An arched wardrobe front is one of the few built-in details that a client notices from across the room — and one of the few that a site team can only fix by taking the whole unit back to the factory. Before a project signs off Arched Paneled Wardrobes, the questions worth asking are rarely about style. They are about dimensions, tolerances, and who confirms what, in writing, and when.

These wardrobes sit within our Classic Paneled collection and are made for residential wardrobe projects: sizing is made to measure, materials and finishes are selected per project, and the internal layout follows the space rather than a standard module. That flexibility is exactly why approval needs structure. Below is the sequence we ask architects, builders and procurement leads to work through before production is released.

1. Confirm the opening from a site survey, not a drawing

Arch geometry magnifies small dimensional errors. A radius drawn on a plan rarely matches what the plasterboard and floor screed end up delivering on site, so the working dimensions should come from a survey of the finished opening — after flooring, wall finishes and skirting are set out. Ask three things before you approve anything: which level the measurements are taken from, whether the ceiling is flat across the wardrobe run, and what the reveal between arch and cornice should be. If your package includes other built-ins, such as a full-house custom wall cabinet project with arched niches and full-height panels, take one coordinated survey for the whole joinery package instead of separate ones. One set of surveyed dimensions keeps arch radii, panel joints and shadow lines consistent from room to room.

2. Lock the door construction before you lock the finish

The arch is a frame decision long before it is a colour decision. Paneled doors can be built in several ways, and each behaves differently under a curve: raised and recessed panel profiles read as traditional joinery, moulded panels carry softer decorative detail, and solid-wood construction — as in Classic Paneled Solid Wood Wardrobes — is the reference point clients usually have in mind when they ask for an arched front. Confirm the panel type, the frame profile, and whether the arch is formed in the door leaf or in an applied architrave on the carcass. Those two outcomes look similar in a rendering and cost and install very differently.

3. Specify finishes as samples, not names

Wood tone and sheen are where a wardrobe either matches the rest of the joinery or fights it. Our wardrobes are offered across material and finish options — veneered, lacquered, melamine, acrylic and solid timber constructions — and we supply the selected finishes for approval rather than relying on a colour name in a schedule. For projects that need a wardrobe to disappear into matching wall panelling or cabinetry, request the physical sample against the same reference used elsewhere in the fit-out, and check it under the room's actual lighting before signing. Where a project requires an exact match, agree the standard of match you expect in writing: species cut, grain direction, and whether the comparison is made on a flat panel or on a profiled one, since profiling lightens edges.

4. Settle the internal layout while it is still cheap to change

Arch approval tends to absorb all the attention, and the inside gets approved by default. It should not. Hanging heights, drawer banks, shelf spacing, lighting provisions and any vanity or dressing-table interface need to be fixed on the same drawing that shows the arch, because the arch governs the top of the carcass and therefore the usable hanging zone beneath it. If the bedroom wall also carries a niche shelving run or an integrated vanity, draw them as one elevation with one set of dimensions.

5. Agree what is inspected before shipment

For made-to-measure joinery travelling internationally, the pre-shipment check should be agreed in advance and written into the order: assembled or flat-packed, arch radius verified against the approved drawing, finish checked against the signed sample, door alignment and hardware schedule confirmed, and packing specified for the transport route. Our Custom & OEM service covers bespoke finishes and textures with flexible order quantities, so a sample or first-article door is a practical step on most residential projects rather than an unreasonable request.

6. Plan the installation sequence around the arch

Arched fronts need a square, level and settled opening to sit correctly. In programme terms that means wardrobes are installed after wet trades, flooring and ceiling lines are complete, with enough clearance for the carcass to be brought in and assembled in place. Confirm who prepares the opening, who sets out the unit on site, and how snags are recorded at handover — our installation and after-sales support covers on-site installation and inspection alongside spare parts and maintenance, but the opening preparation sits with the builder unless the contract says otherwise. Say so explicitly in the scope.

The approval record to sign off

Item to confirmEvidence to hold on file
Opening dimensionsSite survey of the finished opening, dated and signed
Arch form and panel typeApproved elevation showing arch radius, frame profile and door construction
FinishPhysical sample reference, checked under site lighting
Internal layoutSame elevation as the arch: hanging, drawers, shelves, lighting
Pre-shipment checksInspection points listed on the order confirmation
Installation scopeWritten split between site-prepared opening and supply-and-install work
A practical rule: nothing on the drawing should be released to production while any dimension is marked "to be confirmed". Once an arched carcass has been machined, changes are not adjustments — they are replacements.