Media & TV Walls · Project Procurement

A full-height media wall looks simple on a drawing and complicated on site. One elevation carries the television, the wiring, the storage, the display shelving and often the lighting — and in a multi-product project it also has to match the joinery, wall panelling and flooring specified for the rest of the building. This guide explains how buyers, contractors and interior consultants scope Santerson Full Height Media Walls across several rooms, and price them properly the first time.

The starting point is understanding what you are actually buying. The Full Height Media Wall listing in our Media & TV Walls collection is a configurable system: finish, layout and dimensions are specified per project rather than chosen from a fixed catalogue size. That is why two identical-looking walls can carry very different costs, and why the budget line should be built from a list of decisions instead of a single unit price.

What drives the cost of a full-height media wall

Because these systems are made to measure, the quotation follows the specification. Five variables do most of the work.

  • Run length and floor-to-ceiling height. A wall that stops below the ceiling and one that returns into it are different assemblies, with different framing, different fixing details at the top and different access requirements for services above.
  • The open-to-closed ratio. Open niches and display shelves show everything, so they demand tighter tolerances and neater cable management. Closed cabinets hide equipment but add doors, hinges and internal fittings.
  • Panel and door finish. Lacquer, veneer, textured panels and stone or marble surfaces sit at different price points, and the finish you choose for the media wall should be reconciled with the wall paneling systems used elsewhere on the same floor.
  • Integrated lighting. Backlit panels and lit niches are electrical work as much as joinery. They need driver positions, switching, a maintenance route and a site power supply, all agreed before the panels are manufactured.
  • Screen size and mounting method. The screen dimensions, bracket type and cable routing determine the opening size and the reinforcement behind it. Changing the television after manufacture usually means changing the panel.
One rule before you price anything

Dimensions, materials, hardware and electrical options for these wall systems are confirmed per project. Treat any indicative figure as a starting point only, and lock the specification drawings before production is released.

Scoping the media wall across several rooms

On a villa or apartment package you rarely specify one wall. The living room elevation, the media units in the bedrooms and the storage walls in the hallway all compete for the same budget and have to read as one design language. Specifying them together is where a single supplier earns their place.

For the principal living space, Santerson Integrated TV Panels and Santerson Sliding Panel TV Systems cover the two common briefs: a screen that sits flush inside a panelled elevation, or one concealed behind sliding panels so the room reads as joinery when the television is off. Bedrooms and family rooms are usually better served by the TV cabinets and media units range, including Santerson Integrated LED Media Units where lit shelving is part of the look.

Where storage matters more than the screen, the Integrated Storage Walls collection — full-height storage walls, integrated media storage and open display niches — uses the same made-to-measure approach, so door fronts, shelf depths and finishes can be carried across from the main media wall. A mixed elevation combining lit display with concealed storage is usually specified as mixed open and closed storage, which keeps day-to-day clutter out of sight while leaving the styling pieces on show.

Keep the finish consistent, not the layout identical

Repeating one layout across every room is rarely right; repeating the material palette almost always is. Veneer, matte lacquer and wood tones specified for the media wall should match the custom kitchen cabinetry in the same dwelling, otherwise the joinery reads as three separate purchases. We produce these elements together, which is what keeps the colour and grain matching rather than merely similar.

How to budget the media wall line by line

The practical way to budget a multi-product project is to price the wall in layers, because each layer is bought from a different trade and confirmed at a different stage.

Budget layer What you are specifying Confirm before
Carcass and structure Run length, heights, shelf positions, reinforcement behind the screen, wall fixing method Layout drawings are signed off
Fronts and surfaces Door and panel material, colour or grain, edge details, handle or push-open choice Samples are approved on site against the flooring and wall finishes
Internal fittings Drawer units, adjustable shelving, equipment compartments, ventilation for electronics Equipment list is final
Electrical Integrated cabinet and niche lighting, backlit panels, sockets, drivers, switching First fix on site
Logistics and installation Packing, freight, delivery to the property, installation and snagging Order is released

Two of these layers are where projects most often overrun. The first is electrical: a lighting specification added after the panels have been cut means new cut-outs, new drivers and rework. The second is internal fittings, because equipment lists change late — a soundbar, a console or a set-top box arrives after the compartments were sized. Fixing both before drawings are released protects the programme as much as the budget.

Buying media walls together with the rest of the fit-out

A media wall is one element in a package that normally also includes cabinetry, wardrobes, doors and panelling. Sourcing them separately saves an early quotation but multiplies coordination later: different drawings, different tolerances, different delivery dates and different installers on site.

SANTERSON works as a one-stop furniture and building materials supplier, manufacturing and supplying both the joinery and the finishes around it, with turnkey delivery from design through to installation. For Australian villa and apartment work in particular, consolidating wall systems, storage walls and interior fixtures under one purchase order shortens the coordination chain.

Our project workflow runs in six stages: consultation, design and planning, production, logistics, installation and after-sales. Under that structure you submit the elevations once, confirm materials and dimensions against samples, then receive the wall systems with freight arranged to the property rather than to a port. Where a project needs non-standard dimensions, panel materials or branding, our custom and OEM service covers bespoke design, prototyping and material selection for each elevation.

The quotation you should be comparing is not a price per wall — it is the number of trades that have to agree on one elevation before anyone can start cutting.

A practical checklist before you request a quotation

  • Measured elevations for every room, including floor-to-ceiling heights and skirting or flooring details at the base.
  • Screen sizes and mounting preference — flush, wall-hung behind panels, or on a cabinet.
  • The equipment list for each compartment, with ventilation needs noted.
  • Lighting intent: none, shelf lighting, niche lighting or backlit feature panels.
  • Sample references for the finishes used elsewhere in the project, so fronts can be matched.
  • Delivery address, access constraints and installation dates.

Send that package and the quotation comes back as a set of confirmed configurations rather than an estimate. That is the difference between a media wall budget you can sign off and one that moves twice before production.

Frequently asked questions

Can the media wall be made to a non-standard ceiling height?

Yes. These systems are made to measure, so height, run length and internal layout are set from your site dimensions. Ceiling details, cornices and service voids should be shown on the drawings so the top fixing detail can be designed around them.

Can I specify different finishes for different rooms?

Yes, and it is common to keep the living room elevation in a feature finish while bedrooms use a plainer door front. We recommend keeping one material palette across the dwelling so the joinery reads as designed rather than assembled.

Do you ship wall systems to Australia?

Yes. Freight is arranged door-to-door with packing and container loading handled as part of the order, and installation support follows delivery. Import terms, duties and transit arrangements are confirmed per project.

What is included in the price?

The manufacturing scope covers the specified carcass, fronts, internal fittings and integrated lighting as confirmed in your drawings. Site first-fix electrical work, structural preparation and any local trade finishing are arranged separately on site.

If you have elevations ready, send them over with the equipment list and finish references and we will return a configured quotation for the full set of media walls in the project — not a single line item that has to be re-priced later.