A full height media wall is one of the easiest items in a fit-out to misquote, because the price depends on things that are not visible in a reference photo: the finished width and depth of each return, what sits behind the panel, how the screen is supported, which doors actually open, and how the unit meets the ceiling line. If your request for quote only says "media wall, four metres, oak finish", the supplier can only guess — and the two cheapest quotations you receive will not be quoting the same product.

This guide sets out what to put in a request for quote when you are specifying Santerson Full Height Media Walls. The collection is part of the Media & TV Walls range and is built around project-specific dimensions, layout and finish rather than a fixed catalogue size, so the information you supply directly determines how firm the price and the delivery programme will be.

1. Room data and the wall itself

Start with the wall, not the unit. Send the overall run length in millimetres, the floor-to-ceiling height at more than one point — ceilings in refurbished villas and apartments are rarely level — and the depth you want the carcass to project from the finished floor line. Note anything that interrupts the run: skirting that will be removed or scribed around, a radiator, a switch plate, a structural column, a fireplace rebate, or a door opening close to the unit end.

Tell us whether the finish floor and ceiling levels are already fixed or still to be set. A wall system ordered against an unresolved floor level is a common cause of a site variation on joinery.

2. Screen size, mounting method and clearances

Give the screen make and model, or at least the screen size, the VESA pattern and the weight. A modest bedroom panel and a large living-room panel impose very different requirements on the supporting structure and on the recess depth. State how you intend to mount it — fixed flat bracket, tilt, full-motion arm that pulls away from the wall, or a screen that lifts out of a cabinet. If the screen is to sit inside an opening rather than on the face of the panel, we need the finished opening dimensions and the clearance needed for the bracket to work.

Also confirm what you want visible once installation is complete. Some buyers want the screen framed by the panel with a tight shadow gap; others want it recessed into a niche with concealed services. Both are achievable, but they are not interchangeable at a late stage.

3. Services: what runs behind the panel

This is the section most requests for quote leave out. List every service that has to reach the wall: mains sockets behind the screen, a power point for a soundbar, HDMI and ethernet runs to a media cupboard or rack elsewhere in the room, speaker cable to ceiling or in-wall speakers, an antenna feed, and low-voltage wiring for any integrated lighting. Tell us where the collection point is — a device niche in the same unit, a separate tall cabinet, or a rack in another room.

If you want integrated TV panels or lit display niches, say so at quotation stage. Lighting inside the unit changes both the panel build and the driver location, and drivers need to sit somewhere accessible for maintenance. Where electrical work is being carried out by your own contractor, state that clearly in the request so the panel can be prepared with the correct cut-outs and access panels rather than finished solid.

4. Storage layout: open, closed, and what goes where

Send a simple sketch or an annotated plan elevation showing which sections are open shelving, which are closed cabinets, and which are display niches. For closed sections, specify doors or drawers, the number of internal shelves, and whether shelf heights need to be adjustable. Note what you intend to store: a record player needs a ventilated or open bay, a games console needs ventilation and cable access, board games and books need different shelf depths, and heavy items belong below the screen rather than above it.

If your media wall is part of a wider storage run, mention adjacent items now — full height storage walls, tall cabinets or shelving — so the profiles, reveals and finishes are coordinated across the joinery package instead of matched after the fact.

5. Finish, substrate and hardware

State the finish you want and how it should be proven before production: a sample board, a drawn finish code, or a reference to another product in the same building. Santerson works with wood, metals, engineered stone and laminates across its custom and OEM service, so a finish can be matched to existing cabinetry, doors or wall panelling — but that match has to be specified, not assumed.

Specify handleless or handled fronts, the hinge and runner quality you expect, and whether any doors need soft close. For rooms with children or heavy daily use, say so; it changes both hardware selection and edge detailing. If a fire-rated or moisture-resistant substrate is required by your project specification, include that requirement in writing.

6. Quantities, site location and delivery terms

Give the number of each configuration, the project address, the floor level, lift or stair access, and whether there is a restricted delivery window. A media wall for one apartment and a repeated unit across a villa development are quoted differently, because repeat units share tooling and quality-control steps. If your project is in Australia, tell us the destination state so freight and customs documentation can be arranged through our logistics and door-to-door delivery service; we arrange sea, air and rail freight with the commercial paperwork that goes with it, and the Incoterms you want quoted should be stated in the request.

7. Drawings, deadlines and who signs them off

Attach whatever exists: architect's elevations, an interior designer's detail, a marked-up plan, or photographs of the wall with dimensions written on them. Then state the date you need prices by, the date the site needs the goods, and who has authority to approve shop drawings. Our cooperation steps run from project brief and design proposal through quotation and detail confirmation to production, shipment and follow-up, so approved drawings are what unlock production — and a named approver keeps that step from stalling.

A short checklist for your next enquiry

  • Wall run length, floor-to-ceiling heights at several points, required carcass depth, and every obstruction on the wall.
  • Screen model, weight, VESA pattern, mounting method and finished opening or clearance dimensions.
  • Full services schedule: power, HDMI, ethernet, speakers, antenna, lighting, and where equipment is stored.
  • Layout sketch showing open shelving, closed cabinets, niches, shelf counts and drawer banks.
  • Finish reference and how it is to be approved; hardware specification; any substrate requirement.
  • Quantities, project address, access constraints, destination country and the Incoterms you want quoted.
  • Quotation deadline, site delivery date, and the person who approves drawings.

Send those items and a quotation for Santerson Full Height Media Walls can be priced on the actual build rather than on assumptions — which is what keeps the number you approve the same as the number you pay. If you are specifying the media wall as part of a wider joinery or fit-out package, our team can coordinate it with the cabinetry, doors and panelling around it.

Email your drawings, dimensions and services schedule to santerson@qq.com, or contact us through the Santerson contact page. Enquiries are answered within 24 hours during business hours, Monday to Saturday, 8:00 AM to 6:00 PM (GMT+8).