A wood veneer door is only as good as the sheet of timber laid over its core, and that is the part a drawing cannot fully describe. Grain figure, colour tone and sheen all shift with the cut, the batch and the lacquer. Before your Santerson Wood Veneer Hinged Doors go into production, a physical finish sample is the cheapest checkpoint in the whole door package — it settles expectations between the specifier, the site team and the factory while changes are still free.
The steps below follow how our custom and OEM work is normally run: brief, detail confirmation, then production. Use them as a review checklist for your own approval process.
1. Confirm the specification on paper before requesting a sample
A sample made against an incomplete drawing only proves that you can make something, not that you have agreed on the right thing. Send the opening sizes, leaf thickness, hinge side and hand, frame detail, and the intended veneer species and cut for each door type. Our doors are made to measure, with material and finish options specified per project, so a sample request should reference the same schedule the quotation was priced against — room by room, or door type by door type.
State what is being sampled. A veneer swatch, a finished corner section, and a full leaf are three different approvals with three different costs, and projects often need the first two before committing to the third.
2. Ask for the sample under the same finish system as production
Veneer that has not been lacquered tells you almost nothing about how it will look installed. Request the sample with the full build-up: substrate, edge treatment, stain or glaze if your design uses one, and the topcoat sheen. Matte, satin and high-gloss finishes on the same veneer read as different products under site lighting, and a mismatch discovered at handover is expensive to correct.
Where the door sits next to other veneered work — Wood Veneer Panels, wardrobes or kitchen fronts — ask for the sample in the same batch logic you intend to order. Veneer is a natural material, and tone varies between batches even within one species.
3. Review the sample in the conditions where the doors will live
Do not approve a sample under showroom light. Tape it to the actual opening, or place it against the wall finish you have selected, and look at it in the morning, midday and after dark. Check four things specifically:
- Grain direction and matching — whether the leaf runs vertical or horizontal, and how adjacent doors in a pair or set read side by side.
- Edge and profile detail — how the veneer wraps the edges and meets the frame; this is where quality shows at close range.
- Sheen under your lighting — reflections from downlights, lobby fittings or bedroom sconces change how dark or warm a tone appears.
- Contrast with surrounding finishes — flooring, skirting, wall panelling and ironmongery all pull the eye against the door face.
Mark the approved sample and keep it on site. It becomes the reference for inspection when the delivery arrives, which matters most on multi-unit work where doors arrive in several consignments.
4. Sign off a written record, not a verbal one
Once the sample is accepted, confirm in writing the species and cut, finish build-up and sheen, dimensions and hardware preparation, and which sample number or date governs production. If you change anything after that point — a different hinge hand, a revised leaf height, a new tone — request confirmation again rather than assuming the approved sample still applies. This is the detail-confirmation step of our cooperation process, and it protects both sides when doors are one of the last trades on site.
5. Plan the sample inside the project programme
Sample approval should sit before production release, not alongside it. Build in time to request the sample, ship it to site or to your studio, review it with the client, and record the decision — then treat that approval date as the trigger for releasing the door order. Doors are typically installed late in a programme, so an early sign-off protects the delivery window without delaying anything else on site.
If your project also needs Santerson Flush Hinged Doors in other areas, sample those in the same round. One review visit can settle several door types at once, and it keeps the joinery package consistent across the building.
What to send us when you start
To move straight into sampling rather than a round of clarification, send: your door schedule with opening sizes and quantities; the finish intent (species, cut, sheen) or an image reference; the wall and floor finishes the doors will meet; and where the sample should be delivered. Our team confirms the specification against that schedule before any veneer is cut.
Talk to us about sampling for your joinery package through our Custom & OEM Service, or send drawings and quantities by phone or WhatsApp on +86-13928214007.