A glass corner wardrobe usually starts as a drawing problem and ends as a measurement problem. The return that matters most on a built-in joinery order is not the finish sample but the dimension sheet: which wall meets which at an angle, how deep the recess actually runs, and what the doors need to clear once the room is furnished. Below is the information set we ask project buyers, designers and contractors to gather before we quote Glass Corner Wardrobes or any other corner configuration in the range.
Why corner wardrobes are specified differently from straight runs
A straight wardrobe can be adjusted at one end. A corner unit has to resolve two walls, an internal angle, and often a ceiling that is not perfectly level. The result is that three separate decisions get made at once: how the carcass wraps the angle, which door type can physically operate in the space available, and how the interior layout survives the dead zone every corner creates.
That is why our corner wardrobes are made to measure rather than supplied in fixed widths. Each unit is built around the dimensions, finish and layout confirmed for that project, so the return leg, the angle treatment and the door selection are decided together instead of being forced by a stock size.
The measurements we need from site
Send us dimensions taken after the floor and wall finishes are in place, or clearly mark which finishes are still to come. Where possible, provide photographs of the corner from both sides plus a simple sketch with dimensions written on it.
| Input | What to record | Why it changes the outcome |
|---|---|---|
| Overall envelope | Length of each wall return, floor to finished ceiling height, and available depth on both legs | Sets the carcass size and whether the unit can run full height without scribing |
| The angle itself | Whether the corner is square or out of plumb, measured at top, middle and bottom | Tells us how much scribing or a filler panel the installation needs |
| Obstructions | Skirting boards, architraves, switches, sockets, radiators, downlights, beams, bulkheads, pipework | These decide carcass set-backs and where vertical divisions can sit |
| Door clearance zone | Distance from the corner to the nearest wall, bed, or piece of furniture in the swing path | Determines whether hinged, sliding or open fronts are workable |
| Floor condition | Floor build-up and finished level, plus whether the base will be recessed or on plinths | Affects base detail and how the doors align once carpet or tile is laid |
| Access route | Lift size, stair width, corridor turns and door openings on site | Governs whether the unit arrives as one carcass or in assembled sections |
Project inputs that shape the specification
Dimensions fix the size; the rest of the brief fixes what is built inside the box. Before we produce a quotation, it helps to have these settled:
- Who uses it and what goes in it. Long hanging for coats and dresses, double rail heights, shelf depths for folded storage, drawer banks, or space for luggage all take different footprints in a corner.
- Room type and usage intensity. A principal bedroom, a guest room, a serviced apartment and a hotel room each justify a different amount of interior fitting and a different durability expectation.
- Door type. Corner openings suit hinged doors, sliding fronts or open shelving depending on clearance. Our corner range covers Hinged Door Corner Wardrobes, Sliding Door Corner Wardrobes, Open Corner Wardrobes, L Shaped Corner Wardrobes and U Shaped Corner Wardrobes, so the layout can follow the room rather than the reverse.
- Glass type and frame finish. Clear, frosted, smoked and ribbed glass fronts are available across our wardrobe collections, with aluminium frames in finishes such as black. See Clear Glass Wardrobes, Frosted Glass Wardrobes and Minimalist Black Frame Wardrobes for how the fronts read in a bedroom.
- Body material and finish. Veneer, lacquer, melamine, acrylic and solid wood bodies each behave differently against light and wear, and they need to match adjacent cabinetry. Tell us which finishes already exist in the project so we can match them rather than approximate them.
- Interface details. Where the wardrobe meets flooring, skirting, ceiling and adjoining joinery — including whether lighting is built into the carcass.
How the interior layout resolves the corner dead zone
The classic complaint about a corner wardrobe is that the angle becomes unusable. Three practical fixes, and each one has to be decided before production because it changes the carcass:
- Turn the angle into hanging. A rail set across the corner keeps the depth working and removes the need for a shelf that nobody reaches.
- Pull storage out to you. Drawer banks and pull-out units on the return leg keep contents accessible without crawling into the angle.
- Give the corner over to display or open shelving. In rooms where clearance is tight, an open corner section avoids door mechanics entirely and reads as part of the wall finish.
If your scheme mixes wardrobe types along one wall — glass fronts at the corner, closed doors on the legs — tell us early. Mixed fronts need consistent carcass heights and division positions to look like one run.
What we confirm before production
Once the inputs above are in, we return a specification for sign-off: dimensions as built, selected glass and frame finish, body material, interior layout drawing, and how the unit will be delivered and installed. Our Custom & OEM Service covers bespoke sizing, finishes and prototyping, and the wider Turnkey Solutions scope coordinates these built-ins alongside other furniture and building materials for villa, hospitality and office projects, including door-to-door logistics and on-site installation support.
Pre-enquiry checklist
- Both wall returns measured, plus finished ceiling height and available depth
- Angle checked at top, middle and bottom; out-of-plumb noted
- Obstruction list with positions marked on the sketch
- Clearance zone for the chosen door type confirmed against furniture layout
- Glass type, frame finish and body finish named, with adjacent finishes identified
- Interior layout brief: hanging heights, shelf depths, drawer count, lighting
- Access route to the room measured for delivery sizing
Send us the corner and we will return a specification
If you are sourcing built-in wardrobes as part of a wider fit-out, send the measurements and the brief above and we will come back with a made-to-measure proposal for the corner configuration that suits the room. Browse the full product range or contact our team with your drawings.
All dimensions, finishes and layouts shown for corner wardrobes are confirmed per project before manufacture. Please supply finished-level measurements so the specification matches the room as built.