A kitchen layout that reads well on a drawing can still fail at the corner, because that is where run lengths change direction and where storage depth is hardest to reach. When we receive an enquiry for Pull Out Corner Cabinets, the enquiries that move fastest are the ones that already carry the information a factory needs to price and build: measured runs, door elevation, finish system and hardware expectation. This guide walks through what to put in front of us, in the order we use it.
Start with the corner geometry, not the mechanism
Pull-out corner units are made to measure for each project, so the numbers you send become the numbers we build. Before comparing carousel baskets against pull-out towers, record:
- Clear internal width and depth of both runs meeting at the corner, plus finished wall-to-wall dimensions.
- Front clearance: how far the door leaf swings or slides, and whether an appliance, island or walkway limits that travel.
- The return run length on each side, so we can confirm where the adjacent base unit starts and whether it must be scribed to an out-of-plumb wall.
- Floor finish build-up at the corner, which changes the height available for legs, plinth and drawer fronts.
Send a simple dimensioned sketch or the architect's cabinet elevation with these figures marked. A photograph of the existing corner is genuinely useful on renovation work, because it shows services, skirting and unevenness that drawings often miss.
State how the corner will be used
The same footprint can be specified three ways, and the use decides which one we quote. Tell us what lives in the corner:
- Pots and pans or small appliances that need a full-extension shelf pulled clear of the door opening.
- Dry goods and spices, where shallow trays and sightlines matter more than load rating.
- Bins, laundry baskets or recycling, where the pull-out needs a bin frame and ventilation to the plinth.
Our L Shaped Corner Cabinets and U Shaped Corner Cabinets cover the two common plan conditions, and where an open, accessible look is preferred we also supply Lazy Susan Corner Cabinets. Naming the use case lets us confirm whether a pull-out tower, a rotating tray or an open shelved corner is the honest answer, rather than quoting three variants you then have to arbitrate.
Specify the carcass, doors and finish as one system
A corner unit has to match the rest of the run in appearance and in movement. In the enquiry, group these choices together:
- Panel type and thickness for the carcass, and whether the visible end panels are to be finished on both faces.
- Door style from the wider Custom Built-in Kitchen Cabinets programme, so the corner front aligns with handleless, shaker or slab fronts elsewhere in the kitchen.
- Surface finish and colour reference. Send a RAL, NCS or paint code, or a sample of the existing door; a name alone such as "matte grey" is not reproducible between factories.
- Edge treatment on high-wear pull-out fronts, where the edge detail is touched daily.
Where the corner sits in a hotel or apartment scheme rather than a private villa, say so. Repeat-unit projects let us standardise one corner detail and apply it across several kitchens, which keeps tolerances consistent and simplifies site installation.
Name the hardware expectation
Hardware is where an enquiry becomes a quotation. Matching components are available on request, so we can supply or accept your preferred system:
- Hinges, drawer slide rails, support legs and connecting brackets for the corner carcass.
- Pull-out runners rated for the intended load, with the expected number of cycles if the kitchen is a rental or staff kitchen.
- Soft-close on fronts and drawers, and whether the door is to be handleless with an integrated profile or fitted with a specified handle.
- Integrated lighting inside the corner, if items stored deep in the run need to be seen.
If your detail drawings already name a hardware brand and model, include that reference. If not, tell us the load you expect and we will propose runners that suit it.
Add the project context we need to quote correctly
The commercial details change production planning as much as the technical ones. Please include:
- Quantity: one corner, or a set of identical corners across apartments, villas or guest rooms.
- Project location and delivery address, so packing and freight can be arranged door to door alongside the order.
- Whether the cabinetry travels with other SANTERSON scope on the same project, such as wardrobes, vanities or joinery, which allows consolidated packing and one coordination contact.
- Your preferred sequence: sample or first-article unit for approval before the balance is produced, which we recommend for any finish that has not been made for you before.
What happens after you send it
Enquiries follow the same route as our other custom work: a brief and design proposal, then quotation and detail confirmation, then production, shipment and follow-up. For cabinetry this means we return shop drawings of the corner unit showing dimensions, door elevation, runner positions and finish call-outs for your sign-off before cutting begins. Anything ambiguous is raised at that stage rather than discovered on site.
Dimensions, finishes and hardware configurations are confirmed per project before production; specifications shown on product pages describe available options rather than fixed standard sizes.