A request for quote is where a ballroom carpet project either gets a comparable, buildable price or turns into weeks of email ping-pong. Patterned purple and gold carpet for a wedding venue or hotel ballroom is not a catalogue item you can order off the shelf: the pattern repeat has to work at the room's scale, the colourway has to match the drapery and wall finishes, and the fibre has to survive banquet traffic plus daily machine cleaning. The checklist below covers what to put in your RFQ so that a manufacturer such as SANTERSON can quote it once, correctly, and produce it without re-work.

Rule of thumb: if your RFQ lets two factories quote the same room and land close together on price, your specification is complete. If their quotes differ wildly, something in the brief is missing — usually pile density, seam layout or the delivery terms.

1. The room itself: dimensions, layout and access

Send a scaled floor plan, not a rough area figure. Wall-to-wall ballroom carpet is cut and seamed to the room, so we need:

  • The full length and width of the ballroom or banquet hall, plus any alcoves, stage recesses, service niches and fixed podiums.
  • Column positions and diameters if the floor is interrupted.
  • Ceiling height and whether the carpet runs up a skirting or stops short with a metal transition strip.
  • Door widths, lift sizes and freight-lift dimensions at the venue — this decides whether rolls arrive in one piece or have to be cut into sections on site.
  • Whether the floor is concrete slab, raised access floor or existing carpet to be removed. If a substrate moisture test has been carried out, attach the readings; if not, say so and we will include a pre-installation check in the plan.

Tell us the installation sequence too. Ballrooms are usually the last trade in, and a carpet laid before the drapery or AV contractors arrive will be damaged. If your programme has a fixed opening date or wedding season start, say so at RFQ stage; it changes how we schedule tufting, dyeing and finishing.

2. The pattern: repeat size, colour references and the artwork you actually hold

This is where most custom carpet quotes go wrong. State clearly:

  • Whether you want our existing purple and gold design — as shown on the Custom Purple Gold Patterned Carpet for Wedding & Hotel Ballroom page — or your own motif adapted to it.
  • The repeat you expect. A medallion that reads well in a small suite can disappear in a large ballroom, so we scale the repeat to the room before tufting.
  • Colour references in a format we can match: Pantone codes, physical yarn samples posted to us, or a printed swatch. Screen-viewed colours are never sufficient on their own for a gold-and-purple palette, because metallic-looking golds shift under warm ballroom lighting.
  • The number of colourways in the design. Each additional colour changes the dyeing plan and the price.
  • Where the pattern is centred: on the main entrance axis, on the stage, or on the dance floor. This decides the seam layout and how much material is wasted at the perimeter.

If you only have a mood image from a designer's board, send it anyway and say so. We will produce a scaled digital visual of the pattern in your room before any yarn is dyed, and that step belongs in the quotation, not after it.

3. Fibre, pile and backing: what to specify and what to leave open

You do not need to be a textile engineer, but you do need to state the performance demand. In our Customizable Commercial Carpet for Hotel, Banquet Hall & Villa Projects programme we make wall-to-wall carpet to your specified size, colour, pattern and fibre blend, and the two things you should pin down in writing are:

  • Fibre family. Wool blends handle crushing and recover well under heavy banquet traffic; solution-dyed nylon holds colour through repeated extraction cleaning; polyester keeps a rich purple tone at a lower cost. Tell us your priority — appearance retention, stain behaviour, budget per square metre — and we will recommend the blend rather than let you guess.
  • Pile height and density. A cut pile in the 8–12 mm range is common for ballrooms: soft underfoot, but dense enough that chair legs do not leave permanent tracks. Specify total pile weight per square metre if your specifier has a figure; otherwise state the traffic level and cleaning regime and we will propose both.
  • Backing and edge finish. State whether you need carpet tiles, broadloom rolls or bound edges for a loose-laid stage inset.

What you should not expect from any RFQ response is an unqualified performance promise. Ask the factory to state the tested values they can evidence for your chosen construction, and ask which of those are available for the exact blend you select — not for the range in general.

