A request for quote for high gloss lacquer wardrobes usually comes back with one number and very little else. That is workable when the wardrobe is a standard box in a standard alcove. It stops being workable the moment the joinery is made to measure, because then the price depends on decisions nobody wrote down: which wall is the reference plane, what the ceiling finish is, how the doors hang, what sits inside the carcass, and how the units travel to site. Below is the checklist we use when a buyer sends an enquiry for high gloss lacquer wardrobes, and what each item changes in the quotation.

Start with the room, not the wardrobe

Send dimensions taken from the actual shell, not from a drawing that has not been checked on site. For each wall the wardrobe runs along, give the length, the height at more than one point (floor to ceiling rarely stays constant), and the depth available once skirting, architraves, door reveals and any pipework are accounted for. Note the finish levels: what the floor covering is and whether it is already laid, what the ceiling is, and whether the wall is plasterboard, masonry or a framed partition.

This matters more for a glossy front than for a matt one. A high gloss surface reflects the room back at the viewer, so an out-of-plumb wall, a crooked ceiling junction or an uneven floor line becomes visible in the reflection long before it is obvious on a textured finish. Tell us whether the carcass should be scribed and packed to the wall, or whether the wall has been lined and squared for a flush fit. That single sentence changes both the manufacturing tolerance and the installation time.

State the door type and the opening clearance

Say which operation you want: hinged, sliding, or an open walk-in arrangement with no doors at all. For sliding doors, give the clear width and depth needed for the track and the overlapping panels; a sliding run needs room that a hinged run does not, and it cannot be recovered after the carcass is built. For hinged doors, say which way the door swings and whether anything nearby — a bed, a nightstand, a vanity, a room door — sits in the swing arc.

Where the wardrobe shares a wall with a bathroom or faces a window, mention it. If you would rather see through the front than a solid panel, the equivalent options in the same collection are Glass & Lacquer Combination Wardrobes, and a softer sheen is available as Matte Lacquer Wardrobes where glare from windows or downlights is the concern.

Specify the finish, and say what it is being matched to

"High gloss" is not a specification. Give the colour — an RAL reference, a paint code from the designer's schedule, or a physical sample in the post — and say whether the same colour continues onto the interior of the doors, the carcass edges and any open shelves. Then tell us what else in the project has to match it. In a villa or apartment fit-out, lacquer wardrobe fronts usually have to sit alongside high gloss lacquer kitchen cabinets, and the two are painted in different batches unless the order is placed together. A single colour code across both trades, quoted at the same time, is what keeps a bedroom and an open-plan kitchen reading as one scheme.

Also state the sheen expectation in plain words: mirror-bright, or a bright finish that still shows some depth. Gloss levels are confirmed on a sample before production, so ask for the sample stage to be included in the quote rather than assumed.

List the interior layout room by room

Give us the hanging pattern: long hanging for coats and dresses, double hanging for shirts and folded stacks, shelf heights, drawer counts, and whether you want shallow jewellery or watch drawers. Note the items that set the dimensions — a suitcase, a vacuum, an ironing board, a safe, a trouser pull, a full-length mirror on the door — because each of those fixes a minimum internal size. If one bedroom is a walk-in and another is a sliding two-door, send them as separate schedules rather than one averaged specification.

Hardware belongs in the same list. Say who supplies the hinges, slides, handles and any integrated lighting, and whether you have a preferred brand or a project-standard ironmongery schedule. If hardware is on your side, we need to know before pricing, because the door thickness and the fixing detail are set around it.

Say who measures and who installs

Tell us whether you want made-to-measure sizing from drawings alone, or a site survey before the order is released. Drawings-only works when the shell is complete and dimensional tolerances are known; it carries risk when flooring, plastering or electrical first-fix are still open. Then say who fits the units on site: your own crew, our installers, or a local contractor working from our assembly drawings. This determines whether the quote includes fixing packs, scribing material, and an installation team.

Cover delivery and packaging

Give the delivery address, the port of entry if it differs, and the practical constraints at the building: lift dimensions, stair widths, corridor turns, crane or hoist access, and whether there is a loading window. Tall high gloss panels are bulky and easily chipped at the edges, so packaging method and container loading plan are part of the price, not an afterthought. State your Incoterms expectation — FOB, CIF or door-to-door — and whether you handle customs clearance yourself or want us to arrange it.

If the project is in Australia, tell us the state and the building type, since villa work in Sydney and a multi-unit job in Melbourne have different site logistics. Our published cases include villa projects in Willoughby, Perth, North Turramurra, Melbourne and Sydney, so we are used to coordinating joinery around Australian site programmes.

Give the programme and the quantities

State how many wardrobes, how many rooms, and whether the order is one release or staged across phases. Give the on-site start date you are working to and the latest date the joinery can arrive. Production slots are booked in sequence, so a phased schedule is worth stating up front instead of being discovered when units are already made.

What we need back from you

In short: dimensioned plans and elevations for each wardrobe; wall, floor and ceiling build-up; door operation with clearances; colour and sheen reference plus anything it must match; the interior schedule and hardware responsibility; who surveys and who installs; delivery address with access constraints and Incoterms; quantities and dates. With those in place a quotation can carry real numbers instead of allowances, and the order can move straight to sample approval and production.