A request for quote for high gloss lacquer cabinets often arrives with three lines: a room, a colour and a rough length of run. The supplier then has to guess the rest, and the price that comes back is only as reliable as those guesses. A useful RFQ removes the guessing. It states what is being made, where it is going, how it will be measured and what is already fixed by design, so the quotation you receive can be compared line for line with the next one.
Start with the project, not the door colour
Before any finish detail, give the buyer's context: the property type (apartment, villa, hotel guest room or serviced unit), the number of kitchens or units involved, and where the cabinetry will be installed. High gloss lacquer reads very differently in a single residential kitchen than across a repeated run of identical units, and repeat work changes how panels are batched, how colour consistency is managed between batches, and how spare panels can be ordered later.
State the delivery city and who receives the goods. A quote for cabinetry that stops at the factory gate and a quote that covers freight to site are not comparable figures, and installation responsibility should be named in the RFQ rather than settled after the order.
Send drawings with dimensions, not photographs
Photographs communicate taste; drawings communicate quantity. Attach at minimum a plan view of each kitchen, elevations of every run of cabinetry, and the positions of doors, windows, skirting, power outlets and any existing services that cannot move. Mark overall heights and depths, ceiling heights, and the finished floor level, because a gloss panel is unforgiving of an out-of-square wall and a base unit that clashes with skirting.
If your designer has already fixed the layout, say so and ask for the quote against those drawings only. If the layout is still open, ask the supplier to price two options so you are not comparing an internal corner carousel against a pull-out on the same money line.
Specify the carcass and the door separately
The lacquer finish is only the visible part. In the RFQ, split the specification into:
- Door and panel construction — the substrate and how the lacquer is applied to edges and profiles; a mitred or wrapped edge behaves differently from a squared edge under kitchen light.
- Carcass material and thickness — including back panels, and whether the carcass finish matches the door colour inside open niches.
- Hardware — hinge brand and type, drawer runners and their load rating, soft-close on which items, handles or a handleless profile.
- Worktop — material, thickness, edge detail, cut-outs for sink and hob, splashback return; or state clearly that the worktop is excluded.
- Appliances and services — appliance model list with dimensions, ventilation route, plumbing positions.
- Accessories priced as options — internal organizers, lighting in glass cabinets, plinths, trims, filler panels.
Ask for these as separate line items. When accessories and hardware are bundled into one number, the cheapest-looking quote is usually the one that hid the most.
Name the finish and how it will be confirmed
Colour names do not travel well between factories. In the RFQ, give a reference — a RAL or manufacturer code where one exists, or better, state that a physical sample is required before production. For high gloss, request a small lacquered board so you can judge reflection, orange-peel and how the surface reads under your own lighting. If the project also includes matching high gloss lacquer wardrobes or a matte finish in the utility area, say so in the same RFQ and ask how colour matching between finishes will be handled. Lacquer in a matte sheen and lacquer in a high gloss sheen are different products — matte lacquer cabinets in the "same" colour will not read as an identical panel — and that difference should be agreed on paper before order.
Ask what tolerance applies to colour variation between batches. For a multi-unit project this clause protects you when a later batch or replacement panel is needed.
State how measurement happens
Made-to-measure cabinetry only fits if someone takes responsibility for the numbers. Say in the RFQ whether site survey is done by your team, by a local contractor or by the supplier's people, and at what stage relative to plaster, tiling and flooring. If you are supplying your own dimensions, ask for a shop drawing to be returned for sign-off before manufacture — that drawing is the record of what was ordered.
Cover packaging, delivery and site conditions
Gloss panels are the finish most easily damaged in transit, so packaging method belongs in the RFQ: how doors are protected, how panels are braced in the crate or container, and whether a spare-door allowance is offered for transport damage. Then confirm the delivery terms — port or door, who clears customs, who carries the crates to floor, and the access conditions at site (lift size, stair width, parking restrictions). A quotation that assumes a goods lift on level five and a site with none is not the same price.
Ask the questions that reveal supplier behaviour
- What is excluded from this price? Ask for it as an explicit list.
- Which items are standard and which are costed extras?
- What happens if a panel arrives damaged or off-colour, and what is the replacement lead time?
- How are changes handled after shop-drawing sign-off, and what do they cost?
- Which payment stages apply, and what is tied to which milestone?
These answers tell you more about the order than the headline figure does. A supplier who lists exclusions clearly is quoting for a real job; one who does not is reserving the right to add cost later.
A short RFQ checklist
- Project type, unit count, installation location and delivery city
- Plans, elevations, ceiling heights, finished floor levels, services positions
- Door construction, carcass, hardware, worktop and appliance schedule
- Finish reference plus physical sample requirement before production
- Measurement responsibility and shop-drawing sign-off stage
- Packaging method, delivery terms, site access conditions
- Exclusions list, extras list, damage and replacement terms, payment stages
SANTERSON manufactures custom kitchen cabinets for residential and hotel projects, including made-to-measure sizing, material and finish options and layouts tailored to the project. Send drawings and the checklist above through our contact page and we will quote against what you have actually specified.