4. Quantities, sampling and the trial order

Give quantities in three parts:

ItemWhat to write in the RFQ
Main areaSquare metres of the ballroom floor, plus a separate figure for ancillary areas — foyer, bridal suite, corridor — if they are on the same order.
Waste allowanceEither ask us to calculate it from your plan, or state your own allowance and who carries the risk of over- or under-order.
Spare rollsBallrooms get spot-replaced for years. Order a spare quantity in the same dye lot at the time of production; matching purple and gold dye batches after the fact is difficult.

We supply samples before production on custom carpet work, and flexible minimum order quantities are available for trial orders. In your RFQ, say how many sample tiles you need, which colourway each should show, and where they must be delivered. A physical sample of the actual tufted construction tells you far more about the purple tone under warm lighting than any printed visual.

5. Commercial terms: what a comparable quote needs

Price per square metre on its own is not comparable across suppliers. Your RFQ should ask for the price broken into:

  • Unit price per square metre, by construction, with the currency and validity period stated.
  • One-off charges: pattern adaptation, sampling, mould or backing tooling if any.
  • Packaging and container loading — how the rolls are packed matters for a patterned carpet that must not crease.
  • The Incoterm. If you want freight handled, ask us for it directly; SANTERSON arranges sea, air and rail forwarding with customs paperwork and door-to-door delivery, so state your destination port or site address and let us quote both ex-factory and delivered.
  • Payment milestones tied to sample approval before bulk production starts. Never release bulk production without a signed-off physical sample.
  • Warranty scope, spare-parts support and the installation and after-sales arrangements for your country — including whether installers travel to site or work under your local contractor's supervision.

For Australian venues, add the practical items: destination city, storage availability at the site before installation, and who handles import clearance. We supply villa and hospitality projects in Australia — published case pages include villas in Sydney, Melbourne, Perth, Willoughby and North Turramurra — but any statement about local compliance, duties or transit days should be confirmed for your specific consignment rather than assumed from marketing copy.

6. Related product families worth pricing in the same RFQ

Ballroom carpet rarely sits alone. If your project also needs adjacent finishes, put them on one order so colours and delivery dates are coordinated by a single one-stop furniture and building materials supplier:

7. A copy-paste RFQ template

SectionFill in
ProjectVenue name, city, room name, opening or event date.
AreaFloor plan (PDF or DWG), overall length and width, columns, stage recesses, ancillary areas in square metres.
DesignPurple & gold pattern reference or your artwork, expected repeat size, centre axis, number of colourways, Pantone codes or posted yarn samples.
ConstructionFibre priority (wool blend / nylon / polyester), pile height and density target, broadloom or tiles, edge finish.
Cleaning & trafficDaily vacuuming regime, extraction frequency, expected event load per week.
QuantitiesMain area in square metres, spare-roll quantity in the same dye lot, sample tile count and delivery address.
CommercialsCurrency, Incoterm and destination port or site address, payment milestones, quote validity required.
AftercareWarranty scope wanted, spare-parts needs, installation method (our team on site or supervision of local labour).

Frequently asked questions

Can I request a physical sample before committing to the full ballroom?

Yes. Samples are produced before bulk production, and they should show the actual tufted construction in your chosen colourway. Approve and sign the sample, then release production.

Is there a minimum order for a single ballroom?

Minimum order quantities are flexible and trial orders are accepted. State your area in square metres in the RFQ and we will confirm what applies to your construction and pattern.

Can you match a purple or gold colour from a fabric swatch in my design folder?

Yes, if we receive the physical swatch or a Pantone reference. Screen images are not reliable for metallic-looking golds under warm ballroom lighting, so a physical reference is what makes the match reproducible across dye lots.

Who installs the carpet?

Tell us in the RFQ whether you want installation support at site or supervision of your local flooring contractor. Installation, snag inspection and after-sales arrangements are part of the service scope, and the exact arrangement for your country should be confirmed in writing before order.

Send the plan, the pattern reference, the performance demand and the commercial terms in one message, and a custom purple gold ballroom carpet moves from enquiry to approved sample to production without the usual rounds of clarification. The purple and gold wedding ballroom carpet page lists the base design; everything else — size, colour, fibre blend and delivery — is built to your project.