line.