A bidet is one of the smallest fixtures in a guest bathroom and one of the easiest to get wrong. It rarely appears on the finish schedule until late in the tender, nobody confirms the outlet type, and the sample that finally arrives sits three centimetres from the wrong wall. If you are specifying sanitary ware for villas, serviced apartments or hotel guest rooms, the brief you send to the factory decides whether the fixture lands cleanly on site or turns into a snag list item.

This note walks through what to put in that brief, using our floor standing bidet 1038F, a ceramic bidet basin for bathroom hygiene, as the working example. The same checklist applies whether you are ordering a handful of pieces for one house or a repeated layout across a hospitality floor.

Start with the installation condition, not the styling reference

Most specification enquiries open with a photograph of a bathroom and a colour. That is the wrong place to begin. The first thing a manufacturer needs is the waste condition behind the wall or in the slab, because it determines which body style can physically be installed.

The 1038F is a freestanding unit fixed to the wall through its back support, so it reads as a floor-standing piece while the water and waste connections sit behind it. Before any drawing is exchanged, send us three things: whether the waste is a floor outlet or a wall outlet; the rough-in distance measured from the finished wall face to the centre of that outlet; and the position of the hot and cold inlets relative to the same finished face.

Finished face matters. A dimension taken off a structural wall before plasterboard changes every number that follows. Send those measurements as a simple sketch with three dimensions marked on it, not as a sentence buried in an email body. Where the trap arrangement or rough-in is still open because the drainage design has not been frozen, say so plainly. We would rather quote two configurations at the enquiry stage than replace a container of fixtures after the fit-out contractor has set them.

Decide whether you are buying a fixture or a suite

A bidet ordered on its own tends to look out of place, because the bowl radius, seating height and glaze tone rarely match a toilet from a different catalogue. The 1038F is designed to pair with the matching WC of the same series, so the rim profile, the underside shaping and the glaze line up when both fixtures leave the same production run.

In our bathroom sanitary fixtures range, the two-piece washdown toilet 1038A is the companion WC for this series, and it supports both a wall outlet and a floor outlet arrangement. Specifying the pair together removes three separate risks at once: glaze tone variation between batches, mismatched seating heights, and inconsistent mounting depth behind the pan.

If your layout uses a concealed cistern instead of a close-coupled pan, tell us at the outset. A back-to-wall bidet paired with a wall-hung WC follows different set-out logic than a floor-standing pair, and the carrier frame depth changes where the bidet's back support meets the wall.

Specify the glaze and the cleaning regime together

The 1038F is produced with a glossy ceramic glaze intended to resist dirt adhesion and limescale build-up, which keeps routine cleaning to a wipe-down rather than abrasive descaling. That performance only holds if the products your housekeeping team actually uses are compatible with it.

So put the cleaning regime in the brief. Tell us who cleans the fixture and with what: a neutral bathroom cleaner on a daily rotation, an acidic descale in a hard-water town, or chlorine-heavy protocols in a shared hospitality facility. We can then confirm which surface finish suits that regime and flag anything likely to dull the glaze inside a year of handover.

Water hardness belongs in the brief for the same reason. Where the supply is hard, scale on the rim and around the feed is the main maintenance complaint we hear about bidets after occupancy. It is not a defect, but it changes what you should expect from the surface and how often housekeeping should schedule a deeper clean.

Set out what "custom" means for this order

Through our Custom & OEM Service, buyers ask for changes at three levels. It helps to state which level you mean rather than writing "customised" in a subject line.

  • Configuration only. Outlet handedness, trap arrangement, inlet positions. The body stays standard; the plumbing interface is adapted.
  • Finish and trim. Glaze colour, tap-hole arrangement, seat and cover specification, hardware finish to match a tapware brand already chosen for the project.
  • Branding and packaging. Private labelling, marking on the underside or on the carton, packaging built around your own warehousing. Relevant if you resell under your own catalogue.

The first level is usually quickest to confirm. The second and third involve tooling, glaze trials and minimum order quantities, so raise them before the quotation is finalised rather than after a proforma invoice has been issued. If you are buying under your own brand for resale across several projects, say that in the first message; it changes how we structure sampling.

Send quantities as layouts, not just totals

"Two hundred pieces" is an incomplete instruction. A hotel order is normally a set of repeating bathroom types: a standard guest room, a suite, and a staff or accessible layout. Each type may need a different outlet arrangement or a different seating height.

Send the count per bathroom type with the fixture schedule reference for each, then state the phasing: how many units must land at site for the first block, and when the balance is expected. Production scheduling and container planning follow from that breakdown. A phased order split across two shipments usually costs less in handling than one large shipment released to a site that has nowhere to store it.

Agree what gets approved before production starts

For repeat layouts we recommend a documented approval sequence, and you should ask for it by name in the brief: a technical drawing carrying the mounting dimensions for your consultant to check; one physical sample or a glaze board where colour is critical; then written sign-off before batch production begins. Our cooperation steps run brief and design proposal, then quotation with detail confirmation, then production and shipment with follow-up, so the approval point sits between the second stage and the third.

Name the person who signs off, and how long that sign-off normally takes on your side. A sample sitting unreviewed for five weeks is the most common cause of a slipped delivery date on sanitary ware orders, and it is preventable at brief stage.

Confirm what arrives on site

Close the brief by fixing the commercial and physical detail of delivery. Which port or site address; sea, air or rail freight; who handles customs clearance in the destination country; and how the goods are packed and palletised so your fit-out contractor can move them internally. Our logistics and door-to-door delivery service covers freight forwarding, documentation and container loading, but import terms and duties still need confirming for each destination.

Also confirm what is in the carton. Inlet connections, fixings and any seat or cover are not always bundled by default, and a fit-out crew discovering missing fixings on installation day generates exactly the snag you were trying to avoid.

A short brief template you can copy

Here is the list we would like to see in a first message about this fixture. Attach a sketch and a fixture schedule where you have them.

  • Project type and country: residential, hospitality or mixed.
  • Outlet type, floor or wall, and the rough-in dimension from the finished wall face.
  • Hot and cold inlet positions, and whether a concealed carrier is involved.
  • Whether the bidet must match a specific WC in shape, height and glaze tone.
  • Quantity per bathroom type with schedule references, plus delivery phasing.
  • Cleaning regime and local water hardness.
  • Which level of customisation: configuration, finish, or branding.
  • Who approves drawings and samples, and their usual turnaround.
  • Destination, preferred freight mode, and who clears customs.

Where to send it

Send the completed brief with your drawings to our enquiry desk, quoting model number 1038F and your project location. We will check it against the 1038F mounting details and come back with a technical drawing for your consultant to review, a quotation broken down by bathroom type, and a proposed sample arrangement before anything goes into production.

Once the fixtures are approved and shipped, our installation and after-sales support covers on-site installation and inspection, so the set-out agreed at brief stage is the set-out your contractor works to. The measurements in your first message are the same ones checked against the installed fixtures before handover.

Dimensions, trap arrangements and rough-in figures discussed during an enquiry should be checked against the final technical sheet issued with your order before any contractor sets out pipework. Where this article refers to companion models in the 1038 series, confirm current availability for your market at the time of enquiry.