A partition sliding system looks simple on a rendering: a few panels glide across an opening and the plan changes from one room to two. On site it is one of the less forgiving items in a fit-out. Track level, floor flatness, panel thickness, clearance above the head and the finish return all have to agree before the first panel is made. This guide explains how we take Santerson Partition Sliding Systems from a drawing on paper to an installed wall that opens and closes properly, using the documentation and site checks that prevent the most common rework.
What the product page actually specifies
Santerson Partition Sliding Systems belongs to our Sliding Panel Systems collection and is built for residential wall system projects. The listing does not publish one fixed size or one fixed finish, because it is not a catalogue item you order off a shelf. Each set is configured for the space: made-to-measure dimensions, your choice of material and finish, and a layout that follows the room rather than a standard module. The same configurable approach applies to related items in the collection, including Santerson Closet Sliding Panels, Santerson Acoustic Sliding Panels and Santerson Glass Sliding Panels.
Because the specification is set per project, the information we need from your side decides how accurately we can quote and produce. Track type and hardware, panel stack and stacking direction, opening width and clear height, and the finish of the surrounding wall are the items that shape both price and production time. Where a project needs a door rather than a full-height panel wall, our Santerson Flush Sliding Doors or Santerson Wood Veneer Pocket Doors are usually the better starting point, and we will say so rather than force a panel system into an opening that does not suit it.
Reading your drawings before anything is quoted
We work from the drawing set you already have, and we read four things in a set order.
- Plan view. Where the panels stack when open, whether the opening is single or double run, and whether furniture, a cornice or a service run sits inside the travel zone.
- Elevation. Clear height at the head of the opening, because floor build-up and ceiling detail change it. A height taken from a structural drawing is not the same as a finished height.
- Section. Track depth, whether the track is recessed into a bulkhead or exposed, and how the wall finish returns to the track.
- Finish schedule. The material and colour reference you want the panels to match, so the sliding wall reads as part of the joinery package instead of an accessory added later.
If a drawing shows a sliding partition but no section through the track, we treat that as an open item and raise it in the design coordination stage rather than assume a detail. Assuming is what produces the site problem where a floor finish arrives noticeably higher than the drawing assumed and the panels no longer clear the carpet.
Site dimensions we ask you to confirm
Drawings set the intent. Site figures set what can be built. For each opening we ask for the following, taken after the wet trades and floor finishes are complete wherever that is possible:
- Opening width at three points along the run — left, centre, right — rather than one measurement.
- Clear height at both ends of the opening and at the middle, with the finished floor level noted.
- Floor flatness along the track line, since a sliding track follows the floor it sits on.
- Available depth for the track and for the panel stack when open, checked against any skirting, door reveal or service duct.
- What is above the opening: bulkhead, slab, or ceiling grid that has to be cut or supported.
Where a project carries several openings, we record them as a schedule with an opening number against each one. That schedule becomes the reference on the shop drawings, the packing list and the site instructions, so nobody on site is matching a panel to a description.
How our process closes the gap between drawing and site
Sliding partitions cause trouble less often through bad manufacturing than through information that was never exchanged. Our workflow for these systems follows the same sequence we use across turnkey interior project solutions:
- Brief and design proposal. We review your drawings, list the open items, and propose a layout with panel count, stacking direction and track type for each opening.
- Shop drawings for approval. Dimensioned drawings show every opening by number, with the hardware and finish references marked. Your sign-off on these drawings is what we produce from.
- Quotation and detail confirmation. Material, finish, hardware and packing are fixed at this stage, so the price you approve matches what ships.
- Production and inspection. Panels, frames and hardware are produced together and checked against the approved drawing before they are separated into packs.
- Delivery and site guidance. Packs arrive labelled to the opening schedule. We also supply the installation requirements — including what must be levelled and finished before the track goes in — so your builder prepares the openings in time rather than at the last minute.
If your project is procured through one-stop furniture and building materials supply, the sliding wall is specified alongside the joinery, wall panelling and doors it has to match. That single package is where most of the coordination value sits: one drawing set, one finish reference list, one delivery window, instead of three suppliers comparing dimensions by email.
Coordination points that decide the result
| Item to fix early | Why it matters on site |
|---|---|
| Finished floor level along the track line | Set out before tiling or screed, so panels clear the finished floor with the intended gap. |
| Track support above the opening | Bulkheads and ceiling grids need to carry the track; this is a structural note, not a joinery note. |
| Stacking zone and what sits in it | Light switches, handles, curtains and furniture all interfere with panel travel if left uncoordinated. |
| Finish boundary at the reveal | Decides whether the wall finish returns to the track or the panel overlaps the opening — a detail that must be drawn, not improvised. |
| Acoustic expectation | If sound separation matters, state that brief at design stage. Our acoustic sliding panels are configured for it, rather than judged afterwards against a standard panel wall. |
A short checklist before you send the enquiry
Send these items and we can move straight to shop drawings instead of a round of questions:
- Plan and elevation for each opening, with the openings numbered.
- The section or detail you intend for the track, if one exists.
- Finished floor level and floor build-up along the run.
- Material and finish reference from your schedule.
- Your programme dates: drawing approval, production, delivery to site.
For Australian villa and apartment work we take the same approach we apply on our Australian project cases: dimensions confirmed on site, drawings approved in writing before production, and installation requirements handed to the builder early. If you have a drawing set ready, send it with the opening numbers and we will return coordinated shop drawings for each sliding wall in the package.
Talk to us about your partition sliding systems — Phone / WhatsApp: +86-13928214007 (PHILLIP) · Email: santerson@qq.com · Contact SANTERSON