A partition sliding system is one of the most useful moves in a villa or apartment plan: it reopens a room in seconds, closes it off for privacy, and does it with a finish that matches the joinery around it. Because every opening is different, we do not publish a single price list. This guide shows procurement teams, designers and homeowners exactly what to send us so that the quotation for Santerson Partition Sliding Systems comes back accurate the first time, instead of drifting after the order is placed.
One point worth stating before anything else: these systems are made to measure. Panel size, layout, material and finish are set to your space, and the hardware that carries them is chosen from the opening you actually have on site. A quote built without those two inputs is an estimate at best.
Why partition sliding systems are quoted per project
Our sliding panel systems are made-to-measure. Panel sizes, layout and finish are specified to suit each space, and the track, hardware and opening dimensions are confirmed for the individual project before production starts. That is why a quote cannot be produced from a catalogue number alone: two openings of the same width can need completely different hardware if one is load-bearing on a finished floor and the other is top-hung under a ceiling with a bulkhead.
The same logic applies across the collection. Santerson Acoustic Sliding Panels are specified where separation between zones matters, and the performance required has to be agreed for the chosen configuration. Santerson Glass Sliding Panels need the glass type and safety requirements confirmed per project. Santerson Closet Sliding Panels are driven by wardrobe opening dimensions and hardware choice. Send the same information for any of them and the estimating process is identical.
What to include in your enquiry
The faster enquiries are the ones that arrive with the following already prepared. You do not need a completed detail design — a marked-up drawing or even clear photographs work — but each item below removes one round of questions.
- Opening dimensions. Clear width and height at several points along the run, plus the floor-to-ceiling condition. Note obstructions such as skirting, cornices, beams or recessed niches.
- Panel count and stacking direction. How many panels you want, which side they stack to when open, and whether the opening must be fully clear or only partially.
- Application. Room divider, closet front, office or hospitality zone separation. This drives hardware selection and, where relevant, acoustic specification.
- Finish and material preference. Wood tone, veneer, lacquer, textured surface or glass. Tell us whether the panels should match existing joinery — send the joinery schedule or a sample reference if so.
- Substrate and structural notes. Floor finish, wall build-up and any load limits. Top-hung and floor-guided arrangements are quoted differently.
- Project location, quantity and target programme. Number of sets, delivery city, and the date on site. This lets us price packaging and freight with the panels rather than after them.
If you are specifying for a villa or hotel fit-out and the sliding partitions are one line among many, that is normal. As a one-stop furniture and building materials supplier, we quote partitions alongside cabinetry, wall panelling, doors, flooring and the loose furniture for the same project, so you coordinate one package instead of several.
How the quotation is prepared
Once your enquiry reaches us, the workflow follows the stages we run for every custom project: design and planning, production, logistics, installation and after-sales support.
| Stage | What happens | What you receive |
|---|---|---|
| Brief review | We read your dimensions, layout intent and finish preference, and flag anything that affects hardware or lead time. | A short list of gaps to close before pricing. |
| Configuration and quotation | Panel layout, material and finish options are set out for your space; made-to-measure sizing is applied. | Itemised quotation with the assumed specification written into it. |
| Detail confirmation | Track type, hardware, opening dimensions and finish are confirmed. Acoustic performance, glass type or safety requirements are fixed here where they apply. | Approval drawings or a specification sheet for sign-off. |
| Production | Manufacturing begins only after your confirmation, with quality control during production. | Production schedule and inspection records on request. |
| Delivery and installation | Packaging, container loading and freight are arranged to the project address; on-site guidance and after-sales support follow. | Packing list, shipment tracking and installation arrangements. |
Nothing is committed to production until you have signed off the specification. That single step is what keeps a made-to-measure order predictable.
Questions that change the price — ask them early
- Does the partition need to separate two zones that are used at the same time? If so, say which rooms and what you need from the closed panel — we quote acoustic sliding panels against the requirement you state rather than assuming one.
- Is the finish decorative or functional? A panel that also hides storage behaves differently from a pure room divider, and sliding storage panels may be the better line.
- Will daylight need to pass through the closed partition? Glass panels keep a plan open when closed but bring glass type and safety requirements into the specification.
- Who sets out the opening on site? Made-to-measure panels only fit an opening that has been built to the confirmed dimension, so this is worth settling before the walls are finished.
Track, hardware and opening dimensions are confirmed for each project. We do not publish fixed technical figures for these systems, because the correct specification depends on your opening, substrate and use. Anything you need in writing — dimensions, material build-up, hardware schedule, safety or acoustic requirements — is confirmed with our team during the detail stage.
Sending your enquiry
Send drawings, photographs and the dimension list to PHILLIP by email at santerson@qq.com, or reach us on Phone / WhatsApp +86-13928214007. Our contact page is open Monday to Saturday, 8:00 AM to 6:00 PM (GMT+8). Tell us the project location and target date on site, and we will come back with a specification and a quotation you can put in front of your client or builder.