A floating vanity looks simple on a mood board and complicated on site. Once the room is tiled and the pipework is closed in, the quotation you signed determines whether the unit hangs straight, the countertop seats properly and the drawers still run after two years of guest use. If your project includes Santerson vanities — for a hotel, serviced apartment, resort villa or office amenity block — the following checklist shows what a complete proposal should contain before you compare prices.

Start with the scope line, not the unit price

Most disputes on bathroom fit-outs begin because two bidders priced different things. As a one-stop furniture and building materials supplier, SANTERSON manufactures vanities alongside the ceramics, shower systems, lighting, wall panelling and cabinetry that surround them, so the scope line is where you decide how much of that bundle sits in one contract. Before requesting quotations, fix three things on your own drawing:

  • The finished dimension from wall to wall, plus the position of waste, water supply and any isolating valve.
  • Who supplies the countertop, basin, taps, mirror cabinet and vanity lighting — the joinery supplier, the ceramic supplier or a third party.
  • Who fixes the unit to the wall and who is responsible for the substrate behind it, especially on stud or tiled partitions.

Put those three answers in writing and ask each bidder to confirm them back. A quotation that repeats your scope wording is far easier to compare than one that describes its own product range.

Check what the configuration actually covers

The Santerson Floating Vanity is offered as a configurable item: dimensions, material and finish are specified per project rather than picked from a fixed catalogue size. That suits commercial work where room widths vary floor by floor, but it means the proposal has to state your agreed numbers explicitly. Read the specification for these details:

  • Made-to-measure width, height and projection for each bathroom type, with the drawing reference attached.
  • Carcass and door material with the finish system, including how edges are handled in a humid room.
  • Drawer and hinge hardware, and whether soft-close is included or an option.
  • How the countertop meets the wall — sealed, upstand or square edge — and who supplies that sealant on site.

Where a project needs more than one bathroom type, ask for the same specification repeated per type. A guest-room unit and an executive-suite unit rarely carry identical storage, and pricing them as one line hides the difference.

Compare like-for-like across the vanity range

Commercial bathrooms usually mix configurations rather than repeat one. The Santerson vanities collection covers the main variations you will be quoted, and each is specified per project:

ConfigurationWhere it normally sits in a commercial projectWhat to confirm before pricing
Santerson Floating VanityGuest bathrooms and office amenity blocks where a clear floor line makes cleaning fasterWall support detail, concealed waste route, drawer layout per unit
Santerson Double VanityServiced apartments, suites and larger villa bathrooms with two basinsBasin spacing, shared waste arrangement, mirror position relative to both basins
Santerson Integrated Countertop VanityHigh-use areas where a jointless counter reduces maintenance pointsCountertop and basin specification, storage layout, electrical provisions

If two bidders quote different configurations for the same room, you are not comparing prices at all. Reissue the drawing with the required configuration named.

Treat the surrounding items as part of the package

A vanity rarely fails on its own; it fails at the junctions. When you review a proposal, check whether these adjacent items are included and coordinated:

  • Vanity lighting — position, wiring route and switch location must be set before the wall is closed.
  • LED mirror cabinet or another mirror option, including its power supply and clearance for door swing.
  • Countertop and basin pairing — undermount and vessel basins need different cut-out and height decisions.
  • Wall finishes around the unit, whether wall panel systems, tile or stone, and who trims the edge.

Buying these from one manufacturer reduces interface risk. As a bathroom fixtures and interior fit-out supplier, SANTERSON also supplies engineered flooring, lighting, wardrobe and kitchen cabinetry for the same building, which is where a single coordination contact starts to pay for itself on site.

Read the delivery and after-sales terms against your programme

Made-to-measure joinery sets your critical path. A supplier offering logistics and door-to-door delivery handles freight, packaging and documentation, but you still need to confirm the practical detail for your site: the delivery address and receiving hours, who offloads, how the units are protected for storage on a busy site, and how replacement parts arrive if one is needed later. The same applies to installation and after-sales support — ask what inspection happens at handover, what the warranty covers in commercial use, and who supplies spare drawer runners or hinges years into operation.

Ask for one written document that shows the production sequence: drawing sign-off, sample or first-article approval, production window, shipping booking, site delivery date and installation support. If a proposal cannot show that sequence, the unit price is not yet meaningful.

Five questions worth asking before you award

  • Which drawing revision does this price follow, and what changes trigger a re-quote?
  • Is the wall-support detail for a floating unit supplied by you or by our builder, and on which substrate has it been used?
  • What is the first-article or sample arrangement before full production runs?
  • Which items in this quotation are manufactured by you, and which are sourced from others?
  • What happens if a unit arrives damaged — replacement lead time and who pays freight?

The answers tell you more than the headline figure. A slightly higher quotation with clear scope, named configurations and a stated production sequence usually costs less than a cheaper one that generates variations after the walls are closed.

Frequently asked questions

Can a floating vanity be used in a hotel rather than a home?

Yes, provided the specification is set for contract use: hardware rated for frequent operation, finishes suited to humid rooms and a wall-support detail confirmed against the actual partition build. The Santerson vanities are specified per project, so these points belong in the approved drawing.

Why do floating vanities need more coordination than floor-standing units?

Nothing transfers load to the floor, so the fixing detail and the substrate behind the tile both matter, and the concealed waste must be routed before the wall is closed. That work has to be sequenced with the builder, not solved at handover.

Should vanities be ordered together with other bathroom products?

Ordering vanities, ceramics, shower systems, lighting and wall finishes through one one-stop solution reduces interface disputes and keeps finish schedules consistent. Confirm the scope line for each trade in writing so nothing is assumed.

SANTERSON has manufactured furniture and building materials since 2008 and works on villa, hospitality and office projects, with custom and OEM production, project coordination and door-to-door delivery. Send your bathroom layout and finish schedule to discuss a vanity specification for your project.