A swim spa sits in an unusual position on a villa or resort schedule. It is a piece of loose furniture, a civil element and an electrical load at the same time, which means it touches three or four consultants before anyone has signed off on it. That is exactly why enquiries come back as “please advise price and lead time” with no dimensions attached: the brief was never translated into a procurement package. Below is how to do that translation for one of our longer configurable models, the Outdoor Swim Spa WS-PC06ST-L, so the first reply you receive is a real quotation rather than another round of questions.
Start with what the brief already tells you
Design briefs rarely state product specifications. They describe behaviour: a lap you can swim against in the morning, a warm seat for four after dinner, a water feature visible from the pool deck. Your job is to convert each sentence of intent into a line item someone can price.
Take the length first. The catalogue entry for this model lists an overall envelope of 6390 × 2400 × 1470 mm, and that footprint is the reason the WS-PC06ST-L exists in the range at all — it gives roughly half a metre more swim lane than the WS-PC06ST at 5900 mm, on the same shell width. If your brief says “an adult should be able to swim uninterrupted”, measure the deck and check whether 6.39 m fits with access clearances, before you decide which variant to ask about. If it does not fit, say so in the enquiry and ask us to work down the range instead of assuming a shorter lane is acceptable.
Then separate what is standard from what is optional. The features shown against this model are water jets, LED lighting, ozone sanitation and a swim training system, with a total power figure of 6.55 kW in the captured specification. Optional items listed in the catalogue include heat pumps, UV sterilisation, sand filtration, insulation, steps and additional control systems. A brief that says “year-round use” is really a request for a heat pump plus insulation; a brief that says “low maintenance” is really a question about filtration and ozone. Write those requests down as options, not assumptions.
The six items an enquiry must contain
Every quotation we can price without a follow-up call carries the same six blocks. Missing one is what turns a two-day turnaround into a three-week email chain.
- Site envelope. Set-out dimensions, whether the shell is recessed, semi-recessed or above ground, and what surrounds it — timber deck, pavers, lawn. Recessed installs change how access panels and steps are arranged.
- Intended use. Daily lap training, guest hydrotherapy, children’s play, or a spa seat that is mostly decorative. Use drives jet count and whether the swim training system is set for continuous flow.
- Water temperature policy. A single operating temperature or two zones. This determines heat pump sizing and insulation level, and it is the most common source of a revised quotation.
- Electrical supply available at site. Single-phase or three-phase, available breaker capacity, and where the control system can sit relative to the shell. The 6.55 kW figure is a catalogue starting point; confirm what your electrician can deliver before locking options in.
- Delivery terms. Port of entry, whether the site is reachable by a standard container and crane or tail-lift, and who handles rigging. We arrange freight by sea, air or rail with door-to-door delivery, but access at the last hundred metres is a site question.
- Programme dates. Not “ASAP”. The date the water has to be in, and therefore the date the shell has to land on site.
If you cannot answer one of these yet, say so explicitly and mark it as pending. A flagged unknown is faster to resolve than a silent gap.
Coordinate the swim spa with the rest of the outdoor package
On most projects the swim spa is not bought alone. It sits inside an outdoor living scheme that also needs loungers, shade and a dining set, and those decisions affect each other. A recessed shell with a flush deck edge needs sun loungers positioned so they do not block the filter pump access. A pergola overhead has to clear the water surface for anyone standing under the swim jets.
This is where a single supplier earns their keep. As a one-stop furniture and building materials supplier, we produce the surrounding pieces as well: the Aluminium Sling Sun Lounger Collection with adjustable backrests for the deck edge, and a Motorized Louvered Aluminum Pergola with LED Strip and Zip Screens when the spa seat needs shelter without enclosing the space. Because these come off the same project file, the frame finishes, timber tones and lighting colour temperature can be matched rather than approximated after the fact — the kind of consistency that is expensive to retrofit when three different vendors each guessed.
What our team does with your brief once it arrives
The workflow on our Interior Design Services page is the same one applied to a swim spa enquiry: project brief and design proposal, then quotation with detail confirmation, then production, shipment and follow-up. In practice that means we read your envelope dimensions against the catalogue shell, tell you honestly when the model in your head does not fit the slab you have poured, and propose the closest variant instead of quoting the wrong one.
Where a project genuinely needs something between catalogue models, our Custom & OEM Service covers bespoke material finishes, prototyping and flexible order quantities. For a swim spa specifically, configuration is where most of the value sits: filtration type, heating approach, insulation package, steps, lighting layout. Tell us the constraint and we will specify around it.
After the shell leaves the factory, the logistics side covers freight forwarding, customs paperwork, container loading and tracking through to door-to-door delivery, and our installation and after-sales support covers on-site guidance, inspection and spare parts. Confirm the scope that applies to your project in writing at quotation stage — terms vary by destination, and we would rather set that expectation now than argue about it at handover.
A short example: converting one paragraph of brief
Brief as written by the client: “The owners want a lap pool they can actually swim in, but the north terrace is only about seven metres wide and they will use it through winter.”
Converted into an enquiry:
- Shell under consideration: WS-PC06ST-L, catalogue envelope 6390 × 2400 × 1470 mm; confirm against a 7 m terrace with access clearance at the plant end.
- Use: daily adult lap training plus occasional hydrotherapy seating — swim training system required, jet layout for massage rather than full count.
- Winter operation requested: quote heat pump and insulation package as options, with the running-power implication stated.
- Supply to be confirmed by electrician; please state three-phase requirement for the selected configuration.
- Deck finish: pavers, flush edge — advise access panel arrangement and steps accordingly.
- Target handover date: [state date]. Port of entry: [state port].
That message is roughly one hundred words and it lets us return a priced, specified proposal in the first pass. The vague version takes three weeks.
Before you press send
Two final checks. First, read your own brief back against the enquiry: every promise made to the client about water, temperature and swimming should appear as a line somewhere in the message. Second, treat anything on this page as a catalogue reference rather than a fixed specification — dimensions, power figures and included equipment for the selected configuration are confirmed on your quotation, because options change them.
Send us the brief with the six blocks filled in and we will come back with a proposal you can put in front of the client. If the terrace is smaller than you hoped, or the winter requirement pushes the power beyond what the supply allows, we would much rather tell you at enquiry stage than discover it on site.