A procurement team rarely rejects a swim spa quotation because of the price alone. It rejects it because the file in front of the engineer, the architect or the main contractor cannot answer three questions: will the shell fit the slab and the access route, can the electrical service carry it, and what exactly arrives on the truck. A product submittal for Outdoor Swim Spa WS-S06M exists to answer those questions before a purchase order is raised. Below is the package we prepare, section by section, so your consultant can review and approve it in one pass instead of three.
1. Identification sheet: model, category and scope of supply
Start with a page that leaves no ambiguity about what is being bought. State the model as listed in our catalogue, the product category, and the exact configuration under review. For this unit the catalogue records model WS-S06M within the swimming pool and swim spa range, described as part of a configurable outdoor swim and hydrotherapy series.
The scope-of-supply table then separates two things that buyers often merge: what is included in every unit, and what is an option. Catalogue-listed options for this range include control systems, UV sterilization, water pumps, heat pumps, sand filtration, insulation and steps. Availability and compatibility vary by model, so the submittal should mark each option as included, optional or excluded for the specific quotation number on the table header.
| Item | Catalogue entry | Status for this quotation |
|---|---|---|
| Model designation | WS-S06M | Fixed by catalogue |
| Product category | Swimming Pools and Swim Spas | Fixed by catalogue |
| Options (heat pump, UV, sand filtration, insulation, steps) | Listed as optional accessories for the range | To be confirmed per quotation |
2. Dimensional drawings: shell, water depth and access route
The catalogue records overall dimensions of 5900 × 2200 × 1610 mm for WS-S06M. Put those figures on a dimensioned outline drawing with the shell shown in plan and in section, and mark the water line, the coping or edge detail, and the plant access points. Consultants approve drawings, not numbers buried in a paragraph.
Three dimensions do the real work. The internal length tells the design team whether lap swimming is realistic at the intended jet setting. The height governs whether an in-ground, semi-recessed or above-ground installation suits the finished water level and the coping detail. And the smallest dimension decides transport: a shell that cannot pass the site gate, the crane pick zone or the basement ramp is a wrong product regardless of its performance.
Where the project is in Australia, we state dimensions as catalogue values and let the local engineer confirm slab thickness, load path, drainage falls and any permit requirement. We do not certify local code compliance on your behalf; we supply the data your engineer needs to certify it.
3. Equipment schedule: pumps, jets, lighting and control
The equipment schedule is where submittals most often go wrong, because a specification line and a features banner on a website do not always use the same words. The catalogue specifications for WS-S06M list one control system, two water pumps, one filter pump, a jet total of 48 pieces, LED lighting together with small LED lights, and features shown as water jets, LED lighting, ozone and four water columns.
Note that the captured specification sheet for this model does not list a swim training system. If your project brief assumes continuous-counter-current lap swimming, raise it as an item to confirm on the quotation rather than assuming it is inside the base unit. The same applies to lighting counts: catalogue entries in this range record both a main light count and a separate small-LED count, so ask for the schedule written out per circuit instead of a single combined figure.
| System | Catalogue specification (WS-S06M) |
|---|---|
| Control system | 1 set |
| Water pump | 2 pcs |
| Filter pump | 1 pc |
| Jet total | 48 pcs |
| LED lighting | Main LED lights plus small LED lights; confirm the split per circuit |
| Water features | 4 water columns |
| Water treatment shown | Ozone; UV sterilization available as an option |
| Swim training system | Not listed for this model in the captured specifications |
4. Electrical and utility data: load, supply and protection
The catalogue records a total power figure of 6.95 kW for WS-S06M. Treat that number as the starting point for the electrical submission, not the end of it. The electrical engineer needs the connected load, the phase and voltage requirement, the starting behaviour of the pumps, the protection device rating, the earthing and equipotential bonding arrangement, and the position of the isolator relative to the water's edge.
Add a heat pump to that same schedule and the connected load changes materially, which is why the option list must be closed before the electrical drawings are issued for construction. Our product team confirms included equipment and electrical requirements for the selected configuration in writing, so your engineer sizes the sub-board from final data rather than from a brochure.
Do not forget the water side: supply point for filling and top-up, drain or waste point for draining and backwashing filtration, drainage falls, and where the plant room sits relative to the shell for maintenance reach.
5. Materials, finish schedule and corrosion exposure
A submittal should name the shell material, insulation build, jet and fitting materials, coping or edge finish, and the colour or texture selected. For an outdoor installation, state the exposure the unit will actually live in: full sun, coastal salt spray, freeze-thaw cycles, or a covered terrace. The finish schedule then matches the swim spa to the surrounding pool deck, wall cladding and paving already specified for the project.
Because SANTERSON supplies building and construction materials alongside furniture, the same project can carry the deck, wall and ceiling finishes around the spa. Coordinating those selections in one submittal package keeps the material palette consistent and removes a handover argument between trades.
6. Logistics, packaging and site access
Include the packing method, container type and loading plan, the shipping route and Incoterms for the quotation, and the delivery point on site. Our logistics and door-to-door delivery service covers freight forwarding by sea, air and rail, customs paperwork such as commercial invoices, packing lists and certificates of origin, packaging and container loading, shipment tracking and delivery to the site address. Import terms, duties, transit time and the exact delivery scope are confirmed case by case for each project, and we state that in writing rather than assuming a standard service level.
Attach a simple access sketch showing where the crane or forklift picks up, the path to the pad, and any overhead obstruction such as power lines or a pergola beam. This one page prevents the most expensive avoidable cost on a swim spa project: a delivery that cannot be completed.
7. Installation sequence, commissioning and handover
Set out the sequence in the submittal so the main contractor can build it into the programme: slab and pad preparation with the correct load and level tolerance, crane set and placement, connection of power, water and waste, plant-room fit-out, filling, commissioning of jets, ozone and lighting, then handover documentation with operating instructions for the control system.
Our installation and after-sales support page describes on-site installation, inspection and snag resolution, warranty coverage, spare parts and replacement, and ongoing maintenance. Warranty terms, response times, exclusions and local installer availability are confirmed per project before they are relied upon in a contract document.
8. Documentation, sign-off sheet and comparison data
Close the package with the paperwork a consultant expects to see stamped: catalogue specification sheets for the exact model, dimensional drawings, the electrical schedule, material and finish samples, packaging and loading photographs, and the warranty and after-sales terms as stated in the quotation. A one-page sign-off sheet listing each attachment with space for reviewer initials turns the file into an approval record instead of a bundle of PDFs.
If alternatives are under evaluation, add a short comparison table using catalogue data only. The neighbouring Outdoor Swim Spa WS-S08M, for example, is recorded at 8020 × 2260 × 1280 mm with a jet total of 58 pcs and the same 6.95 kW catalogue figure, while Outdoor Swim Spa WS-S06 is recorded at 5820 × 2220 × 1110 mm with 56 jets and a waterfall among its shown features. Comparing footprint, jet count and feature set side by side shows which shell the site can actually take.
Common reasons a submittal is returned
- The model name in the drawings does not match the model on the quotation and the specification sheet.
- Options such as heat pump, UV sterilization or steps are described but never priced or excluded.
- Total power is quoted without phase, voltage, protection and bonding details.
- A swim training system is assumed for a model whose specification does not list one.
- Overall dimensions are given with no section drawing, so water depth and coping detail stay unknown.
- No access or lifting sketch, leaving site transport to be discovered on delivery day.
Send us the model, the site address and your consultant's submittal template, and we will return a complete WS-S06M package with the specification sheets, drawings and option list already filled in. Talk to our project team about turnkey villa and hospitality furnishing if the spa is part of a wider outdoor and interior fit-out.