A wardrobe proposal is easy to skim and hard to compare. Two quotations can carry the same product name, similar finishes and almost identical totals, yet describe very different buildings. Before you sign a purchase order for Shelf Focused Modular Wardrobes, read the proposal the way a project manager reads a drawing set: by asking what has actually been defined, and what has quietly been left for somebody else to solve on site.
The exercise matters most for shelf-led storage. Hanging zones are forgiving; a rail is a rail. Shelves are not forgiving. Every fixed board changes what the compartment can hold, how tall the stored items can be, and whether the unit still works after the client moves in. This guide walks through the sections of a manufacturer’s proposal you should read closely, using shelf-focused modular wardrobes as the working example.
1. Confirm the proposal is written for your room
The first question is not about price. It is whether the document refers to your specific openings, walls and ceiling heights, or whether it is a generic catalogue response with your project name on the cover.
In our Shelf Focused Modular Wardrobes line, sizing is made to measure and the layout is set per project, so a serious proposal should already carry room-by-room dimensions rather than a single standard width. If the document lists only nominal sizes, treat the total as provisional: the price that follows is built on an assumption, not on your site.
Check three things in this section before anything else:
- Whether heights are stated to the structural ceiling or to a finished ceiling that has not been built yet
- Whether skirting, architraves, cornices, downlights, air grilles and door swings have been allowed for
- Whether out-of-plumb walls and uneven floors are noted as site conditions to be corrected before installation
A manufacturer who has read your drawings will show that work in the numbers. One who has not will show a clean rectangle.
2. Read the internal layout, not just the elevation
Marketing images sell wardrobes; internal layout schedules decide whether they work. Ask for an interior elevation for every module, with shelf positions and clear opening heights dimensioned.
Then test that layout against how the space will actually be used:
- Shelf spacing versus stored items. Folded linen stacks, towels, handbags and shoe boxes have different heights. A grid of equal shelves wastes vertical space in most bedrooms.
- Adjustable versus fixed shelves. Adjustable shelf standards let the owner re-plan storage later; fixed shelves are cheaper to produce but lock the layout in place.
- Depth. A deep shelf swallows small items unless it is divided. Ask what happens at the back of the carcass, not only at the front.
- Mixed zones. If part of the run needs hanging, ask whether the proposal pairs your shelf modules with Hanging Modular Wardrobes or whether the hanging requirement has been quietly dropped.
- Drawer content. Where small items belong in drawers rather than on shelves, a Drawer Focused Modular Wardrobes module may be the correct answer for that section.
- Open versus closed storage. Open shelves display, and they also collect dust in a bedroom. Decide deliberately which bays stay behind doors.
If the proposal shows one interior layout repeated across all modules, that is a signal worth questioning. Shelf-focused wardrobes are specified because storage habits differ from room to room.
3. Check what the carcass and shelves are made of
“Wardrobe” covers a wide range of constructions. A proposal should name the board substrate, the surface material, the edge treatment and the thickness for three separate parts: the carcass, the shelves, and the doors.
- Carcass. Ask what board is used and how the box is assembled — cam locks, dowels, glued dado joints or a fully captured back panel. A captured back panel stiffens the unit and reduces racking in transit.
- Shelves. Shelves are the loaded members of the unit. Confirm board thickness and clear span for each shelf width, and ask what span the manufacturer considers safe for the finish you have chosen.
- Edges. Edge banding quality decides how a wardrobe looks after two years. Ask whether all four edges are banded on visible parts, and what adhesive process is used.
- Finish. Our modular wardrobe range is offered with material and finish choices specified per project, so the proposal should name the exact board, colour or veneer reference rather than a family name such as “white”.
Where a supplier offers bespoke finishes and textures through their custom service, ask which are standard production options and which require a separate development step. That difference shows up in both price and schedule.
4. Look for the hardware schedule
Hardware is where proposals get thin. A single line reading “hinges, runners and handles included” tells you almost nothing.
Ask for a schedule that lists hinges with closing action, slide type and load rating for any drawers, shelf-pin or shelf-support system, door mechanism, and any integrated lighting. For tall wardrobe runs, also ask how the doors are supported at the top and bottom, and what tolerance the mechanism allows if the floor moves.
Two practical details are worth confirming in writing: whether hardware is pre-fitted or supplied loose for site installation, and whether replacement parts can be ordered later as spares. Both affect the cost of living with the joinery long after handover.
5. Verify how it will be packed, shipped and received
For wardrobes crossing an ocean, logistics is a technical question, not an administrative one. Built-in joinery that arrives with chipped edges or a warped shelf cannot be corrected on site.
A good proposal states how modules are packed and protected, whether panels ship flat or assembled, how the shipment is consolidated, and what the receiving team should inspect on arrival. Where the supplier handles freight by sea, air or rail together with customs paperwork and door-to-door delivery, ask which leg each quoted figure covers and where your responsibility begins.
Confirm Incoterms, who arranges insurance, and how damaged or missing components are reported. Ask these questions before the order is placed — after it, they become claims.
6. Understand what happens at handover
The last section of a proposal is often the shortest and the most valuable. Clarify who installs, who levels and scribes units to uneven walls, who makes good around skirting and architraves, and who signs off the snag list.
Also ask what happens when something goes wrong afterwards: how faults are reported, which parts are covered for how long, and whether replacement components can be ordered in single pieces rather than whole modules. Suppliers who describe installation support, inspection and after-sales service should say plainly how that support is delivered in your country — by their own team, by a trained local contractor, or through remote guidance to your installer.
7. Compare proposals on scope, not on headline price
Once two or three proposals are in the same format, comparison becomes simple. Build a short table with one column per supplier and one row per item: dimensions confirmed from site, interior layout per module, board and finish references, edge banding, hardware schedule, packing method, delivery terms, installation responsibility, and after-sales scope.
In most cases the cheapest total is not the lowest risk; it is simply the proposal that defined the fewest things. The gaps move somewhere else — to your site team, your installer, or your client.
A shortlist of questions to send back
- Are these dimensions taken from my site drawings or from standard sizes?
- Can I see an internal elevation for each module, with shelf heights dimensioned?
- Which shelves are adjustable, and on what pitch?
- What is the maximum clear span for the shelf board at the width you have proposed?
- Which board, colour and edge references exactly are included in this price?
- What hardware brand, model and load rating sit behind “included”?
- How are modules protected for ocean freight, and what should we inspect on arrival?
- Who installs, who scribes to the walls, and who covers snags?
Nine questions take a few minutes to send and usually produce an answer that changes the comparison. A manufacturer who answers them precisely is telling you something useful about how the project will run.
Where our modular wardrobe range fits
SANTERSON has manufactured furniture and building materials since 2008 for residential, villa and hospitality projects, supplying built-in joinery alongside the rest of the fit-out. The built-in furniture range covers shelf-focused, drawer-focused, hanging, glass and combination modular wardrobes, all specified to project dimensions, layouts and finishes.
Where a project needs something outside standard production, our custom and OEM service covers bespoke design and prototyping, material and finish selection, and private labelling. For whole-room packages, wardrobe joinery is coordinated with the other elements of the fit-out — cabinetry, doors and wall panelling, flooring, lighting and bathroom fixtures — under one production and delivery schedule.
Send us your drawings and we will return a proposal with room-by-room dimensions, interior layouts and named material references, so you can compare it line by line against the other quotations on your desk.