Textured melamine cabinet fronts read as wood, stone or soft matte lacquer at close range, and they hold up well in daily use. That is exactly why they are easy to get wrong: the texture, the panel underneath it and the way the door is machined all have to be agreed before the first sheet is cut. Below is what we ask project owners, builders and designers to lock down with us at SANTERSON before production of custom textured melamine cabinets begins.
1. The texture sample, not the finish name
"Textured" covers a wide field. A fine wood-grain emboss, a shallow cross-sheen surface and a deep matte structure all behave differently under kitchen lighting and under a hand. Names travel badly between factories, so we work from a physical sample instead: you approve the actual panel, and that approved panel becomes the reference for every batch.
Two details decide how convincing a textured front looks once installed. The first is whether the grain follows the length of the door or runs across it — worth stating on the drawing, because mixed-direction fronts are visible immediately in a run of tall cabinets. The second is edge treatment: the same decorative surface must be carried onto the edges, and the joint line where edge meets face should be tight and consistent. Tell us which edges will be seen in the finished kitchen, so we machine those faces accordingly.
If your scheme also uses wardrobe fronts, order the cabinet and textured melamine wardrobes samples from the same batch. Matching panels produced months apart for different rooms is a common source of visible tonal difference.
2. The panel behind the surface, and where it will be used
Melamine is a decorative surface; the board carrying it determines how the cabinet performs. For ordinary dry kitchen and bedroom joinery this choice is straightforward. For areas with splashing water, wet rooms, laundry zones or unsealed external walls, the core board and the edge sealing need to be specified deliberately, because swelling always starts at an unsealed edge rather than at the face.
So before production we confirm the location of every unit: base cabinets next to the sink, tall units against a wet wall, pantry storage in a dry corridor. That single list drives which board goes where, how edges are sealed, and whether an alternative material is more suitable for one or two runs. It costs nothing at drawing stage and prevents a replacement order later.
3. Sizes, tolerances and site conditions
Our melamine kitchen cabinets are made to measure rather than offered in fixed modular widths, which means the numbers you send become the numbers we cut. Before production we check them against the finished floor level, the finished wall face, and any services that will be fixed after the cabinets arrive.
- Which walls are tiled or plastered to what thickness, and where the tiling line falls relative to the carcass.
- Floor finish height at the point of installation, not at the time of measuring.
- Appliance models and their dimensions, including integrated ovens, dishwashers and refrigeration.
- Countertop thickness and its edge profile, because that determines the scribe and worktop detail.
- Sweep and level of the walls, so we decide between scribing on site or packing in the factory.
Where a wall is out of true, we agree in advance whether the gap is closed with a scribed filler or a shadow reveal. Both are legitimate details — but only if they are drawn before the carcass is built.
4. Layout, openings and hardware
Handleless fronts, soft-close hinges, drawer runners, internal organisers and integrated lighting all change the required clearances. A handleless profile needs a consistent reveal at every adjacent front; a tall larder with deep drawers needs its runners fixed to a specific load rating; an angled corner unit needs its mechanism chosen before the panels are cut.
We therefore confirm door handing, hinge type and opening angle, drawer runner series and load, the internal fit-out of each unit, and whether touch-to-open or handle profiles apply. For a run that will be used daily by a family or by hotel guests, this is where longevity is decided — the surface gets the attention, but the fittings get the wear.
5. Colour, batch and lighting
Textured surfaces shift in appearance with light direction. Before approval we look at the sample both in daylight and under the actual luminaire temperature specified for the room, alongside the countertop, splashback and flooring samples. A warm-toned wood grain that reads neutral on a bench sheet can pull orange under 2700 K downlights.
Once approved, we produce the fronts for one dwelling or one floor of guest rooms from the same board batch, and we record the approved reference so later phases of the same project can be matched. If your programme splits delivery across phases, tell us at the start — batching a large order and storing part of it is usually safer than re-ordering decorative panels months later.
6. Packaging, sequence and site access
Textured fronts mark if they are dragged across each other, so doors and panels are packed flat or upright with protection between faces, labelled by room and elevation rather than by pallet convenience. For apartments and villas with limited access, we confirm lift dimensions, stair widths and the delivery window before the container is loaded.
As part of our custom furniture design and prototyping and door-to-door service, we can arrange freight, customs paperwork and delivery to site, then follow up on installation and any replacement panels. Our scope covers design coordination, production, logistics and after-sales support under one order.
7. What you receive for approval before cutting
Before we schedule production, the following should be signed off rather than assumed:
- Approved physical texture and colour sample, referenced by batch.
- Dimensioned elevations with finished levels and services marked.
- Board specification per location, with edge sealing stated.
- Hardware schedule: hinges, runners, handle profile or touch-to-open.
- Internal fit-out list for each unit.
- Packing, labelling and delivery sequence agreed with the site programme.
Send us your drawings and we will mark what is missing
If you already have a kitchen layout, send it over — even at sketch stage. We will mark the points that are still open, quote against the confirmed specification, and flag where a different board or finish would serve better in a wet zone. For villa renovations and hotel fit-outs, we also supply the surrounding joinery from the same production run, including custom minimalist kitchen cabinets, wardrobes and built-in storage, so the whole scheme shares one set of details.
Contact SANTERSON with your drawings, room locations and target site date, and we will return a specification sheet listing every item above for your sign-off before production starts.