A media wall rarely goes wrong at the design stage. It goes wrong in the handover between design and production, when the drawing says "feature wall with TV recess" and nobody has written down what that actually means: which panel system, which finish, where the screen sits, how deep the recess is, who supplies the power and signal points, and how the unit reaches the site. Santerson Integrated Media Storage is a made-to-measure item inside our Integrated Storage Walls collection, so layout, dimensions, material and finish are set by the project instead of picked from a fixed catalogue. That flexibility is exactly why the product specification has to be written properly before production starts. Below are the six fields we ask buyers, contractors and designers to complete for this line.

1. Room, wall and the exact envelope

Start with the wall, not the furniture. Record the room and how the wall is used: a villa family room, a guest-room entertainment wall in a small hotel, or a lounge where the screen sits secondary to storage. Then give us the wall envelope — overall width and height, ceiling height along the run, and any obstruction that changes the build, such as a skirting line, a structural column, an existing power board, or a window head close to the corner.

For built-in work, finished dimensions matter more than architectural ones. Send the measurement taken after the floor and wall finishes are complete, or state clearly which side of the finish each number sits on. Where the storage wall meets another material — plasterboard, stone, timber panelling — note the junction you expect, because that detail decides whether we build a shadow gap, a trim, or a flush abatement.

2. Layout: what stays open, what closes away

Integrated media storage works when the split between display and concealment matches how the room is actually used. Tell us which items stay visible — books, ceramics, a decanter — and which need to disappear behind doors. Projects that want both usually pair this product with Santerson Mixed Open & Closed Storage, so the open shelves and closed cabinets read as one system rather than two separate pieces of joinery.

A plain written layout saves rounds of revision. Describe the wall in zones from left to right, and for each zone state whether it is an open shelf, a closed cabinet, a drawer bank or a niche. Give the shelf spacing you need where it matters: a console, a soundbar, a record player and a stack of board games all want different heights. If you would rather we propose the zoning, say so and send the list of items to be housed.

Where the wall has to change appearance between uses, Santerson Sliding Storage Panels can close off part of the run. If that is the intent, specify the overlap, the track direction and what sits behind each panel, since panel travel needs clear space at both head and floor.

3. Screen, hardware and services

This is the field most often left blank. For every screen in the wall, state the model or at least the size, and whether it is surface-mounted or recessed into a panel. Then give the mounting detail: bracket type, finished depth behind the face of the panel, and how the screen is reached for cabling once installed.

Next, list the services — power outlets, data points, aerial or HDMI runs, and any device that has to stay reachable, such as a set-top box, a streamer or a turntable amplifier. State who installs those services and at what stage, because panel cut-outs are made in production to the coordinates you approve, not adjusted on site. If electrical details are still open when you order, hold the production release until they are confirmed; "power TBD" is the most common cause of a re-made panel.

Lighting inside the wall belongs in the same document rather than arriving as an add-on. Integrated lighting needs driver positions and switching decided before the carcass is built, so send the intended lighting layout together with the joinery drawings for review.

4. Material and finish

Our custom and OEM service covers bespoke finishes, textures and materials — timber, veneers, laminates, metals and engineered stone — so the specification should name each surface by product reference wherever possible, not by a colour adjective. "Oak" is ambiguous; a board reference plus a sheen level is not.

For each element record the carcass material, door and panel material, edge treatment, handle or handleless detail, and the sheen. Then confirm which elements must match other joinery in the same project — kitchen cabinetry, wardrobes, doors — and send that reference so grain direction and tone are approved as a set. If a physical sample is needed before production, request it at quotation stage; approving a finish from a screen image is where colour disputes begin.

5. Hardware, access and after-sales

Specify the hardware you expect: soft-close hinges and runners, the load a drawer has to carry, push-to-open or profile handles, and any child-resistant requirement for a wall carrying a heavy screen above head height. State how equipment is serviced after handover — which doors open, which panels lift, and whether access to the rear of the recess must be maintained.

For hospitality work, add the maintenance assumption: how often the unit is cleaned, who replaces lamps, and what happens if a component needs swapping years down the line. Spare-parts support sits within our after-sales scope, but parts are matched to the approved specification, so a clear written record protects the buyer as much as it protects us.

6. Delivery, site access and installation

A media wall is usually one of the largest items entering a finished room, so site access belongs in the specification. Give us the delivery address, the floor, lift dimensions or stair constraints, whether the unit must pass through a doorway intact, and the maximum module size that access allows. Where access is tight, we build in sections and assemble on site.

Then confirm who installs. Our scope can include on-site installation with inspection and snagging before handover, or the units can arrive for your own contractor to fix. Either works, but the specification has to say which one, because it changes how the wall is packed, labelled and detailed at the junctions.

A specification checklist you can copy into your own document

  • Room and wall use, plus the finished wall envelope with obstructions noted.
  • Zoning left to right: open shelf, closed cabinet, drawer bank, niche.
  • Item list with the shelf height each device needs.
  • Screen model or size, mounting method, recess depth, and access for cabling.
  • Power, data and signal points with coordinates, and the trade responsible for each.
  • Integrated lighting layout, driver position and switching.
  • Carcass, door and panel materials by reference, with sheen and edge detail.
  • Joinery to be matched elsewhere in the project, with references.
  • Hardware schedule: hinges, runners, handles, safety requirements.
  • Delivery access route, maximum module size, and who installs.

How the wall fits a wider package

Media walls are rarely ordered on their own. When the same project also needs wardrobes, kitchen cabinetry, doors or a bathroom fit-out, specify all of the built-in work against one finish schedule and one set of site dimensions, so tone and detailing carry through the whole floor. That is how turnkey villa furnishing packages are normally assembled: one coordination point across production, delivery and installation instead of several unrelated suppliers. If you want to see the range first, start from built-in furniture and send us the drawings — we will come back with questions on anything the drawing leaves open.

Send what you have, even if it is a sketch with dimensions on it. A specification that is incomplete but honest about its gaps moves faster than a tidy drawing built on assumptions nobody wrote down.