Stone and marble rarely cause trouble at the specification stage. The trouble arrives in the gap between what a drawing shows and what reaches the site: a dimension nobody measured, a finish named only as "grey", an edge detail left to whoever turns up with tools. If your team is sourcing Santerson Stone & Marble Surfaces for bathroom counter runs, vanity tops or wet areas, the record you build before the order goes in decides whether the delivery fits. Here is the documentation set we ask buyers to prepare, and what each line prevents.
Say which collection the material belongs to
Stone and marble appear in three places in our catalogue, and they are not interchangeable. Santerson Stone & Marble Surfaces sits in Countertops & Basins for bathroom projects. Santerson Stone & Marble Panels belongs to Paneling Systems for wall applications. Stone & Marble Panels sits under Custom Partitions & Paneling, where the surface is part of a built-in assembly. Different build-up, different edge treatment, different fixing.
On your schedule, each line should carry the collection name and the product URL alongside the room and elevation it applies to. "Stone, master bathroom" tells the factory nothing about whether you need a worktop carrying a basin or a clad wall behind one.
Record dimensions as measured on site
These surfaces are supplied made-to-measure, with sizing, layout and finish confirmed per project. That flexibility only works if the measurement record is accurate. For every piece, write down:
- Overall length and depth, and the finished thickness you expect.
- Where the piece terminates — wall to wall, into a reveal, or butting an adjacent cabinet run.
- Every cut-out: basin type and its position, tapware holes, soap dispenser, overflow.
- Whether returns, splashbacks and upstands are in the same order or left to another trade.
- The site tolerance, and who verifies the measurement before fabrication starts.
If a wall is out of square, put that in writing. A drawing that assumes 90° corners produces a rectangular top that will not sit down on a real bathroom wall.
Name the finish and the edge, with a dated sample reference
Material and finish are configurable, so the specification has to be equally specific. State the finish family, the surface texture, the edge profile and the corner treatment, then attach a photographed or physical sample reference with the date it was approved on. A slab that reads warm grey under showroom lighting can read green in front of a bathroom mirror.
Also state what the stone meets. An Integrated Countertop Vanity, a Double Basin Countertop and an Undermount Basin each change how the surface joins the fixture, and that junction belongs on a drawing rather than being settled by whoever installs it.
Keep one schedule for everything in the same wet room
Stone surfaces seldom arrive alone. The Bathroom Fixtures for Hotel Projects range covers basins, toilets and shower sets, and the same bathroom usually adds a vanity, a mirror cabinet and Vanity Lighting. When each of those is ordered from its own spreadsheet at its own revision date, the site ends up with a counter measured before the basin was changed.
Use one document per bathroom or per floor: fixture model, surface reference, cabinet run, dimension set, revision number and revision date. Under Turnkey Interior Project Solutions, that single schedule is what keeps design, production and site coordination reading the same numbers.
Write down who confirms what, and when
Our cooperation steps run from project brief and design proposal, through quotation and detail confirmation, to production, shipment and follow-up. The detail confirmation stage is where your documented dimensions and finish references become binding, so record the date each item was signed off and the name of the person who signed it off.
Three practical lines get missed often enough to be worth their own heading:
- How pieces are packed and lifted, particularly for upper floors or narrow stairwells.
- Which party prepares the substrate, and by what date it must be ready.
- What happens if a piece is damaged in transit: photograph, part number, replacement route.
Our Logistics & Door-to-Door Delivery service handles freight documentation and container loading, but import terms, duties and delivery scope for a particular Australian site are agreed case by case rather than assumed.
The checklist before the order goes in
- Collection name and product URL on every line.
- Site-verified dimensions, with tolerance and the person responsible.
- Finish, texture and edge profile with a dated sample reference.
- Cut-out drawing covering basin, tapware and overflow.
- One shared schedule across surfaces, fixtures and cabinetry.
- Confirmation dates and names against each item.
None of this is paperwork for its own sake. Each line replaces a phone call that would otherwise happen after fabrication has begun, when changes cost far more. Send your schedule to us through the contact page and we will mark up anything missing before production starts.
Dimensions, material options, edge profiles and installation requirements vary by configuration and must be confirmed for each project before order confirmation.