Textured melamine cabinet panels look finished and forgiving on the showroom sample, but they travel as flat packs across ports, warehouses and stairwells. In our experience with kitchen projects, most damage reports are not manufacturing faults — they are edge chips, corner dings and moisture marks that appeared between the factory door and the installation date. Before you place an order for Textured Melamine Cabinets, ask your supplier to put the packaging plan in writing, package by package.

1. Panel protection: what covers the faces and the edges

The textured surface is the selling point, so it is also the surface you least want scuffed. Confirm in writing:

  • Whether panel faces are interleaved with protective interlayer (foam sheet or corrugated divider) rather than stacked board-against-board.
  • Whether the decorative face is protected against abrasion from strapping, and whether strap corners sit on edge protectors instead of directly on a panel face.
  • How exposed edges are handled — edge banding condition plus corner guards — because chipped edges are the claims most often raised on site and the hardest to repair there.
  • Whether door fronts, glass-front doors and any textured sample panels ship in separate rigid cartons rather than loose in a bundle.

Ask for photographs of the actual packed bundle for your order, not a generic packing illustration. A photo of one bundled set tells you exactly how your panels will arrive.

2. Cabinet structure: loose, assembled or knock-down

For Custom Built-in Kitchen Cabinets supplied on apartment and hotel fit-outs, decide the shipping form before production starts, because it changes both packing and site labour:

  • Assembled carcases — less assembly time on site, but they take more cubic metres, need stronger corner protection and are harder to manoeuvre through narrow lifts and doorways.
  • Knock-down / flat-packed — denser loading and cheaper freight, but every fixings kit, cam, dowel and hinge must be labelled and counted per unit, or installation stalls.

Whichever route you choose, require the packing list to match that form: assembled units listed by unit number, flat packs listed by pack number with contents itemised. If your project mixes both — for example tall units assembled and wall units flat-packed — the packing list should say so explicitly.

3. Hardware, doors and accessories: how they travel

Cabinet hinges, drawer slide rails, support legs, connecting brackets and handles are small, heavy and easily lost. Confirm:

  • Hardware is boxed per cabinet or per room, not dumped into one shared carton for the whole container.
  • Each box carries an external label naming the unit it belongs to, plus a quantity list you can tick off at receiving.
  • Delicate items — glass panels, mirror fronts, integrated lighting components — travel in their own carton with cushioning, marked fragile and kept out of the load path.
  • Spare hardware allowance is stated: how many spare hinges, slides and shelf pins ship with the order, and at what cost if you need more later.

4. Moisture and climate: the quiet risk for board panels

Melamine-faced board is stable indoors, but it is not happy sitting wet on a dock or in an unsealed site store. Ask your supplier:

  • Whether cartons are shrink-wrapped or otherwise weather-wrapped for ocean transit.
  • Whether desiccant is used inside the wrapping, and whether containers get a moisture barrier liner on long sea legs.
  • Whether panels are loaded off the container floor on dunnage so they never sit in standing water at the doors.
  • Your own storage rule: deliver to a dry, covered space, keep packs unopened and upright until installation week, and let boards acclimatise on site before fitting.

Import terms, duties and transit arrangements differ by destination and change over time. Confirm the Incoterms, insurance cover and delivery scope for your specific shipment with the supplier rather than assuming a standard arrangement.

5. Labelling that lets one person receive the whole delivery

On a multi-apartment or villa job, cartons arrive at once and rooms repeat. Weak labels slow a fast install down. Require:

  • Carton numbers in sequence with a total count on the outside of every pack ("3 of 14").
  • Unit or room codes tied to your approved shop drawings, so fitters know which pack belongs to which kitchen or wardrobe.
  • Gross and net weight plus dimensions on each carton, so the site team plans trolleys, lifts and storage space in advance.
  • Handling icons (this way up, keep dry, fragile) printed or firmly attached, not a marker note that rubs off in transit.

6. Loading plan and container type

Ask for the proposed loading diagram before the container is stuffed. It should show where cabinet packs sit relative to heavier goods such as stone tops, tiles or sanitaryware — heavy items never ride on top of door fronts. Confirm whether you are shipping LCL or FCL, and if LCL, whose packaging standard applies, since shared containers put your panels next to someone else's cargo. For mixed orders that also include furniture and building materials from the same factory — flooring, wall panels, lighting — a single consolidated loading plan with room-coded packs keeps the whole fit-out traceable.

7. Put it in the purchase order, then inspect on arrival

Packaging terms only bind when they appear in the order documents. Before production release, have the purchase order or proforma state: packing form (assembled or knock-down), interlayer and edge protection, hardware boxing and labelling, weather wrapping, carton marking convention, and the spare-parts allowance. On arrival, photograph the container doors as they are opened, count cartons against the packing list, open a representative sample of packs before signing, and report any damage the same day with photos and the carton number.

SANTERSON supplies kitchen cabinetry as part of a wider package of interior fixtures for villa, hospitality and apartment projects, so packing is planned together with production scheduling and door-to-door delivery rather than left to the shipping desk. Send us your drawings and room schedule and we will confirm the packing form, carton marking and loading plan for your job before production starts.

Talk to us about packaging for your cabinet order
WhatsApp / Phone: +86-13928214007 (PHILLIP)  |  Email: santerson@qq.com  |  Contact SANTERSON