An eight-metre swim spa is not an off-the-shelf purchase. Before a single panel leaves the factory, the shell size, the equipment package and the site preparation all have to agree with each other. This guide walks through exactly what we need from you to price Outdoor Swim Spa WS-130AⅬ for a villa terrace, a resort pool deck or a private residence, and what you should expect back from us.

What the WS-130AⅬ covers in the standard catalogue

WS-130AⅬ sits in our configurable outdoor swim and hydrotherapy range, alongside shorter models for tighter terraces and longer ones for lap swimming. The published catalogue entry gives you a starting point rather than a fixed specification:

ModelWS-130AⅬ
Catalogue dimensions8000 × 3000 × 1400 mm
Control system1 set
Swim training system1 set
Water pump1 pc
Filter pump1 pc
Jet total20 pcs
LED lights7
Total power (catalogue)10.85 kW
Features shownWater jets, LED lighting, Ozone, Swim training system

Please read the figures above as catalogue reference values for this model. The equipment actually fitted, the electrical load and the final dimensions are confirmed in writing against your chosen configuration before production starts — we do not treat a brochure number as a delivery commitment.

The information that makes a quote accurate

Send us the following and we can price the project properly instead of giving you a placeholder figure:

  • Site and access. Where the spa will sit — terrace, ground floor deck, sunken pit or rooftop — plus the finished water level you want and how the unit reaches the site. Rooftop and upper-floor positions need structural review by your engineer before we confirm anything.
  • Base and support details. Slab or pedestal support, load path, waterproofing and drainage arrangement, and whether steps, a surround deck or an enclosure are part of your scope or somebody else’s.
  • Power supply. Available supply at the spa location: single-phase or three-phase, voltage and frequency, circuit capacity, and where the isolator and control position will be. Total connected load depends on which heating and pump options you select.
  • Equipment package. Which of the catalogue-listed options you want — heat pump, UV sterilisation, sand filtration, additional insulation, steps, spare or upgraded control system — and whether you want the swim training system retained as standard.
  • Finish and appearance. Cabinet colour and cladding, interior shell finish, lighting behaviour for evening use, and any matching requirement with the rest of the outdoor area.
  • Quantity and programme. One unit or several, plus your target delivery date and site-ready date, so production and shipping can be planned backwards from there.
  • Delivery terms. Destination city and port, preferred Incoterms, import arrangements, and who handles local permits. We arrange freight by sea, air or rail with door-to-door delivery where required.

If you are specifying the spa as part of a wider build, our Turnkey Interior Project Solutions team can coordinate it together with the rest of the outdoor and interior scope, so one quotation covers products that would otherwise come from several suppliers.

How the enquiry moves to a firm price

  1. Enquiry review. We check your site information against the model range and flag anything that does not fit — for example a width that clashes with the access route, or a power supply too small for the selected options.
  2. Configuration proposal. You receive a specification sheet for the proposed build: dimensions, equipment list, finish schedule and the items each party is responsible for on site.
  3. Quotation. Pricing covers the confirmed configuration plus packing and the freight option you chose. Options added or removed later are re-quoted rather than absorbed silently.
  4. Detail confirmation. Drawings and equipment details are signed off before production, which is where jet layout, control position and electrical termination points are fixed.
  5. Production, inspection, shipment. The unit is built to the confirmed detail, inspected, packed for export and shipped under the agreed terms, with tracking through to delivery.

Because a swim spa interacts with structure, water and electricity at the same time, we treat the pre-order stage as engineering work rather than paperwork. An enquiry that answers the questions above usually converts into a firm quotation quickly; one that does not tends to bounce back and forth for weeks.

Where the spa can be combined with other scopes

Swim spas are frequently ordered as part of a larger package. Poolside and terrace projects often add Outdoor Furniture for Villas and Resorts — loungers, daybeds, pergolas and conversation sets in aluminium frames and all-weather weave — so the deck furniture and the water feature are specified against the same drawings. Where the project also covers interiors, our One-stop Furniture and Building Materials Supplier service brings cabinetry, wall and ceiling finishes, flooring, lighting and bathroom fixtures into the same procurement programme.

If your project needs a different footprint — a shorter unit for a narrow courtyard, or a longer channel for genuine lap swimming — see the full Swimming Pools and Swim Spas range. We also manufacture customised outdoor spas in square, round, oval and curved shapes where a standard model cannot sit on the site.

Send your enquiry. Include site photos or drawings, the power supply available at the spa position, and your required delivery month. Specify “WS-130AⅬ” in the subject line so the enquiry reaches the swim spa team directly.

Phone / WhatsApp: +86-13928214007 (PHILLIP)  ·  Email: santerson@qq.com  ·  Enquiry form: Contact Us