A wardrobe quotation that looks complete can still leave the costly items out. Two quotes for what appears to be the same metal frame open wardrobe package can differ widely once you compare what each one actually prices: the frame section, how far the carcass boards span unsupported, which hardware is included, whose drawings govern production, and what the quoted price covers all the way to site. This guide lists the line items worth confirming before you sign, using our own specification practice as the reference point.

Start with the scope of supply, not the unit price

Open wardrobes are usually quoted by linear metre or by module, and the two methods are not interchangeable. Ask the supplier to state, in writing, which method applies and what one unit includes. A per-metre rate may exclude end panels, top boxes, corner transitions or a return leg; a per-module rate may exclude the infill boards between frames. Our Metal Frame Open Wardrobes are made to measure, with the layout and dimensions set for each space, so we quote against your room drawing rather than a standard module list.

Then check what sits outside the wardrobe line. Skirting removal, wall packing, floor levelling, ceiling recesses and any coordination with lighting or curtains are usually site works. If they are not in your scope of supply, they will appear later as a variation.

Read the frame description carefully

"Metal frame" covers several different products. Three details change both the look and the price:

  • Frame material and finish. Anodised, powder-coated or wrapped finishes age differently, and a wrapped profile on a timber-look frame will not behave like a solid metal finish at edges and cut ends. Ask which finish system is quoted and see a physical sample before confirming the colour code.
  • Profile width and sight line. A slim frame reads lighter in a room but needs a more accurate wall plane and tighter installation. The quoted profile size should match the drawing you approved.
  • How the frame joins. Mitred corner joints with visible fixings, or coped joints with concealed connectors, are not the same job. Ask for a joint detail drawing for external corners and for any junction with a wall.

If your project also uses glazed fronts elsewhere, note that metal frame open wardrobes and smoked glass aluminium frame wardrobes are separate product families with different profile systems. Matching a metal colour across the two needs a sample comparison, not a shared colour name.

Check what the carcass boards are specified to do

In an open wardrobe the boards are on show from both sides, so the specification matters more than in a closed cabinet. The quote should state board type, board thickness, edge treatment and the finish on both faces. Unspecified items usually default to the cheapest option.

  • Both-face finish. Confirm the rear face and any visible return are finished to the same standard as the front. A laminate applied to one side only will telegraph through an open, double-sided unit.
  • Edge banding. Ask whether edges are banded on all four sides and what material the banding is. Thin PVC on a visible shelf edge shows the joint line quickly.
  • Span and deflection. Long open shelves carry weight with nothing underneath to support them. Ask the supplier to state the maximum clear span for each shelf width at the quoted board thickness, and which shelf depths need a centre support or a stiffening profile.
  • Hanging rail loading. A rail spanning an open bay deflects under dense hanging. Confirm the rail material, the rail diameter and the maximum unsupported span in the quotation, and ask how the rail is supported at mid-length for wider bays.

We specify finish, layout and dimensions per project on our freestanding open wardrobes as well as the wall-mounted versions, and we ask for confirmation of dimensions and selected specifications before production starts. That confirmation step is worth building into your own purchase order.

List the hardware that is and is not included

Hardware is where two similar quotes diverge most. Ask for an itemised schedule showing brand or model line, load rating and quantity for each fitting:

  • Hanging rails, rail brackets and any drop-down rail mechanism
  • Drawer runners, including full-extension or soft-close specification and the weight rating
  • Shelf supports and adjustable shelf pins, with the number of rows provided
  • Trouser pulls, shoe shelves, jewellery trays, belt and tie fittings — these are extras on most quotations
  • Integrated lighting: profile section, driver location, whether wiring is supplied to a point or only to the unit
  • Doors, if part of the run closes off — hinges or sliding gear are often quoted separately from open units

Where a quotation bundles "internal accessories as per drawing", ask for the drawing to be attached and referenced by revision number in the contract. Otherwise there is no fixed baseline if an accessory is missing at delivery.

Confirm who controls the drawings

For made-to-measure joinery, the approved drawing is the contract. Check that the quotation names the drawing revision it prices and that you receive a production drawing for sign-off before manufacture. On our side, the workflow runs from project brief and design proposal to quotation and detail confirmation, then production — so the dimension check happens before boards are cut, not after.

The production drawing should show finished dimensions against the room's actual site measurements, floor and ceiling levels, door and skirting clearances, switch and socket positions, and the position of any services behind the wall. For an open wardrobe this is not a formality: there is no door to hide an out-of-level wall or an exposed cable trunking.

Check what the price actually covers

If you are buying from an overseas manufacturer, the number on the quotation is rarely the delivered cost. Ask which of these are included and which are your responsibility:

  • Packaging standard and the packing list, with crate or carton dimensions for site access
  • Freight mode and the delivery point — port, kerbside or room of installation
  • Customs clearance, duties and taxes, and who prepares the paperwork
  • Insurance in transit, and the inspection window for claiming damage
  • Installation labour, snag rectification and what happens if a unit arrives out of square
  • Spare parts availability for hardware, since a discontinued runner is difficult to match years later

We handle freight by sea, air and rail with customs documentation and door-to-door delivery as part of the project scope, which is one reason customers consolidate wardrobes with other fit-out items on one order. Our built-in furniture range covers wardrobe families alongside cabinetry, panelling and doors, so a single production drawing set can keep finishes consistent across the bedrooms rather than matching them by catalogue code.

A short pre-award checklist

  • Quoting method stated (per linear metre or per module) and what one unit includes
  • Frame material, finish system, profile size and joint detail confirmed with a physical sample
  • Board type, thickness, both-face finish and edge banding specified
  • Maximum clear spans given for shelves and hanging rails at the quoted thickness
  • Hardware schedule itemised by brand or model line, with load ratings
  • Priced drawing revision named, with a production drawing for sign-off before manufacture
  • Delivery point, duties, insurance and installation responsibility written into the order
  • Site preparation items identified as yours or the supplier's

A quotation you can compare line by line is worth more than a lower headline number. Send us your room drawing and the layout you want, and we will price the frame section, board specification and hardware set against it, with a production drawing for your approval before anything goes into production.