A swim spa quotation only works when the specification behind it is complete. For Outdoor Swim Spa WS-PC03, the catalog page gives you a starting point — shell size, pump counts, jet total and a power figure — but it does not tell you which options are included, how the unit will be powered on site, or how it reaches your address. This guide walks through the specification fields we ask buyers to fill in, so the drawing, the quotation and the delivered unit all describe the same product.

Start With the Base Configuration

WS-PC03 sits in our configurable outdoor swim and hydrotherapy range. The catalog entry records the following baseline. Treat these as reference values from the published listing; your confirmed configuration is what appears on the order drawing.

ModelWS-PC03
Catalog dimensions (L × W × H)3000 × 3000 × 1000 mm
Control system1 set
Water pump1 pc
Filter pump1 pc
Jet total50 pcs, including 4 water columns
LED lights1 pc
Total power (catalog)2.75 kW
Features shown on listingWater jets, LED lighting, Ozone
Swim training systemNot listed for this model in the catalog

Two things follow from that table. First, a square 3000 × 3000 mm footprint with a 1000 mm water depth is a compact hydrotherapy layout rather than a lap-length swim spa — if your brief requires continuous swimming against a current, say so at the specification stage and we will point you to a model that lists a swim training system. Second, the power figure on the listing reflects the baseline equipment set. Add a heat pump or change the pump arrangement and the electrical load changes with it.

State Which Options Are In and Which Are Out

The catalog lists optional accessories for this range: control systems, UV sterilization, water pumps, heat pumps, sand filtration, insulation and steps. Availability and compatibility vary by model, so an option line needs a yes or no against your unit — not a general "available on request".

For each option, record the same three details in your enquiry:

  • Required or not required. Write it out. An omitted line is an ambiguity, and ambiguity becomes a change order.
  • Where it sits physically. Filtration, control and insulation all take space; on a terrace or in a plant room that space has to be planned before the unit arrives.
  • Who supplies it. Options we supply arrive with the shipment. Anything you source locally — a local electrician's work, a foundation, a handrail — belongs on your side of the scope list.
Heat pumps and insulation are the two option lines that most often get decided late. They change both the electrical requirement and how the shell is built, so lock them down before drawings are issued rather than after production starts.

Confirm the Electrical Assumptions in Writing

The catalog power figure is not an electrical design. Before production we confirm:

  • Supply voltage and phase for your site (single-phase or three-phase, and the nominal voltage).
  • Available breaker capacity and cable size from your distribution board to the spa connection point.
  • Whether a dedicated circuit is required for the pumps and, if fitted, the heat pump.
  • Local earthing and residual-current protection requirements, which your electrical contractor handles to their own code.

Send us these values with the specification. We match the equipment set to them; we do not assume that a destination market's standard supply matches the catalog figure.

Add the Site and Delivery Data

A swim spa is a heavy, oversized item, so the site information belongs in the same document as the product data:

  • Access route from the delivery vehicle to the final position — gate widths, overhead clearance, turning space, and whether a crane or lifting equipment is needed.
  • The supporting base: slab, deck or plinth, its level tolerance, and who prepares it. This is normally local work.
  • Drainage and overflow route away from the unit.
  • Delivery address, Incoterms you want quoted, and any import documentation your customs broker requires.

Our logistics and door-to-door delivery service covers freight forwarding, packaging and container loading, customs paperwork and shipment tracking to the agreed delivery point. Site preparation and on-site electrical work remain with the buyer's local contractors unless the project agreement says otherwise.

Use One Document for the Whole Specification

The pattern that causes the fewest problems is a single specification sheet carrying the base configuration, the option decisions, the electrical assumptions and the site data. That document becomes the reference for the production drawing, the packing list and the installation brief. When we handle turnkey villa and hospitality projects, swim spa and pool specifications sit in the same schedule as the rest of the fit-out, which keeps one revision history across the whole package.

If you are comparing WS-PC03 with larger formats in the same range — for example a 5000 × 3000 mm configuration such as Outdoor Swim Spa WS-PC05, or a spa shaped to a specific plan under our customizable shape outdoor spa option — put all candidates in one enquiry. Same site data, same electrical assumptions, and the comparison becomes about layout and jet arrangement instead of about missing information.

A Quick Pre-Enquiry Check

  • Model and catalog dimensions confirmed against your available space, including clearance for access and maintenance.
  • Jet arrangement and water columns noted — 50 jets with 4 water columns on the baseline listing.
  • Ozone and LED lighting included or excluded stated explicitly.
  • Heat pump, UV sterilization, sand filtration, insulation and steps each marked required or not required.
  • Voltage, phase and available breaker capacity supplied.
  • Access route, base preparation and drainage responsibility assigned.
  • Delivery address and Incoterms stated.

Send that list and we can quote the exact configuration rather than a generic one. As a one-stop furniture and building materials supplier, we then coordinate the spa alongside the rest of your project package — outdoor furniture, interior fixtures and finishes — through a single production and shipping schedule.

Send your WS-PC03 specification to SANTERSON (contact: PHILLIP, +86-13928214007, santerson@qq.com) for configuration review and a quotation. Enquiries receive a response within 24 hours during business hours, Monday to Saturday, 8:00 AM–6:00 PM (GMT+8).