A two tone melamine wardrobe looks simple on a rendering: two panel colours, one clean line where they meet. In production that simplicity is exactly where problems appear. Before a single board is cut, the drawings, the finish samples and the internal layout all need sign-off, because once the melamine panel is pressed and edge-banded there is very little that can be corrected on site.
Start from the room, not from the catalogue
Our Two Tone Melamine Wardrobes are made to measure: dimensions, layout, board and finish are specified per project, which is why the first confirmation is a set of site-verified dimensions rather than the dimensions on the architectural drawing. Wall straightness, floor level, skirting, door openings, ceiling services and any recess all change the carcass size. For villa and apartment fit-outs we normally ask for the as-built measurement sheet to be countersigned before the shop drawings are issued.
Confirm the two-tone split on paper, then in the hand
Two finishes in one unit means two colour approvals and one decision nobody should leave open: where each finish starts and stops. Nail down which doors, panels and interior boxes carry which colour, whether the two tones meet on a rebate or a flush line, how the reveal is detailed around handles, and what happens at returns and corners that the eye will see from the bed side of the room.
Then approve physical samples, not screen images. Melamine decor looks different under warm bedroom lighting than under a daylight-balanced showroom tube, and light colours pick up substrate tone at the edge band far more visibly than dark ones. A written finish schedule listing board, decor reference, surface texture and edge-band code removes most arguments later.
Decide the door type before the carcass is drawn
Hinged and sliding doors change the internal layout, not just the front. A sliding wardrobe needs track clearance and an overlap allowance; a hinged run needs swing clearance in front of it and consistent hinge boring. If you are still weighing the options, the collections we publish for Two Tone Sliding Door Wardrobes and Two Tone Hinged Wardrobes show how the same two-tone idea resolves differently in each format.
Surface texture is the other half of that decision. The melamine wardrobe range covers Matte Finish Melamine Wardrobes, Glossy Finish Melamine Wardrobes and Textured Melamine Wardrobes. Mixing a wood-grain texture with a solid colour is the most common two-tone pairing, and the gloss level of both sides should be agreed together so the light reflection reads consistently across the façade.
Lock the internal layout and hardware on the shop drawing
Interior partitions, hanging heights, drawer counts, soft-close specification, integrated lighting and any glass or acrylic front should appear on the same approved drawing as the doors. Hardware is usually ordered separately from panels, so a late change to a handle type or a drawer bank can hold up the whole batch rather than one component.
What must be in writing before production starts
| Item to confirm | Why it stops the job later |
|---|---|
| As-built dimensions, signed | Panels are cut to size; a 10 mm error cannot be trimmed away on site. |
| Board and substrate spec per component | Moisture-prone walls and rear panels need the right board grade from the start. |
| Finish schedule with decor and edge-band codes | Two tones multiply the places where a mismatched band becomes visible. |
| Door type, opening direction and clearance | Track and hinge allowances are built into the carcass, not added afterwards. |
| Internal layout and hardware list | Hardware lead times sit outside panel production. |
| Packaging, labelling and container sequence | Units for several bedrooms arrive as one mixed load; clear labelling is what makes the install fast. |
| Delivery address, access route and install plan | Full-height panels need lift or stair clearance that cannot be improvised. |
If a detail is not on the approved drawing, it does not exist in the factory. Every confirmation above should trace back to one signed document set with a revision number.
How this fits into a wider fit-out order
Wardrobes rarely stand alone. When cabinetry, doors, wall panelling, flooring and lighting are ordered together from one one-stop furniture and building materials supplier, the finish schedule for the wardrobe has to reconcile with the skirting, the door frames and the flooring threshold as well. Our custom & OEM service covers bespoke finishes and prototyping, and project coordination runs through design, production, logistics and installation under a single document trail — useful on multi-apartment packages where the same two-tone detail repeats across units.
A short pre-production checklist
- Site dimensions verified and signed against the current drawing revision.
- Two-tone split drawn on every elevation, including returns and corners.
- Physical finish samples approved for both tones, plus edge bands.
- Door type, opening direction and clearance agreed.
- Internal layout, hardware and lighting fixed on the shop drawing.
- Packaging, labelling and delivery sequence confirmed for the site.
Send us the drawings and the room dimensions, and we will return shop drawings, a finish schedule and a production plan for your two tone melamine wardrobes before anything is committed to the line.