A model code on a purchase order is not a specification. When an Outdoor Swim Spa WS-PC06CH arrives on site, the difference between a smooth handover and an expensive retrofit usually comes down to what the procurement file already recorded: shell footprint, equipment list, power and water connections, access route, and the responsibilities of each party on site. The checklist below follows the order in which those decisions actually have to be made.
1. Product identification before anything else
Record the exact model designation as it appears on the catalogue page, together with the product URL and the image reference used for approval. For this unit the catalogue lists a shell of 6000 × 3000 × 900 mm. Treat that figure as the starting point for setting-out drawings, not as the finished installation dimension: coping, steps, plant access and insulation all sit outside the shell envelope. The same discipline applies across a Swimming Pools and Swim Spas schedule, where several model codes may sit on one drawing sheet.
- Model code, catalogue link and approved image reference
- Catalogue shell dimensions and the assumed water level
- Whether the unit is above ground, semi-recessed or fully recessed in your design
- Which revision of the drawing each party signed off, with a date
2. The equipment schedule: what is included and what is optional
The site lists this model with water jets, LED lighting and ozone. Its specification block records one control system, two water pumps, one filter pump, 38 jets in total, one LED light and a total power figure of 3.25 kW. Catalogue-listed options include control systems, UV sterilisation, water pumps, heat pumps, sand filtration, insulation and steps — availability and compatibility vary by model.
That last sentence is the one procurement teams most often skip. Two quotations carrying the same model code can differ by a heat pump, an automatic cover or a different filter arrangement, and the price gap looks like a saving until someone discovers the missing item during commissioning. Write the schedule as a line-by-line list of included items, options selected, and options deliberately excluded, then ask each supplier to confirm against that same list.
| Item recorded in the file | What the file must say about it |
| Jets (38 pcs) | Seat and jet layout as approved, and whether jet types differ between zones |
| Water pumps 2 pcs / filter pump 1 pc | Flow duty, runtime schedule and who provides the electrical circuit for each |
| Total power 3.25 kW | Supply voltage, phase, dedicated circuit, isolation location and who supplies the connection |
| Ozone / optional UV sterilisation | Dosing arrangement, consumable replacement responsibility |
| Insulation, steps, heat pump (options) | Selected or excluded, in writing, on the purchase order |
3. Site conditions that decide whether the unit can be installed at all
Swim spa failures on site are rarely product failures; they are foundation, access and services problems discovered too late. Document these before the order is placed:
- Slab and loading. Recorded shell size plus wet weight, confirmed against a structural engineer's note on the slab or pedestal arrangement actually being built.
- Drainage and overflow. Where discharge goes, who provides the drain, and how the pit is accessed for maintenance.
- Power. The 3.25 kW figure tells you the load class; your electrician still needs the voltage, phase and cable schedule confirmed before first fix.
- Access route. Crane or manual carry from the delivery point to the final position, including gate widths and overhead obstruction.
- Plant room or equipment niche. Clearance for the filter pump and control system, with access that does not require draining the spa.
4. Where a configurable unit sits in a wider outdoor package
A swim spa is rarely ordered alone. On villa and resort packages it arrives alongside loungers, shade structures and poolside seating, and the finish of the deck, the pergola footing and the furniture layout all have to agree with the spa envelope. Coordinating those items through one supplier removes a whole category of interface disputes between trades, since the same team is drawing the deck edge, the equipment niche and the seating layout.
Where the project needs a different footprint or an unusual shape, that is a specification conversation rather than a substitution. Our Customizable Shape Outdoor Spa - Personalized Hydrotherapy Pool work covers exactly this: shell geometry adjusted to the terrace, with the equipment list re-confirmed against the new form.
5. Commercial and after-handover terms to capture in writing
- Delivery term and named delivery point — not "site", but the exact location and the access assumption behind it
- Packaging and container loading plan, with customs paperwork listed: commercial invoice, packing list, certificate of origin
- Inspection and snag list at handover, signed by the party receiving the unit
- Warranty scope and exclusions in writing, plus the spare-parts items most likely to be needed in years two and three
- A named contact for commissioning support and a defined escalation route
Our own service pages describe this path as consultation, design and planning, production, logistics, installation and after-sales, which is why we ask project teams to send the equipment schedule and the site drawings together rather than in sequence.
Send us the file, not just the model number
If your pack contains the shell setting-out, the included-versus-optional list, the electrical and drainage assumptions, and the access route, we can price and build it as specified. If it contains only "WS-PC06CH", expect a quotation that has to be re-worked.
Send drawings and the equipment schedule to our project team and we will confirm what is included in your configuration, what needs a site-side supply, and what should be ordered as an option while the shell is still in production.