Classic paneled joinery photographs beautifully in a villa or apartment scheme, but it is also one of the easiest items for an overseas order to go wrong on. Panel profiles read differently in person than on screen, timber species and finish are easy to describe loosely, and a wardrobe that is only 20 mm out of square will not sit against an Australian wall. Before you place a wardrobe order with an offshore manufacturer, here is what to put in writing and what to ask for as evidence.
1. Confirm What "Solid Wood" Actually Covers In Your Quote
The phrase "solid wood wardrobe" covers a wide range of build-ups. A door may be a solid timber frame with a raised or recessed centre panel, while the carcass behind it is a different substrate. Some wardrobes in the same visual family are specified as veneer, lacquer, melamine or acrylic over an engineered board.
On our site these are separate product families for exactly this reason: Classic Paneled Solid Wood Wardrobes sits in the Solid Wood Wardrobes collection, while raised-panel and recessed-panel doors are catalogued under Classic Paneled Wardrobes. Ask the supplier to state, line by line, which parts of the unit are solid timber, which are engineered board, and which are a decorative surface. A quote that says only "solid wood, classic style" is not a specification.
2. Fix The Panel Profile With A Drawing, Not A Photograph
A panelled door is defined by its profile: how deep the moulding is cut, whether the centre panel is raised or recessed, the width of the stiles and rails, and whether the edges are eased or sharp. Two doors can be the same species and the same colour and still look completely different once installed in a row.
Request a dimensioned elevation drawing that shows the profile section, plus a physical sample of the moulding rather than a printed finish board. Photographs under showroom lighting flatten relief, and a rendered 3D view will not tell a machinist how deep to cut. If you are matching existing skirting, architraves or cabinetry in an older Australian home, send measured photographs of that joinery as well.
3. Specify Timber Species And Moisture Content Explicitly
Our Solid Wood Wardrobes collection is listed by species, including Oak Solid Wood Wardrobes, Walnut, Cherry and Mahogany variants. Each of these moves differently with humidity and takes stain differently.
Ask the manufacturer to state the species and cut (quartersawn or flatsawn), the target moisture content at dispatch, and how the timber is conditioned before machining. Timber machined at a moisture level suited to the factory but shipped into a heated, air-conditioned Australian interior can shrink, open joints or twist after installation. Get the moisture figure in the order documents so it becomes something you can check on delivery, not an assumption.
4. Set The Finish System And Its Sheen Level In Writing
"Natural oak finish" means nothing on its own. Specify the finish system (lacquer, varnish, oil, painted), the number of coats, the sheen level, and the colour reference — ideally a recognised colour code plus a sprayed sample panel posted to you for approval before production starts.
Also ask what is covered by the finish warranty and what is not. Sun exposure through a west-facing window will affect any timber finish over time, and marketing language about durability is not a warranty term until it appears in your contract.
5. Verify Dimensional Tolerances And Site Interface Details
Built-in wardrobes fail on site far more often than they fail in the workshop. Before production, confirm:
- Who takes the final site measurements, and at what stage of the building works.
- Whether the stated dimensions are finished or rough opening sizes, and how out-of-plumb walls are handled.
- How the unit meets the floor: scribe, plinth, or adjustable levelling feet.
- Clearance for skirting boards, architraves, cornices and light switches.
- Whether the carcass arrives assembled or flat-packed, and how modules are joined on site.
- Door type and swing clearance — hinged, sliding or bifold doors each need different allowances.
Our wardrobe product pages state made-to-measure sizing with material, finish and layout options specified per project, and they carry a standing instruction to confirm dimensions and selected specifications for each project. Treat that as the rule: no dimension is final until it has been confirmed against your drawings.
6. Check Interior Fittings And Hardware Separately
The doors are the visible part; the fittings are the part that wears out. Specify drawer runners and hinges by brand and model, soft-closing or otherwise, and confirm load ratings for drawers carrying heavy clothing. Then set out the internal layout: hanging heights, shelf depths, drawer bank position, and provision for lighting.
If you want integrated lighting in the carcass, decide early — cabling routes and transformer positions have to be machined before assembly, not retrofitted on site. Also ask what spare hardware ships with the order, since replacement hinges are hard to source mid-handover.
7. Get Packaging, Freight And Handling Terms Confirmed
Panelled doors are the most easily damaged component in a cabinetry shipment. Ask for the packing method (corner protection, glazing bars between panels, moisture barrier), the container loading plan, and photographs of the packed cartons before the container is sealed.
Agree in advance how damage claims are handled: who inspects at the port, what photographic evidence is required, and how replacement panels are produced and shipped. A pre-agreed process turns a two-week problem into a two-day one.
8. Confirm Installation And After-Sales Responsibility
Decide who installs the wardrobes and who is liable for snags. Our service range includes on-site installation, inspection and snagging, warranty coverage, spare parts and replacement, and ongoing maintenance; response-time figures published on the site should be confirmed for your project before you rely on them.
If a local Australian cabinetmaker is doing the fitting, send them the shop drawings and assembly sequence before manufacture. The cheapest fix is the one identified on a drawing, not the one discovered with the unit already in the opening.
Documentation Checklist Before You Release An Order
| Item to confirm | Evidence you should hold |
| Construction make-up | Line-by-line schedule of solid timber, engineered board and surface materials |
| Panel profile | Dimensioned elevation with section detail, plus a physical moulding sample |
| Timber species and moisture | Species, cut and target moisture content stated on the order |
| Finish | Sprayed sample panel approved in writing, with sheen and colour code |
| Dimensions | Site-verified measurements signed off before production starts |
| Hardware | Brand, model and load rating for hinges, runners and handles |
| Freight terms | Incoterms, insurance cover and packing method on the purchase order |
| Installation and warranty | Named responsible party, snag list process and written warranty terms |
Frequently Asked Questions
Can a classic paneled wardrobe be matched to an existing Australian joinery detail?
Usually yes, provided you supply measured photographs or a physical sample of the skirting, architrave or cabinetry you need to match. Our Custom & OEM Service covers bespoke finishes and textures, prototyping and material selection, so a profile can be reproduced from a sample rather than chosen from a standard catalogue page.
Are these wardrobes made to a fixed size?
No. The wardrobe product records state made-to-measure sizing with layout, finish and material options specified per project. Final dimensions must be confirmed against your site conditions before production.
What if the wrong panels arrive or a panel is damaged in transit?
Agree the replacement process before you order, not after. Our after-sales support covers inspection and snagging, spare parts and replacement; your purchase order should set out the photographic evidence required and who pays freight on replacements.
Talk To Us About Your Wardrobe Package
SANTERSON is a China-based furniture and building materials manufacturer supplying project customers, with wardrobe and cabinetry produced to project-specific dimensions, finishes and layouts. Send us your drawings, the species or finish you are working to, and the site condition of the opening, and we will return a specification you can check line by line. Enquiries go through our contact page.