A swim spa shell is only half of the order. Before a production slot is booked, the buyer and supplier need to agree on what actually arrives on the pallet, how it is finished, and which items are added later on site. This article uses Outdoor Swim Spa WS-S06M as a worked example of the finish details worth putting in writing, so that the quotation, the drawing and the delivered unit all describe the same product.
1. Shell footprint and water depth
The catalog lists WS-S06M at 5900 × 2200 × 1610 mm. Two separate dimensions matter on site, and they are often conflated in a single line of a quotation:
- Overall envelope — the external box the unit occupies, which drives the concrete pad, clearances for maintenance access and any pergola or enclosure built around it.
- Internal water depth and step arrangement — what determines usable seating height and whether adults can stand comfortably in the jet zone.
Ask for a dimensioned drawing that shows both, with the pad level marked. A footprint figure alone does not tell the site team where the water line sits relative to the finished deck.
2. Jet layout, not just jet count
The catalog specification for this model shows 48 jets in total and four water columns. The number alone is a weak basis for comparison between models; the arrangement is what a buyer actually feels in use. Confirm in writing:
- which jet positions face each seat, and whether any are adjustable or directional;
- where the four water columns discharge, and how their height and angle are set;
- which pump feeds which zone, since this model is listed with two water pumps and one filter pump.
This last point matters when a project wants a massage zone and a calmer seating zone on the same shell. Zoning should appear on the electrical drawing, not only in a marketing description.
3. Lighting finish and control grouping
The listed lighting for WS-S06M is 17 LED lights plus 17 small LED lights. Two details change how the installation runs:
- whether the fixtures run on one circuit and one controller, or are grouped so ambient and accent lighting can be set separately;
- the colour temperature or colour mode offered, and whether a remote or wall panel is included in that price.
For a hotel pool deck or a villa terrace, the control grouping decides how the electrician wires the spa into the building's lighting scheme. Agree it before cables are pulled.
4. Water treatment: what is standard and what is optional
Ozone is shown as a feature on this model. UV sterilisation, by contrast, appears in the optional-accessories list rather than in the specification block, along with sand filtration, heat pumps, insulation, extra water pumps, additional control systems and steps. The practical consequence is simple: two quotations for "WS-S06M" can differ materially depending on which of these are included.
For each item, ask the supplier to mark it as standard, optional or excluded on the quotation itself. Treatment choice also affects the maintenance routine handed to the facility team, so it should be settled before handover documents are written.
5. Power and control: reconcile figures before wiring
The catalog lists total power of 6.95 kW for this configuration. Treat that figure as the starting point for an electrical discussion, not as the final answer, because it moves with the options selected — a heat pump or an added pump changes the load. Confirm:
- supply voltage and phase for the destination project;
- cable size, breaker rating and the location of the isolator;
- who supplies the final circuit and who supplies the spa connection — a gap here is a common cause of delay at handover.
Where a specification sheet and a configuration drawing disagree on a figure, get one document marked as governing. Do not let two versions travel to site.
6. Configuration variants across the same range
The S06 family is listed in several configurations, and their specification blocks are not interchangeable. The standard WS-S06 entry, for instance, lists a different shell height and jet count from WS-S06M, while the swim-training variant WS-S06CT lists a swim training system as part of its specification. Where a model entry does not list a swim training system, treat it as unconfirmed and ask rather than assume the feature is present or absent.
If a project needs lap swimming in one zone and hydrotherapy seating in another, that requirement should drive the model choice — and it belongs in the enquiry, not in a change request after production starts. Buyers weighing an arrangement outside the standard shapes can look at a Customizable Shape Outdoor Spa instead of forcing a standard shell into an awkward site.
7. Packaging, delivery and the on-site sequence
A swim spa is a crane-or-crane-free decision, and that decision depends on packaging. Ask how the unit is packed, what size opening it must pass through, and whether steps, handrails and lighting fixtures travel loose or pre-fitted. The service scope SANTERSON describes covers freight and door-to-door delivery, then installation and after-sales support, so the buyer should confirm which of those stages are included for this project and where supplier responsibility ends.
Write the sequence down: pad cured, power pulled, unit set, plumbing and electrical connected, commissioning witnessed, spares handed over. Every party on site works to the same line.
8. What to hold before releasing production
A short list closes most disputes before they start:
- dimensioned drawing with envelope, water line and pad level;
- jet and water-column layout keyed to the seat positions;
- option list marked standard / optional / excluded, including treatment and heating;
- electrical drawing stating voltage, phase, load and circuit responsibility;
- packing and access plan, plus the commissioning checklist for handover.
None of these documents is unusual to request, and none costs extra at quotation stage. What they prevent is a delivered unit that matches the model name but not the project's expectation — which is where swim spa disputes usually begin.
To confirm the configuration, options and electrical requirements for a specific project, contact SANTERSON with the site drawings and the intended use of each zone.